[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110832":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1110832,786,1,"单选题","根据年度生产计划中计划的工程量和标后预算清单单价计算的预算成本是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目预测成本",false,{"key":16,"text":17,"correct":14},"B","项目预算成本",{"key":19,"text":20,"correct":21},"C","计划预算成本",true,{"key":23,"text":24,"correct":14},"D","实际预算成本","2020版教材P269 计划预算，直接成本是在施工过程中，根据年度生产计划中计划的工程量和标后预算清单单价计算的预算成本，是成本管理中编制成本计划的依据。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]