[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110180":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1110180,786,1,"单选题","对路基产生“弹簧”且急于赶工的路段，可以采取（）的措施。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","增大压实机具功率",false,{"key":16,"text":17,"correct":18},"B","掺生石灰粉翻拌",true,{"key":20,"text":21,"correct":14},"C","适量洒水",{"key":23,"text":24,"correct":14},"D","掺碎石翻拌","对产生“弹簧土”的部位，可将其过湿土翻晒，或掺生石灰粉翻拌，待其含水量适宜后重新碾压；或挖除换填含水量适宜的良性土壤后重新碾压。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]