[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110290":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110290,786,1,"单选题","关于结构物回填施工的说法，正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","涵背回填应采用倾填方法",false,{"key":16,"text":17,"correct":14},"B","桥台台背回填宜采用不透水的黏土作填料",{"key":19,"text":20,"correct":14},"C","桥台台背和锥坡的回填不能同步进行",{"key":22,"text":23,"correct":24},"D","挡土墙墙背回填结束后，顶部应及时封闭",true,"本题考查的是桥涵及结构物的回填施工技术。桥台背和锥坡的回填施工宜同步进行，一次填足并保证压实整修后能达到设计宽度要求。挡土墙墙背的回填方法：挡土墙墙趾部分的基坑，应及时回填压实，并做成向外倾斜的横坡。填土过程中防止水的侵害。回填结束后，顶部应及时封闭。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]