[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110879":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1110879,786,1,"单选题","在中标通知书发出后合同规定的时间内，承包人应向（ ）书面提交一份详细和格式符合要求的工程总体进度计划。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","监理工程师",true,{"key":16,"text":17,"correct":18},"B","业主",false,{"key":20,"text":21,"correct":18},"C","质量监督站",{"key":23,"text":24,"correct":18},"D","上级公司","2020版教材P204 在中标通知书发出后合同规定的时间内，承包人应向监理工程师书面提交一份详细和格式符合要求的工程总体进度计划及必要的各项关键工程的进度计划。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]