[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111106":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1111106,786,1,"单选题","进度计划调整过程中，压缩关键工作持续时间可采用的管理措施是（ ）。（2017年真题）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","优化工作控制流程",false,{"key":16,"text":17,"correct":14},"B","改进施工方法",{"key":19,"text":20,"correct":14},"C","提供加快进度所需资金",{"key":22,"text":23,"correct":24},"D","采用信息技术进行计划调整",true,"考点:工程进度的控制。选项A属于组织措施；选项B属于技术措施；选项C属于经济措施。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]