[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110726":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110726,786,1,"单选题","某隧道是IV~ V级围岩，其覆盖层厚度为80~ 250m。有关隧道量测内容和方法论述错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","该隧道开挖后应及时进行围岩、初期支护的周边位移量测、拱顶下沉量测",false,{"key":16,"text":17,"correct":14},"B","该隧道初期支护完成后应进行喷层表面的观察和记录，并进行裂缝描述",{"key":19,"text":20,"correct":14},"C","该隧道如果围岩差、断面大或地表沉降控制严格时，宜进行围岩体内位移量测",{"key":22,"text":23,"correct":24},"D","该隧道全线应进行地表沉降量测",true,"2020版教材P164 隧道开挖后应及时进行围岩、初期支护的周边位移量测，拱顶下沉量测；安设铺杆后，应进行锚杆抗拔力试验。当围岩差、断面大或地表沉降控制严时宜进行围岩体内位移量测和其他量测。位于IV ~VI级围岩中且覆盖层厚度小于40m的隧道，应进行地表沉降量测。 @##",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]