[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110342":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110342,786,1,"单选题","关于工地试验外委管理的说法，不正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","外委试验应向项目建设单位报备",false,{"key":16,"text":17,"correct":14},"B","外委试验取样、送样过程应进行见证",{"key":19,"text":20,"correct":14},"C","接受外委试验的检测机构信用等级为B级及以上",{"key":22,"text":23,"correct":24},"D","同一合同段中各方外委试验可委托给同一家检测机构",true,"本题考查的是公路工程项目试验管理。工程建设项目的同一合同段中的施工、监理单位和检测机构不得将外委试验委托给同一家检测机构。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]