[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110318":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1110318,786,1,"单选题","关于公路工程标线施工技术要求的说法，错误的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","标段工程正式开工前应在实验室进行试划试验",true,{"key":16,"text":17,"correct":18},"B","正式划标段前，应首先清理路面，保证路面表面清洁干燥，然后根据设计图纸进行放样",false,{"key":20,"text":21,"correct":18},"C","划线前，通过控制划线机的行驶速度控制标线厚度",{"key":23,"text":24,"correct":18},"D","标线充分干燥前，应设置适当警告标志，阻止车辆及行人在作业区内通行","在标线工程正式开工前应进行实地试划试验。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]