[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110799":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1110799,786,1,"单选题","下列不属于预应力混凝土连续梁桥施工常见质量控制点的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","张拉力及预应力钢筋伸长量控制",true,{"key":16,"text":17,"correct":18},"B","支架浇筑时支架沉降量的控制",false,{"key":20,"text":21,"correct":18},"C","先简支后连续：后浇段工艺控制、体系转换工艺控制、后浇段收缩控制、临时支座安装与拆除控制",{"key":23,"text":24,"correct":18},"D","预应力粱：张拉预应力钢筋及压浆控制","2020版教材P223 连续梁桥 1）支架施工：支架沉降量的控制。 2）先简支后连续：后浇段工艺控制、体系转换工艺控制、后浇段收缩控制、临时支座安装与拆除控制。 4）预应力粱：张拉预应力钢筋及压浆控制。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]