[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110914":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1110914,786,1,"单选题","以下设计变更属于重大设计变更范畴的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","超过初步设计批准概算",true,{"key":16,"text":17,"correct":18},"B","连续长度2km以上（10km以下）的路线方案调整",false,{"key":20,"text":21,"correct":18},"C","单项工程费用变化超过500万元的变更",{"key":23,"text":24,"correct":18},"D","变更路面结构类型、宽度和厚度","2020版教材P333 有下列情形之一的属于重大设计变更：连续长度10km以上的路线方案调整的；特大桥的数量或结构型式发生变化的；特长隧道的数量或通风方案发生变化的；互通式立交的数量发生变化的；收费方式及站点位置、规模发生变化的；超过初步设计批准概算的。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]