[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110954":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1110954,786,1,"单选题","（2020年真题）关于高填方路基沉降原因的说法，正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","未设置反压护道",false,{"key":16,"text":17,"correct":14},"B","高填方路堤两侧超填宽度过宽",{"key":19,"text":20,"correct":21},"C","路堤固结沉降",true,{"key":23,"text":24,"correct":14},"D","路基边缘压实遍数不够","P44-45 沉降原因分析： 1.按一般路堤设计，没有验算路堤稳定性、地基承载力和沉降量。 2.地基处理不彻底，压实度达不到要求，或地基承载力不够。 3.高填方路堤两侧超填宽度不够。 4.工程地质不良，且未作地基孔隙水压力观察。 5.路堤受水浸泡部分边坡陡，填料土质差。 6.路堤填料不符合规定，随意增大填筑层厚度，压实不均匀，且达不到规定要求。 7.路堤固结沉降。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]