[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110226":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1110226,786,1,"单选题","填隙碎石的施工工艺包括：①运输和摊铺粗碎石；②撒布填隙料；③初压；④再次撒布填隙料；⑤振动压实。施工完后，拟检测如下项目：压实度、弯沉值、平整度、构造深度等。其施工工艺流程正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","①→②→③→④→⑤",false,{"key":16,"text":17,"correct":18},"B","①→③→②→⑤→④→⑤",true,{"key":20,"text":21,"correct":14},"C","①→③→②→④→⑤",{"key":23,"text":24,"correct":14},"D","①→②→③→⑤→④→⑤","本题考查的是填隙碎石施工。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]