[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-50":3},{"library":4,"page":9,"limit":9,"total":10,"questions":11,"related":593},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,50,2641,[12,33,45,57,69,81,93,105,117,129,141,152,164,176,187,198,210,222,232,244,256,267,279,291,303,315,327,339,351,362,370,380,392,401,411,421,433,445,457,469,479,491,503,515,527,539,551,563,573,585],{"id":13,"libraryId":5,"type":14,"typeLabel":15,"stem":16,"options":17,"answer":23,"analysis":32},1109971,1,"单选题","工器具及生产家具购置费是指新建项目或扩建项目初步设计规定所必须购置的（）设备、仪器、工卡模具、器具、生产家具和备品备件的费用。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","达到固定资产标准的",false,{"key":23,"text":24,"correct":25},"B","不够固定资产标准的",true,{"key":27,"text":28,"correct":21},"C","带备件的",{"key":30,"text":31,"correct":21},"D","自制","",{"id":34,"libraryId":5,"type":14,"typeLabel":15,"stem":35,"options":36,"answer":30,"analysis":32},1109972,"某项目拟从国外进口一套设备，重1000吨，装运港船上交货价300万美元，国际运费标准每吨36万美元，海上运输保险费率0.266%。美元银行外汇牌价6.1元人民币。则该套设备国外运输保险费为（ ）万元。",[37,39,41,43],{"key":19,"text":38,"correct":21},"4.868",{"key":23,"text":40,"correct":21},"4.881",{"key":27,"text":42,"correct":21},"5.452",{"key":30,"text":44,"correct":25},"5.467",{"id":46,"libraryId":5,"type":14,"typeLabel":15,"stem":47,"options":48,"answer":23,"analysis":32},1109973,"某企业拟进口一套机电设备，离岸价折合人民币为1830万元，国际运费和国外运输保险费为22.53万元，银行手续费为15万元，关税税率为22%，增值税税率为16%，则该进口设备的增值税为（ ）万元",[49,51,53,55],{"key":19,"text":50,"correct":21},"362.1",{"key":23,"text":52,"correct":25},"361.61",{"key":27,"text":54,"correct":21},"356.86",{"key":30,"text":56,"correct":21},"296.40",{"id":58,"libraryId":5,"type":14,"typeLabel":15,"stem":59,"options":60,"answer":30,"analysis":32},1109974,"在计算建设工程设备工器具购置费时，国产标准设备原价一般是指( )",[61,63,65,67],{"key":19,"text":62,"correct":21},"设备出厂价与采购保管费之和",{"key":23,"text":64,"correct":21},"设备购置费",{"key":27,"text":66,"correct":21},"设备出厂价与运杂费之和",{"key":30,"text":68,"correct":25},"设备出厂价",{"id":70,"libraryId":5,"type":14,"typeLabel":15,"stem":71,"options":72,"answer":30,"analysis":32},1109975,"进口设备增值税额应以()乘以增值税率计算。",[73,75,77,79],{"key":19,"text":74,"correct":21},"到岸价格",{"key":23,"text":76,"correct":21},"离岸价格",{"key":27,"text":78,"correct":21},"关税与消费税之和",{"key":30,"text":80,"correct":25},"组成计税价格",{"id":82,"libraryId":5,"type":14,"typeLabel":15,"stem":83,"options":84,"answer":30,"analysis":32},1109976,"下列选项中，不属于工程建设其他费用的工程保险费的是（）。",[85,87,89,91],{"key":19,"text":86,"correct":21},"建筑工程一切险",{"key":23,"text":88,"correct":21},"安装工程一切险",{"key":27,"text":90,"correct":21},"机器损坏保险",{"key":30,"text":92,"correct":25},"工伤保险",{"id":94,"libraryId":5,"type":14,"typeLabel":15,"stem":95,"options":96,"answer":30,"analysis":32},1109977,"下列费用中，属于工程建设其他费用的是( )。",[97,99,101,103],{"key":19,"text":98,"correct":21},"设备及工器具购置费",{"key":23,"text":100,"correct":21},"建设期利息",{"key":27,"text":102,"correct":21},"基本预备费",{"key":30,"text":104,"correct":25},"勘察设计费",{"id":106,"libraryId":5,"type":14,"typeLabel":15,"stem":107,"options":108,"answer":27,"analysis":32},1109978,"工程建设中，建设单位所需的宿舍、办公室等临时设施的费用应计入（）。",[109,111,113,115],{"key":19,"text":110,"correct":21},"建安工程费用中的临时设施费",{"key":23,"text":112,"correct":21},"建设单位管理费中的开办费",{"key":27,"text":114,"correct":25},"工程建设其他费用中的临时设施费",{"key":30,"text":116,"correct":21},"建安工程费用中的措施费",{"id":118,"libraryId":5,"type":14,"typeLabel":15,"stem":119,"options":120,"answer":27,"analysis":32},1109979,"根据现行规定，工程质量监督检测费属于（）。",[121,123,125,127],{"key":19,"text":122,"correct":21},"建设单位开办费",{"key":23,"text":124,"correct":21},"建设工程监理费",{"key":27,"text":126,"correct":25},"建设单位经费",{"key":30,"text":128,"correct":21},"研究试验费",{"id":130,"libraryId":5,"type":14,"typeLabel":15,"stem":131,"options":132,"answer":23,"analysis":32},1109980,"下列费用中，属于建设单位管理费的是( )。",[133,135,137,139],{"key":19,"text":134,"correct":21},"拆迁补偿费",{"key":23,"text":136,"correct":25},"工程招标费",{"key":27,"text":138,"correct":21},"环境影响评价费",{"key":30,"text":140,"correct":21},"工程保险费",{"id":142,"libraryId":5,"type":14,"typeLabel":15,"stem":143,"options":144,"answer":19,"analysis":32},1109981,"在我国建设投资的构成中，下列不属于建设单位经费的是（ ）。",[145,147,149,150],{"key":19,"text":146,"correct":25},"工程监理费",{"key":23,"text":148,"correct":21},"业务招待费",{"key":27,"text":136,"correct":21},{"key":30,"text":151,"correct":21},"竣工验收费",{"id":153,"libraryId":5,"type":14,"typeLabel":15,"stem":154,"options":155,"answer":30,"analysis":32},1109983,"下列不属于取得国有土地使用费的是（）。",[156,158,160,162],{"key":19,"text":157,"correct":21},"土地使用权出让金",{"key":23,"text":159,"correct":21},"城市建设配套费",{"key":27,"text":161,"correct":21},"临时安置补助费",{"key":30,"text":163,"correct":25},"土地管理费",{"id":165,"libraryId":5,"type":14,"typeLabel":15,"stem":166,"options":167,"answer":27,"analysis":32},1109984,"工程建设其他费用中的研究试验费包括（",[168,170,172,174],{"key":19,"text":169,"correct":21},"对建筑材料、构件和建筑安装物进行一般鉴定、检查所发生的费用",{"key":23,"text":171,"correct":21},"试验部门及附属生产单位使用的固定资产费用",{"key":27,"text":173,"correct":25},"设计规定在施工中必须进行试验、验证所需费用",{"key":30,"text":175,"correct":21},"材料一般鉴定",{"id":177,"libraryId":5,"type":14,"typeLabel":15,"stem":178,"options":179,"answer":19,"analysis":32},1109985,"为建设工程提供或验证设计参数、数据资料等进行必要的研究试验以及设计规定在施工中进行的试验、验证所需费用应在( )中支出。",[180,182,184,186],{"key":19,"text":181,"correct":25},"业主方的研究试验费",{"key":23,"text":183,"correct":21},"施工方的检验试验费",{"key":27,"text":185,"correct":21},"业主方管理费",{"key":30,"text":104,"correct":21},{"id":188,"libraryId":5,"type":14,"typeLabel":15,"stem":189,"options":190,"answer":19,"analysis":32},1109986,"在建设项目中，进口设备检验鉴定费用应计入（）。",[191,193,194,196],{"key":19,"text":192,"correct":25},"引进技术和进口设备其他费",{"key":23,"text":128,"correct":21},{"key":27,"text":195,"correct":21},"设备安装工程费",{"key":30,"text":197,"correct":21},"进口设备购置费",{"id":199,"libraryId":5,"type":14,"typeLabel":15,"stem":200,"options":201,"answer":30,"analysis":32},1109987,"生产单位提前进厂参加施工、设备安装、调试的人员，其工资、工资性补贴等费用应从（）中支付",[202,204,206,208],{"key":19,"text":203,"correct":21},"建筑安装工程费",{"key":23,"text":205,"correct":21},"设备及工、器具购置费",{"key":27,"text":207,"correct":21},"建设单位管理费",{"key":30,"text":209,"correct":25},"生产准备费",{"id":211,"libraryId":5,"type":14,"typeLabel":15,"stem":212,"options":213,"answer":23,"analysis":32},1109988,"下列费用中，属于生产准备费的是（）。",[214,216,218,220],{"key":19,"text":215,"correct":21},"试运转所需的原料费",{"key":23,"text":217,"correct":25},"生产职工培训费",{"key":27,"text":219,"correct":21},"办公家具购置费",{"key":30,"text":221,"correct":21},"生活家具购置费",{"id":223,"libraryId":5,"type":14,"typeLabel":15,"stem":224,"options":225,"answer":30,"analysis":32},1109989,"办公和生活家具购置费属于（）。",[226,227,229,230],{"key":19,"text":205,"correct":21},{"key":23,"text":228,"correct":21},"与项目建设有关的其他费用",{"key":27,"text":209,"correct":21},{"key":30,"text":231,"correct":25},"与未来企业生产经营有关的其他费用",{"id":233,"libraryId":5,"type":14,"typeLabel":15,"stem":234,"options":235,"answer":23,"analysis":32},1109991,"某项目的建筑安装工程费为2000万元，设备购置费为600万元，工程建设其他费为100万元，建设期利息为60万元，铺底流动资金为160万元。若基本预备费的费率为10％，则基本预备费为（）万元。",[236,238,240,242],{"key":19,"text":237,"correct":21},"260",{"key":23,"text":239,"correct":25},"270",{"key":27,"text":241,"correct":21},"276",{"key":30,"text":243,"correct":21},"292",{"id":245,"libraryId":5,"type":14,"typeLabel":15,"stem":246,"options":247,"answer":27,"analysis":32},1109992,"某工程，设备及工器具购置费为5000万元，建筑安装工程费为10000万元，工程建设其他费为4000万元，铺底流动资金为6000万元，基本预备费率为5%。该项目估算的基本预备费应为( )万元。",[248,250,252,254],{"key":19,"text":249,"correct":21},"500",{"key":23,"text":251,"correct":21},"750",{"key":27,"text":253,"correct":25},"950",{"key":30,"text":255,"correct":21},"1250",{"id":257,"libraryId":5,"type":14,"typeLabel":15,"stem":258,"options":259,"answer":23,"analysis":32},1109993,"施工过程中可能增加工程量的费用，应计入（）。",[260,262,263,265],{"key":19,"text":261,"correct":21},"涨价预备费",{"key":23,"text":102,"correct":25},{"key":27,"text":264,"correct":21},"企业管理费",{"key":30,"text":266,"correct":21},"现场管理费",{"id":268,"libraryId":5,"type":14,"typeLabel":15,"stem":269,"options":270,"answer":27,"analysis":32},1109995,"某新建项目，建设期4年，分年均衡进行贷款，第一年贷款1000万元，以后各年贷款均为500万元，年贷款利率为6％，建设期内利息只计息不支付，该项目建设期利息为（）万元。",[271,273,275,277],{"key":19,"text":272,"correct":21},"76.80",{"key":23,"text":274,"correct":21},"106.80",{"key":27,"text":276,"correct":25},"366.30",{"key":30,"text":278,"correct":21},"389.35",{"id":280,"libraryId":5,"type":14,"typeLabel":15,"stem":281,"options":282,"answer":23,"analysis":32},1109996,"某项目建设期为2年，在建设期第1年贷款2000万元，第2年贷款3000万元，贷款年利率为8％，则该项目的建设期贷款利息估算为（）万元。",[283,285,287,289],{"key":19,"text":284,"correct":21},"286.40",{"key":23,"text":286,"correct":25},"366.40",{"key":27,"text":288,"correct":21},"560.00",{"key":30,"text":290,"correct":21},"572.80",{"id":292,"libraryId":5,"type":14,"typeLabel":15,"stem":293,"options":294,"answer":23,"analysis":32},1109999,"某投资项目建设期为3年，在建设期第1年贷款100万元，第2年贷款300万元，第3年贷款100万元，贷款年利率为6％。用复利法计算，该项目的建设期3年的贷款利息应为（）万元。",[295,297,299,301],{"key":19,"text":296,"correct":21},"62.18",{"key":23,"text":298,"correct":25},"46.27",{"key":27,"text":300,"correct":21},"28.09",{"key":30,"text":302,"correct":21},"15.18",{"id":304,"libraryId":5,"type":14,"typeLabel":15,"stem":305,"options":306,"answer":23,"analysis":32},1110000,"铺底流动资金一般按流动资金的（）计算。",[307,309,311,313],{"key":19,"text":308,"correct":21},"20％",{"key":23,"text":310,"correct":25},"30％",{"key":27,"text":312,"correct":21},"40％",{"key":30,"text":314,"correct":21},"35％",{"id":316,"libraryId":5,"type":14,"typeLabel":15,"stem":317,"options":318,"answer":27,"analysis":32},1110001,"某项目共需贷款资金900万元，建设期为3年，按年度均衡筹资，第1年贷款为400万元，第2年贷款为300万元，第3年贷款为200万。建设期内只计利息但不支付，年利率为10％，则第2年的建设期利息应为（）万元。",[319,321,323,325],{"key":19,"text":320,"correct":21},"50.0",{"key":23,"text":322,"correct":21},"51.5",{"key":27,"text":324,"correct":25},"57.0",{"key":30,"text":326,"correct":21},"77.0",{"id":328,"libraryId":5,"type":14,"typeLabel":15,"stem":329,"options":330,"answer":27,"analysis":32},1110002,"某建设项目建筑安装工程费为6000万元，设备购置费为1000万元，工程建设其他费用为2000万元，建设期利息为500万元。若基本预备费费率为5%，则该建设项目的基本预备费为（ ）万元。",[331,333,335,337],{"key":19,"text":332,"correct":21},"350",{"key":23,"text":334,"correct":21},"400",{"key":27,"text":336,"correct":25},"450",{"key":30,"text":338,"correct":21},"475",{"id":340,"libraryId":5,"type":14,"typeLabel":15,"stem":341,"options":342,"answer":27,"analysis":32},1110003,"某建设项目静态投资20000万元，项目建设前期年限为1年，建设期为2年，计划每年完成投资50%，年均投资价格上涨率为5%，该项目建设期涨价预备费为（ ）万元。",[343,345,347,349],{"key":19,"text":344,"correct":21},"1006.25",{"key":23,"text":346,"correct":21},"1525.00",{"key":27,"text":348,"correct":25},"2056.56",{"key":30,"text":350,"correct":21},"2601.25",{"id":352,"libraryId":5,"type":14,"typeLabel":15,"stem":353,"options":354,"answer":23,"analysis":32},1110004,"下列费用中，属于建设单位管理费的是（ ）。",[355,357,359,360],{"key":19,"text":356,"correct":21},"可行性研究费",{"key":23,"text":358,"correct":25},"工程竣工验收费",{"key":27,"text":138,"correct":21},{"key":30,"text":361,"correct":21},"安全预评价费",{"id":363,"libraryId":5,"type":14,"typeLabel":15,"stem":364,"options":365,"answer":19,"analysis":32},1110005,"根据设计要求，在施工过程中对某屋架结构进行破坏性试验，以提供和验证设计数据，则该项费用应在()中支出。",[366,367,368,369],{"key":19,"text":181,"correct":25},{"key":23,"text":183,"correct":21},{"key":27,"text":185,"correct":21},{"key":30,"text":104,"correct":21},{"id":371,"libraryId":5,"type":14,"typeLabel":15,"stem":372,"options":373,"answer":30,"analysis":32},1110006,"建设单位按照国家规定委托有资质的单位开展专项评价及有关验收工作发生的费用属于（ ）。",[374,376,377,378],{"key":19,"text":375,"correct":21},"安全文明施工费",{"key":23,"text":207,"correct":21},{"key":27,"text":209,"correct":21},{"key":30,"text":379,"correct":25},"专项评价费",{"id":381,"libraryId":5,"type":14,"typeLabel":15,"stem":382,"options":383,"answer":19,"analysis":32},1110007,"关于联合试运转费的说法，正确的是（ ）。",[384,386,388,390],{"key":19,"text":385,"correct":25},"试运转收入大于试运转支出的工程，不列此项费用",{"key":23,"text":387,"correct":21},"联合试运转费应包括单台设备调试费及无负荷联动试运转费用",{"key":27,"text":389,"correct":21},"试运转支出大于试运转收入的工程，不列此项费用",{"key":30,"text":391,"correct":21},"联合试运转支出主要是材料费，不包含人工费",{"id":393,"libraryId":5,"type":14,"typeLabel":15,"stem":394,"options":395,"answer":30,"analysis":32},1110008,"办公及生活用家具购置费属于（ ）。",[396,397,399,400],{"key":19,"text":205,"correct":21},{"key":23,"text":398,"correct":21},"有项目建设有关的其他费用",{"key":27,"text":209,"correct":21},{"key":30,"text":231,"correct":25},{"id":402,"libraryId":5,"type":14,"typeLabel":15,"stem":403,"options":404,"answer":27,"analysis":32},1110009,"工程建设其他费用中的研究试验费包括（ ）。",[405,406,408,409],{"key":19,"text":169,"correct":21},{"key":23,"text":407,"correct":21},"自设实验室进行试验所使用的材料和化学药品等费用",{"key":27,"text":173,"correct":25},{"key":30,"text":410,"correct":21},"新产品试制费",{"id":412,"libraryId":5,"type":14,"typeLabel":15,"stem":413,"options":414,"answer":27,"analysis":32},1110010,"工程建设中，建设单位所需的宿舍、办公室等临时设施的费用应计入（ ）。",[415,416,417,419],{"key":19,"text":110,"correct":21},{"key":23,"text":112,"correct":21},{"key":27,"text":418,"correct":25},"工程建设其他费用中建设单位临时设施费",{"key":30,"text":420,"correct":21},"建安工程费用中的其他直接费用",{"id":422,"libraryId":5,"type":14,"typeLabel":15,"stem":423,"options":424,"answer":27,"analysis":32},1110011,"关于进口设备交货类别中，买卖双方应承担的风险表述正确的是（ ）。",[425,427,429,431],{"key":19,"text":426,"correct":21},"内陆交货类对买方风险小而对卖方风险大",{"key":23,"text":428,"correct":21},"目的地交货类对买卖双方的风险做了合理均摊",{"key":27,"text":430,"correct":25},"装运港船上交货是由买方承担海运风险",{"key":30,"text":432,"correct":21},"采用装运港船上交货类时，由卖方负担货物装船后的一切风险",{"id":434,"libraryId":5,"type":14,"typeLabel":15,"stem":435,"options":436,"answer":19,"analysis":32},1110012,"国产非标准设备原价的确定可采用（ ）等方法。",[437,439,441,443],{"key":19,"text":438,"correct":25},"成本计算估价法和系列设备插入估价法",{"key":23,"text":440,"correct":21},"成本计算估价法和概算指标法",{"key":27,"text":442,"correct":21},"分部组合估价法和百分比法",{"key":30,"text":444,"correct":21},"概算指标法和定额估价法",{"id":446,"libraryId":5,"type":14,"typeLabel":15,"stem":447,"options":448,"answer":30,"analysis":32},1110013,"国际工程项目建筑安装工程费用构成中，分包费的数额等于（ ）。",[449,451,453,455],{"key":19,"text":450,"correct":21},"分包商的报价",{"key":23,"text":452,"correct":21},"承包商对分包商的管理费",{"key":27,"text":454,"correct":21},"业主对分包商的管理费",{"key":30,"text":456,"correct":25},"分包商报价及相应总包管理费",{"id":458,"libraryId":5,"type":14,"typeLabel":15,"stem":459,"options":460,"answer":19,"analysis":32},1110014,"国际工程项目建筑安装工程费用构成中，暂列金额属于（ ）。",[461,463,465,467],{"key":19,"text":462,"correct":25},"业主方的备用金",{"key":23,"text":464,"correct":21},"承包商的风险准备金",{"key":27,"text":466,"correct":21},"建筑安装工程的暂定单价",{"key":30,"text":468,"correct":21},"工程师风险控制基金",{"id":470,"libraryId":5,"type":14,"typeLabel":15,"stem":471,"options":472,"answer":30,"analysis":32},1110015,"建设项目在建设期内，由于价格变化引起投资增加，需要事先预留的费用属于（ ）。",[473,475,476,478],{"key":19,"text":474,"correct":21},"未明确项目准备金",{"key":23,"text":102,"correct":21},{"key":27,"text":477,"correct":21},"建筑安装工程间接费",{"key":30,"text":261,"correct":25},{"id":480,"libraryId":5,"type":14,"typeLabel":15,"stem":481,"options":482,"answer":27,"analysis":32},1110016,"联合试运转费包括下列（ ）。",[483,485,487,489],{"key":19,"text":484,"correct":21},"单台设备调试费",{"key":23,"text":486,"correct":21},"试运转产品的销售收入",{"key":27,"text":488,"correct":25},"试运转所需的机械使用费",{"key":30,"text":490,"correct":21},"无负荷联动试运转费用",{"id":492,"libraryId":5,"type":14,"typeLabel":15,"stem":493,"options":494,"answer":27,"analysis":32},1110017,"某工业项目进口一批生产设备，装运港船上交货价（FO B）为150万美元，进口设备到岸价（CI F）为200万美元，银行财务费费率为5‰，外贸手续费费率为1.5%，进口关税税率为20%，增值税税率为17%，该批设备无消费税。银行外汇牌价为1美元=6.8元人民币，则这批设备应纳的增值税为（ ）万元人民币。",[495,497,499,501],{"key":19,"text":496,"correct":21},"208.08",{"key":23,"text":498,"correct":21},"240.56",{"key":27,"text":500,"correct":25},"277.44",{"key":30,"text":502,"correct":21},"282.08",{"id":504,"libraryId":5,"type":14,"typeLabel":15,"stem":505,"options":506,"answer":23,"analysis":32},1110018,"某进口设备，其银行财务费为4万元人民币，外贸手续费为19万元人民币，关税税率为20%，进口环节增值税率为17%，抵岸价为1790万元人民币。该批设备无消费税，则该批进口设备的到岸价格（CI F）为（ ）万元人民币。",[507,509,511,513],{"key":19,"text":508,"correct":21},"745.57",{"key":23,"text":510,"correct":25},"1258.55",{"key":27,"text":512,"correct":21},"1274.93",{"key":30,"text":514,"correct":21},"4837.84",{"id":516,"libraryId":5,"type":14,"typeLabel":15,"stem":517,"options":518,"answer":30,"analysis":32},1110019,"某进口设备，装运港船上交货价为400万美元，国际运费为30万美元，海上运输保险费率为3‰，银行外汇牌价为1美元=6.8元人民币，则该进口设备的海运保险费为（ ）万元人民币。",[519,521,523,525],{"key":19,"text":520,"correct":21},"7.55",{"key":23,"text":522,"correct":21},"8.16",{"key":27,"text":524,"correct":21},"8.77",{"key":30,"text":526,"correct":25},"8.80",{"id":528,"libraryId":5,"type":14,"typeLabel":15,"stem":529,"options":530,"answer":27,"analysis":32},1110020,"某进口设备按人民币计算，离岸价830万元，到岸价920万元，银行财务费4.15万元，外贸手续费13.8万元，增值税198.72万元，进口设备检验鉴定费3万元，进口关税率20%，则该进口设备的抵岸价为（ ）万元。",[531,533,535,537],{"key":19,"text":532,"correct":21},"1212.67",{"key":23,"text":534,"correct":21},"1215.67",{"key":27,"text":536,"correct":25},"1320.67",{"key":30,"text":538,"correct":21},"1323.67",{"id":540,"libraryId":5,"type":14,"typeLabel":15,"stem":541,"options":542,"answer":27,"analysis":32},1110021,"某进口设备装运港船上交货价为200万美元，国外运费为10万美元，国外运输保险费为6.5万美元，外贸手续费率为1.5%。美元兑人民币的汇率为6.85，则该进口设备的到岸价为（ ）万元人民币。",[543,545,547,549],{"key":19,"text":544,"correct":21},"1435.00",{"key":23,"text":546,"correct":21},"1460.08",{"key":27,"text":548,"correct":25},"1483.03",{"key":30,"text":550,"correct":21},"1505.27",{"id":552,"libraryId":5,"type":14,"typeLabel":15,"stem":553,"options":554,"answer":27,"analysis":32},1110022,"某世界银行项目各项数据如下：项目管理费600万元，开工试车费400万元，业主的行政性费用200万元，生产前费用700万元，运费和保险费为250万元，地方税200万元，建设成本上升费用220万元，则该项目间接建设成本为（ ）万元。",[555,557,559,561],{"key":19,"text":556,"correct":21},"1200",{"key":23,"text":558,"correct":21},"2000",{"key":27,"text":560,"correct":25},"2350",{"key":30,"text":562,"correct":21},"2570",{"id":564,"libraryId":5,"type":14,"typeLabel":15,"stem":565,"options":566,"answer":23,"analysis":32},1110023,"某投资项目建设期为3年，在建设期第1年贷款100万元，第2年贷款300万元，第3年贷款100万元，贷款年利率为6%。用复利法计算，该项目的建设期贷款利息应为（ ）万元。",[567,568,569,571],{"key":19,"text":296,"correct":21},{"key":23,"text":298,"correct":25},{"key":27,"text":570,"correct":21},"30.00",{"key":30,"text":572,"correct":21},"15.00",{"id":574,"libraryId":5,"type":14,"typeLabel":15,"stem":575,"options":576,"answer":30,"analysis":32},1110024,"某项目的分部分项工程费为98000万元，措施费为2950万元，规费为9600万元，其他项目费为13750万元。综合税率为3.48%，则该项目应缴纳的税金为（ ）万元。",[577,579,581,583],{"key":19,"text":578,"correct":21},"4025.64",{"key":23,"text":580,"correct":21},"4125.64",{"key":27,"text":582,"correct":21},"4225.64",{"key":30,"text":584,"correct":25},"4325.64",{"id":586,"libraryId":5,"type":14,"typeLabel":15,"stem":587,"options":588,"answer":23,"analysis":32},1110025,"某项目建设期为2年，在建设期第1年贷款2000万元，第2年贷款3000万元，贷款年利率为8%，则该项目的建设期贷款利息估算为（ ）万元。",[589,590,591,592],{"key":19,"text":284,"correct":21},{"key":23,"text":286,"correct":25},{"key":27,"text":288,"correct":21},{"key":30,"text":290,"correct":21},[594,597,600,603,606,609],{"id":14,"name":595,"category":7,"favorite":596},"领导干部任职前廉政法规知识测试题",92,{"id":598,"name":599,"category":7,"favorite":14},595,"建筑结构与设备",{"id":601,"name":602,"category":7,"favorite":14},715,"招标采购专业知识与法律法规",{"id":604,"name":605,"category":7,"favorite":14},848,"市政方向-通用基础",{"id":607,"name":608,"category":7,"favorite":8},534,"BIM工程师",{"id":610,"name":608,"category":7,"favorite":8},535]