[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110724":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110724,786,1,"单选题","二次衬砌的施作时，应满足隧道位移相对值已达相对位移量的（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","40%~60%.",false,{"key":16,"text":17,"correct":14},"B","60%~80%",{"key":19,"text":20,"correct":14},"C","80%~90%.",{"key":22,"text":23,"correct":24},"D","90%以上",true,"2020版教材P165 隧道位移相对值已达到相对位移量的90%以上。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]