[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110230":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1110230,786,1,"单选题","关于填隙碎石的说法，正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","填隙碎石层上为薄沥青面层时，宜使集料的棱角外露3～5mm",true,{"key":16,"text":17,"correct":18},"B","填隙碎石基层碾压完成后，如要开放交通，应限制车速",false,{"key":20,"text":21,"correct":18},"C","应由近到远将集料按计算的距离卸置于下承层上，应严格控制卸料距离",{"key":23,"text":24,"correct":18},"D","湿法施工时，宜待结构层稍变干燥后，用重型压路机碾压","本题考查的是填隙碎石施工。填隙碎石基层未洒透层沥青或未铺封层时，不得开放交通；应由远到近将集料按计算的距离卸置于下承层上，应严格控制卸料距离；宜用重型压路机跟在洒水车后碾压。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]