[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110966":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1110966,786,1,"单选题","关于土石路堤筑要求的说法，错误的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","土石路堤不得倾填",false,{"key":16,"text":17,"correct":18},"B","压实后透水性差异大的土石混合料，宜纵向分幅填筑",true,{"key":20,"text":21,"correct":14},"C","压实机械宜采用自重不小于18t的振动压路机",{"key":23,"text":24,"correct":14},"D","中硬、硬质石料的土石路堤应进行边坡码砌","压实后透水性差异大的土石混合材料，应分层或分段填筑，不宜纵向分幅填筑。故选B",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]