[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110824":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110824,786,1,"单选题","重大工程变更，业主在审批工程变更之前应事先取得（ ）的批准。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","业主单位的上级主管单位",false,{"key":16,"text":17,"correct":14},"B","施工单位的上级主管单位",{"key":19,"text":20,"correct":14},"C","监理单位的上级主管单位",{"key":22,"text":23,"correct":24},"D","国家计划主管部门",true,"2020版教材P263 重大工程变更的审批程序。重大工程变更通常指一些对工程造价的影响很大、可能超出设计概算（甚至投资估算）的工程变更。对这些工程变更工作，业主在审批工程变更之前应事先取得国家计划主管部门的批准。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]