[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110725":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1110725,786,1,"单选题","位于IV~ VI级围岩中且覆盖层厚度小于（ ）的隧道， 应进行地表沉降量测。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","35",false,{"key":16,"text":17,"correct":18},"B","40",true,{"key":20,"text":21,"correct":14},"C","45",{"key":23,"text":24,"correct":14},"D","50","2020版教材P164 位于IV ~VI级围岩中且覆盖层厚度小于40m的隧道，应进行地表沉降量测。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]