[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110844":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110844,786,1,"单选题","下列不属于工程量清单汇总表的内容的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","暂列金额",false,{"key":16,"text":17,"correct":14},"B","计日工合计",{"key":19,"text":20,"correct":14},"C","投标报价",{"key":22,"text":23,"correct":24},"D","单价和单价分析",true,"2020版教材P280 工程量清单汇总表是将各章的工程子目表及计日工明细表进行汇总，再加上一定比例或数量（按招标文件规定） 的暂列金额而得出该项目的总报价，该报价与投标书中填写的投标总价是一致的’其格式见表2B320081-2。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]