[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111116":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1111116,786,1,"单选题","针对危险性较大的工程编制的专项施工方案必须由()进行现场监督实施。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","技术负责人",false,{"key":16,"text":17,"correct":14},"B","班组负责人",{"key":19,"text":20,"correct":14},"C","监理工程师",{"key":22,"text":23,"correct":24},"D","专职安全生产管理人员",true,"(2)专项施工方案实施前，编制人员或项目技术负责人应当向项目施工、技术、安全、质量管理人员和作业人员进行安全技术交底。(3)施工单位应当指定专职安全生产管理人员对专项施工方案实施情况进行现场监督，发现不按照专项施工方案施工的，应当要求其立即整改。整改合格的，方可进行下一道工序。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]