[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110329":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110329,786,1,"单选题","关于公路工程施工现场项目部驻地房屋的说法，正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目部驻地房屋必须自建",false,{"key":16,"text":17,"correct":14},"B","项目部驻地房屋为活动板房时搭建不宜超过三层",{"key":19,"text":20,"correct":14},"C","驻地办公区、生活区可采用电力取暖",{"key":22,"text":23,"correct":24},"D","项目部驻地房屋房间净高不低于2.6m",true,"可自建或租用沿线合适的单位或民用房屋，但应坚固、安全、实用、美观，并满足工作和生活需求，自建房还应安装拆卸方便且满足环保要求。 自建房屋最低标准为活动板房，建设宜选用阻燃材料，搭建不宜超过两层，每组最多不超过 10栋，组与组之间的距离不小于8m，栋与栋之间的距离不小于4m，房间净高不低于2．6m。驻地办公区、生活区应采用集中供暖设施，严禁电力取暖。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]