[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110285":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110285,786,1,"单选题","先张法浇筑空心板的施工工序如下：①安装充气胶囊；②浇筑底板混凝土；③绑扎定位箍筋和面板箍筋；④浇面板混凝土；⑤浇胶囊两侧混凝土，正确的施工顺序是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","②→③→①→④→⑤",false,{"key":16,"text":17,"correct":14},"B","③→②→①→④→⑤",{"key":19,"text":20,"correct":14},"C","①→②→⑤→③→④",{"key":22,"text":23,"correct":24},"D","②→①→③→⑤→④",true,"本题考查的是桥梁上部结构装配式施工。用龙门吊机吊运混凝上，先浇底板并振实，振捣时注意不得触及钢绞线，当底板浇至设计标高，将经检查合格的充气胶囊安装就位，用定位箍筋与外模联系，加以固定，防止上浮，同时绑扎面板钢筋，然后对称、均匀地浇胶囊两侧砼，最后浇筑面板砼，表面作拉毛处理。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]