[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":571},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,7,50,2641,[13,34,46,58,70,82,94,106,117,129,141,153,163,173,182,194,205,217,229,241,250,258,270,282,292,304,316,326,338,350,358,370,381,393,405,413,425,433,445,457,469,481,490,502,510,519,529,541,551,563],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1107496,1,"单选题","根据工程特点，按（ ）的原则合理划分工程施工质量验收层次，将有利于对工程施工质量进行过程控制和阶段质量验收。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","结构分解",true,{"key":24,"text":25,"correct":26},"B","重要程度",false,{"key":28,"text":29,"correct":26},"C","隐蔽性",{"key":31,"text":32,"correct":26},"D","投资估算","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1107497,"根据《建筑工程施工质量验收统一标准》，分项工程应按（ ）划分。",[38,40,42,44],{"key":20,"text":39,"correct":26},"工程量.施工程序",{"key":24,"text":41,"correct":22},"主要工种.施工工艺",{"key":28,"text":43,"correct":26},"工程部位.施工特点",{"key":31,"text":45,"correct":26},"专业性质.楼层",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1107498,"工程施工质量验收的最小单位是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"分项工程",{"key":24,"text":53,"correct":22},"检验批",{"key":28,"text":55,"correct":26},"单项工程",{"key":31,"text":57,"correct":26},"分部工程",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1107499,"验收建筑节能分部工程质量，应由（ ）组织。",[62,64,66,68],{"key":20,"text":63,"correct":26},"施工单位技术负责人",{"key":24,"text":65,"correct":22},"总监理工程师",{"key":28,"text":67,"correct":26},"建设单位项目负责人",{"key":31,"text":69,"correct":26},"施工单位项目负责人",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1107500,"在工程施工质量验收活动中，（ ）向建设单位提交工程竣工报告，申请工程竣工验收。",[74,76,78,80],{"key":20,"text":75,"correct":26},"监理机构",{"key":24,"text":77,"correct":22},"施工单位",{"key":28,"text":79,"correct":26},"质检机构",{"key":31,"text":81,"correct":26},"行政主管部门",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1107501,"下列关于检验批质量验收合格的规定中，说法错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"主控项目的质量经全数检验均应合格",{"key":24,"text":89,"correct":26},"主控项目是对检验批的基本质量起决定性影响的检验项目",{"key":28,"text":91,"correct":26},"工程材料.构配件和设备的技术性能属于主控项目",{"key":31,"text":93,"correct":26},"一般项目的质量经抽样检验合格",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1107502,"在工程施工质量验收活动中，（ ）反映了检验批从原材料到最终验收的各施工工序的操作依据、检查情况以及保证质量所必须的管理制度等。",[98,100,102,104],{"key":20,"text":99,"correct":22},"质量控制资料",{"key":24,"text":101,"correct":26},"竣工验收记录",{"key":28,"text":103,"correct":26},"阶段性验收记录",{"key":31,"text":105,"correct":26},"各检验批验收记录",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1107503,"在单位工程质量验收中，经总监理工程师和工程监理单位技术负责人审核签字后的工程质量评估报告应提交给（ ）。",[110,111,113,115],{"key":20,"text":77,"correct":26},{"key":24,"text":112,"correct":22},"建设单位",{"key":28,"text":114,"correct":26},"质量监督机构",{"key":31,"text":116,"correct":26},"设计单位",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1107504,"对涉及结构安全、节能、环境保护和主要使用功能的试块、试件及材料，应在进场时或施工中按规定进行（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"见证检验",{"key":24,"text":124,"correct":26},"抽样检验",{"key":28,"text":126,"correct":26},"全数检验",{"key":31,"text":128,"correct":26},"非破坏性检验",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},1107505,"工程施工过程中，对于一般项目，计量抽样的漏判概率是（ ），错判概率是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":26},"≤5%，≤5%",{"key":24,"text":136,"correct":26},"≤5%，≤10%",{"key":28,"text":138,"correct":22},"≤10%，≤5%",{"key":31,"text":140,"correct":26},"≤10%，≤10%",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},1107506,"根据工程施工质量验收的基本规定，对于主控项目，合格质量水平的错判概率和漏判概率均不宜超过（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":26},"3%",{"key":24,"text":148,"correct":22},"5%",{"key":28,"text":150,"correct":26},"10%",{"key":31,"text":152,"correct":26},"15%",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1107507,"凡涉及安全、节能、环境保护和主要使用功能的重要材料、产品，应按各专业工程施工规范、验收规范和设计文件等规定进行复验，并应经（ ）检查认可。",[157,158,160,161],{"key":20,"text":65,"correct":26},{"key":24,"text":159,"correct":22},"专业监理工程师",{"key":28,"text":112,"correct":26},{"key":31,"text":162,"correct":26},"项目经理",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},1107508,"根据施工质量验收的规定，施工现场质量管理检查记录表应由施工单位填写，然后由（ ）负责检查并做出检查结论。",[167,168,169,171],{"key":20,"text":65,"correct":22},{"key":24,"text":159,"correct":26},{"key":28,"text":170,"correct":26},"现场监理员",{"key":31,"text":172,"correct":26},"施工单位质量负责人",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},1107509,"工程施工过程中，同一项目重复利用同一抽样对象已有检验成果的实施方案时，应事先报（ ）认可。",[177,178,179,180],{"key":20,"text":112,"correct":26},{"key":24,"text":116,"correct":26},{"key":28,"text":77,"correct":26},{"key":31,"text":181,"correct":22},"项目监理机构",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":24,"analysis":33},1107510,"当个别检验批发现问题，难以确定能否验收时，应请具有资质的法定检测单位进行检测鉴定。当鉴定结果认为能够达到设计要求时，该检验批（ ）。",[186,188,190,192],{"key":20,"text":187,"correct":26},"重新进行验收",{"key":24,"text":189,"correct":22},"可予以验收",{"key":28,"text":191,"correct":26},"按技术处理方案和协商文件的要求予以验收",{"key":31,"text":193,"correct":26},"不予验收",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},1107511,"建筑工程施工质量验收中，经返工或返修的检验批，应（ ）。",[198,200,201,203],{"key":20,"text":199,"correct":26},"予以验收",{"key":24,"text":187,"correct":22},{"key":28,"text":202,"correct":26},"鉴定验收",{"key":31,"text":204,"correct":26},"协商验收",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},1107512,"施工质量不合格经加固补强的分项、分部工程，通过改变外形尺寸仍能满足安全使用要求的，可按（ ）和协商文件进行验收。",[209,211,213,215],{"key":20,"text":210,"correct":22},"技术处理方案",{"key":24,"text":212,"correct":26},"设计单位意见",{"key":28,"text":214,"correct":26},"设计变更文件",{"key":31,"text":216,"correct":26},"建设单位要求",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":24,"analysis":33},1107513,"下列关于城市轨道交通工程竣工验收的内容和程序的描述不正确的是（ ）。",[221,223,225,227],{"key":20,"text":222,"correct":26},"建设单位汇报试运行情况",{"key":24,"text":224,"correct":22},"建设单位应在竣工验收合格之日起7个工作日内，将竣工验收报告和相关文件，报城市建设主管部门备案",{"key":28,"text":226,"correct":26},"验收委员会质询相关单位，讨论并形成验收意见",{"key":31,"text":228,"correct":26},"验收委员会签署工程竣工验收报告，并对遗留问题做出处理决定",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":28,"analysis":33},1107514,"下列关于城市轨道交通工程项目工程验收的内容和程序表述不正确的是（ ）。",[233,235,237,239],{"key":20,"text":234,"correct":26},"各验收小组实地查验工程质量，复查单位工程验收遗留问题的整改情况",{"key":24,"text":236,"correct":26},"验收组对工程勘察.设计.施工.监理.设备安装质量等方面进行评价，审查对试运行有影响的相关专项验收情况",{"key":28,"text":238,"correct":22},"城市轨道交通建设工程自竣工验收合格之日起可投入不载客试运行，试运行时间不应少于三个月",{"key":31,"text":240,"correct":26},"审查系统设备联合调试情况，签署项目工程验收意见",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":31,"analysis":33},1107515,"由于保修工作千差万别，（ ）应根据具体项目的工作量决定保修期间的具体工作计划，并根据相关合同约定具体决定工作方式和资料留存。",[245,246,247,248],{"key":20,"text":112,"correct":26},{"key":24,"text":116,"correct":26},{"key":28,"text":77,"correct":26},{"key":31,"text":249,"correct":22},"监理单位",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1107516,"在工程保修阶段，（ ）应对工程质量缺陷原因进行调查，组织相关单位对于质量缺陷责任归属进行界定。",[254,255,256,257],{"key":20,"text":112,"correct":26},{"key":24,"text":79,"correct":26},{"key":28,"text":77,"correct":26},{"key":31,"text":249,"correct":22},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1107517,"下列关于城市轨道交通工程单位工程验收的内容和程序描述不正确的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"检查单位工程实体质量时涉及运营及使用功能的部位应全数检测",{"key":24,"text":265,"correct":26},"检查施工单位自检报告及施工技术资料时包含主要产品的质量保证资料及合格报告",{"key":28,"text":267,"correct":26},"建设.勘察.设计.施工.监理等单位分别汇报工程合同履约情况和在工程建设各个环节执行法律.法规和工程建设强制性标准的情况",{"key":31,"text":269,"correct":26},"工程质量监督机构出具验收监督意见",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},1107518,"下列关于城市轨道交通工程的验收表述不正确的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":26},"单位工程验收合格且通过相关专项验收后，方可组织项目工程验收",{"key":24,"text":277,"correct":22},"项目工程验收合格后，建设单位应组织不载客试运行，试运行一个月.并通过全部专项验收后，方可组织竣工验收",{"key":28,"text":279,"correct":26},"竣工验收合格后，城市轨道交通建设工程方可履行相关试运营手续",{"key":31,"text":281,"correct":26},"城市轨道交通建设工程验收分为单位工程验收.项目工程验收.竣工验收三个阶段",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},1107519,"一般情况下，检验批和（ ）两者具有相同或相近的性质，只是批量的大小不同而已。",[286,288,289,290],{"key":20,"text":287,"correct":26},"单位工程",{"key":24,"text":51,"correct":22},{"key":28,"text":57,"correct":26},{"key":31,"text":291,"correct":26},"子分部工程",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":31,"analysis":33},1107520,"工程竣工预验收合格后，项目监理机构应向建设单位提交（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":26},"工程预验收合格报告",{"key":24,"text":299,"correct":26},"工程竣工报告",{"key":28,"text":301,"correct":26},"工程竣工验收报告",{"key":31,"text":303,"correct":22},"工程质量评估报告",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1107521,"在工程施工质量验收活动中，建筑工程投入使用前的最后一次验收，也是最重要的一次验收是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":26},"单项工程质量验收",{"key":24,"text":311,"correct":22},"单位工程质量验收",{"key":28,"text":313,"correct":26},"子单位工程质量验收",{"key":31,"text":315,"correct":26},"子单项工程质量验收",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},1107522,"单位工程观感质量检查记录表中的质量评价结果的填写原则，可由（ ）确定。",[320,321,322,324],{"key":20,"text":112,"correct":26},{"key":24,"text":249,"correct":26},{"key":28,"text":323,"correct":26},"评价机构",{"key":31,"text":325,"correct":22},"各方协商",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":28,"analysis":33},1107523,"检验批质量验收时，主控项目必须全部符合有关（ ）的规定。",[330,332,334,336],{"key":20,"text":331,"correct":26},"工程监理规范",{"key":24,"text":333,"correct":26},"工程技术规程",{"key":28,"text":335,"correct":22},"专业验收规范",{"key":31,"text":337,"correct":26},"质量验收统一标准",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":31,"analysis":33},1107524,"对于钢筋连接的一般项目，钢筋的接头末端至钢筋弯起点的距离不应小于钢筋直径的（ ）倍。",[342,344,346,348],{"key":20,"text":343,"correct":26},"3",{"key":24,"text":345,"correct":26},"5",{"key":28,"text":347,"correct":26},"9",{"key":31,"text":349,"correct":22},"10",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":20,"analysis":33},1107525,"根据《建筑施工质量验收统一标准》，涉及安全、节能、环境保护等项目的专项验收要求，应由（ ）组织专家论证。",[354,355,356,357],{"key":20,"text":112,"correct":22},{"key":24,"text":249,"correct":26},{"key":28,"text":116,"correct":26},{"key":31,"text":77,"correct":26},{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1107526,"根据工程施工质量验收的基本规定，专项验收要求应符合（ ），包括分项工程及检验批的划分、抽样方案、验收方法、判定指标等内容。",[362,364,366,368],{"key":20,"text":363,"correct":22},"设计要求",{"key":24,"text":365,"correct":26},"施工要求",{"key":28,"text":367,"correct":26},"建设单位的要求",{"key":31,"text":369,"correct":26},"监理单位的要求",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":28,"analysis":33},1107527,"工程施工过程中，采用计数抽样检验时，检验批容量为200时的最小抽样数量是（ ）。",[374,375,377,379],{"key":20,"text":345,"correct":26},{"key":24,"text":376,"correct":26},"8",{"key":28,"text":378,"correct":22},"13",{"key":31,"text":380,"correct":26},"20",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":28,"analysis":33},1107528,"室外工程可根据（ ）划分为子单位工程。",[385,387,389,391],{"key":20,"text":386,"correct":26},"施工工序",{"key":24,"text":388,"correct":26},"建筑设计分区",{"key":28,"text":390,"correct":22},"专业类别和工程规模",{"key":31,"text":392,"correct":26},"使用功能的差异",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},1107529,"根据《建筑工程施工质量验收统一标准》，单层建筑的分项工程可按（ ）等划分检验批。",[397,399,401,403],{"key":20,"text":398,"correct":22},"变形缝",{"key":24,"text":400,"correct":26},"工程量",{"key":28,"text":402,"correct":26},"施工段",{"key":31,"text":404,"correct":26},"楼层",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":31,"analysis":33},1107530,"在工程施工质量验收层次中，分部工程的组成部分是（ ）。",[409,410,411,412],{"key":20,"text":287,"correct":26},{"key":24,"text":55,"correct":26},{"key":28,"text":53,"correct":26},{"key":31,"text":51,"correct":22},{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1107531,"建筑装饰装修、屋面、建筑节能、电梯等工程，是分部工程按（ ）进行划分的。",[417,419,421,423],{"key":20,"text":418,"correct":26},"材料种类",{"key":24,"text":420,"correct":22},"专业性质.工程部位",{"key":28,"text":422,"correct":26},"施工特点",{"key":31,"text":424,"correct":26},"施工程序",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},1107532,"从质量验收的角度划分，某城市的广播电视塔应划分为一个（ ）。",[429,430,431,432],{"key":20,"text":51,"correct":26},{"key":24,"text":57,"correct":26},{"key":28,"text":287,"correct":22},{"key":31,"text":55,"correct":26},{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":20,"analysis":33},1107534,"任何建筑产品在适用、耐久、安全、可靠、经济以及与环境协调性方面都必须达到基本要求。但不同专业的工程，其环境条件、技术经济条件的差异使其质量特点有不同的（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"侧重面",{"key":24,"text":440,"correct":26},"选择范围",{"key":28,"text":442,"correct":26},"内在界限",{"key":31,"text":444,"correct":26},"内在关系",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},1107535,"工程满足使用目的的各种性能，这体现了建设工程质量的（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"适用性",{"key":24,"text":452,"correct":26},"耐久性",{"key":28,"text":454,"correct":26},"安全性",{"key":31,"text":456,"correct":26},"可靠性",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},1107536,"环境条件是指对工程质量特性起重要作用的环境因素，（ ）属于工程技术环境。",[461,463,465,467],{"key":20,"text":462,"correct":26},"通风照明条件",{"key":24,"text":464,"correct":22},"工程地质",{"key":28,"text":466,"correct":26},"施工环境作业面大小",{"key":31,"text":468,"correct":26},"临近的地下管线",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1107537,"工程建设活动中，形成工程实体质量的决定性环节在（ ）阶段。",[473,475,477,479],{"key":20,"text":474,"correct":26},"工程设计",{"key":24,"text":476,"correct":22},"工程施工",{"key":28,"text":478,"correct":26},"工程决策",{"key":31,"text":480,"correct":26},"工程竣工验收",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},1107538,"工业厂房要能满足生产生活需要，道路、桥梁、铁路、航道要能通达便捷，属（ ）的质量范畴。",[485,486,487,488],{"key":20,"text":450,"correct":22},{"key":24,"text":454,"correct":26},{"key":28,"text":456,"correct":26},{"key":31,"text":489,"correct":26},"与环境的协调性",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},1107539,"建设工程必须满足特定的使用功能，并具有在规定的时间和条件下完成规定功能的能力和达到规定要求的使用年限，可用于描述这些要求的质量特性有（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":26},"适用性和节能性",{"key":24,"text":497,"correct":26},"安全性和经济性",{"key":28,"text":499,"correct":22},"可靠性和耐久性",{"key":31,"text":501,"correct":26},"经济性和可靠性",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},1107540,"工业生产用的管道防“跑、冒、滴、漏”属（ ）的质量范畴。",[506,507,508,509],{"key":20,"text":450,"correct":26},{"key":24,"text":454,"correct":26},{"key":28,"text":456,"correct":22},{"key":31,"text":489,"correct":26},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},1107542,"建设工程质量是指工程满足相关标准规定和（ ）要求的程度。",[514,516,517,518],{"key":20,"text":515,"correct":22},"合同约定",{"key":24,"text":116,"correct":26},{"key":28,"text":77,"correct":26},{"key":31,"text":114,"correct":26},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},1107546,"建设活动主体资格的管理属于（ ）的管理职能。",[523,525,527,528],{"key":20,"text":524,"correct":26},"业主",{"key":24,"text":526,"correct":22},"政府",{"key":28,"text":249,"correct":26},{"key":31,"text":77,"correct":26},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},1107547,"在正常使用条件下，房屋建筑主体结构工程的最低保修期为（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":26},"建设单位要求的使用年限",{"key":24,"text":536,"correct":22},"设计文件规定的合理使用年限",{"key":28,"text":538,"correct":26},"30年",{"key":31,"text":540,"correct":26},"50年",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1107548,"接受委托，依据国家有关法律、法规和工程建设强制性标准，对涉及结构安全项目的抽样检测和对进入施工现场的建筑材料、构配件的见证取样检测的机构是（ ）。",[545,546,548,549],{"key":20,"text":75,"correct":26},{"key":24,"text":547,"correct":22},"工程质量检测机构",{"key":28,"text":116,"correct":26},{"key":31,"text":550,"correct":26},"工程质量监督机构",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},1107549,"根据《中华人民共和国建筑法》规定，除国务院建设行政主管部门确定的限额以下的小型工程外，建设工程开工前，建设单位应当按照国家有关规定向（ ）级以上人民政府建设行政主管部门申请领取施工许可证。",[555,557,559,561],{"key":20,"text":556,"correct":26},"建设单位所在地县",{"key":24,"text":558,"correct":22},"工程所在地县",{"key":28,"text":560,"correct":26},"建设单位所在地市",{"key":31,"text":562,"correct":26},"工程所在地市",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},1107550,"（ ）收到建设工程竣工报告后，应当组织设计、施工、工程监理等有关单位进行竣工验收。",[567,568,569,570],{"key":20,"text":249,"correct":26},{"key":24,"text":112,"correct":22},{"key":28,"text":77,"correct":26},{"key":31,"text":114,"correct":26},[572,575,578,581,584,587],{"id":15,"name":573,"category":7,"favorite":574},"领导干部任职前廉政法规知识测试题",92,{"id":576,"name":577,"category":7,"favorite":15},595,"建筑结构与设备",{"id":579,"name":580,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":582,"name":583,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":585,"name":586,"category":7,"favorite":8},534,"BIM工程师",{"id":588,"name":586,"category":7,"favorite":8},535]