[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110654":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1110654,786,1,"单选题","先张法预应力筋张拉完毕后，与设计位置的偏差不得大于（ ），同时不得大于构件最短边长的4%。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2mm",false,{"key":16,"text":17,"correct":18},"B","5mm",true,{"key":20,"text":21,"correct":14},"C","2cm",{"key":23,"text":24,"correct":14},"D","5cm","2020版教材P131 先张法预应力筋张拉完毕后，与设计位置的偏差不得大于5mm，同时不得大于构件最短边长的4%。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]