[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110323":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1110323,786,1,"单选题","单价合同工程量清单所列工程数量是指（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","实际发生的数量",false,{"key":16,"text":17,"correct":14},"B","监理工程师确认的数量",{"key":19,"text":20,"correct":21},"C","设计的预计数量",true,{"key":23,"text":24,"correct":14},"D","结算时的确认数量","工程量清单所列工程数量是指在实际施工生产前根据设计施工图纸和说明及工程量计算规则所得到的一种准确性较高的预算数量。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]