[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":566},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,5,50,2641,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,212,220,230,242,252,260,268,280,292,304,316,325,337,346,358,370,382,391,401,413,425,437,447,456,465,474,486,496,505,517,527,535,546,554],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1107391,1,"单选题","在现场安全管理工作中，监理单位应当结合危大工程专项施工方案编制（ ），并对危大工程施工实施专项巡视检查。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","监理规划",false,{"key":24,"text":25,"correct":26},"B","监理实施细则",true,{"key":28,"text":29,"correct":22},"C","监理大纲",{"key":31,"text":32,"correct":22},"D","监理专项施工方案","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1107392,"对于按照规定需要验收的危大工程，施工单位、监理单位应当组织相关人员进行验收。验收合格的，经（ ）及总监理工程师签字确认后，方可进入下一道工序。",[38,40,42,44],{"key":20,"text":39,"correct":26},"施工单位项目技术负责人",{"key":24,"text":41,"correct":22},"建设单位项目负责人",{"key":28,"text":43,"correct":22},"施工单位项目经理",{"key":31,"text":45,"correct":22},"专业监理工程师",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1107393,"对于超过一定规模的危大工程，施工单位应当组织召开专家论证，专家应当从地方人民政府住房城乡建设主管部门建立的专家库中选取，符合专业要求且人数不得少于（ ）名。",[50,52,54,56],{"key":20,"text":51,"correct":22},"3",{"key":24,"text":53,"correct":26},"5",{"key":28,"text":55,"correct":22},"7",{"key":31,"text":57,"correct":22},"10",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1107394,"对于超过一定规模的危大工程，施工单位应当组织召开专家论证会对专项施工方案进行论证。专家论证前专项施工方案应当通过施工单位审核和（ ）审查。",[62,64,66,68],{"key":20,"text":63,"correct":22},"建设单位负责人",{"key":24,"text":65,"correct":22},"设计单位负责人",{"key":28,"text":67,"correct":26},"总监理工程师",{"key":31,"text":69,"correct":22},"质量监督机构",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1107395,"施工承包单位要求变更或修改设计图纸的某些内容时，按现行规范的规定，应向项目监理机构提交（ ）请求批准。",[74,76,78,80],{"key":20,"text":75,"correct":22},"设计变更单",{"key":24,"text":77,"correct":22},"技术修改单",{"key":28,"text":79,"correct":26},"工程变更单",{"key":31,"text":81,"correct":22},"技术核定单",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1107396,"下列有关工程变更控制的表述，错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"总监理工程师组织专业监理工程师审查施工单位提出的工程变更申请",{"key":24,"text":89,"correct":22},"对涉及工程设计文件修改的工程变更，应由建设单位转交原设计单位修改工程设计文件",{"key":28,"text":91,"correct":26},"必要时，项目监理机构应建议施工单位组织设计.建设等单位召开专题会议",{"key":31,"text":93,"correct":22},"总监理工程师组织专业监理工程师对工程变更费用及工期影响作出评估",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1107397,"下列关于通风与空调工程的说法，错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"防火风管和排烟风管使用的材料应为可燃材料",{"key":24,"text":101,"correct":22},"风机盘管和管道的绝热材料进场时，应取样复试合格",{"key":28,"text":103,"correct":22},"空调水管道系统应进行强度和严密性试验",{"key":31,"text":105,"correct":22},"风管穿过墙体或楼板时，应按要求设置套管并封堵密实",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1107398,"对产源固定、产量质量稳定的供砂单位，在正常情况下生产供应的天然砂，每批总量不得超过（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"200m3",{"key":24,"text":113,"correct":26},"400m3",{"key":28,"text":115,"correct":22},"300t",{"key":31,"text":117,"correct":22},"500t",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1107399,"进厂（场）的粉煤灰必须附有供灰单位的（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"出厂合格证",{"key":24,"text":125,"correct":22},"质量证明书",{"key":28,"text":127,"correct":22},"生产许可证",{"key":31,"text":129,"correct":22},"使用说明书",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1107400,"在建设工程活动中，总监理工程师签发（ ），应事先征得建设单位同意。",[134,136,138,140],{"key":20,"text":135,"correct":26},"工程暂停令",{"key":24,"text":137,"correct":22},"监理通知单",{"key":28,"text":139,"correct":22},"工作联系单",{"key":31,"text":141,"correct":22},"监理报告",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1107401,"在公路工程的检验试验中，对各种材料的物理性能测定和检验属于（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"抽样试验",{"key":24,"text":149,"correct":22},"标准试验",{"key":28,"text":151,"correct":22},"工艺试验",{"key":31,"text":153,"correct":22},"验证试验",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1107402,"监理机构对施工单位进行的涉及结构安全的试块、试件及工程材料现场取样、封样、送检工作的监督活动是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"抽样检验",{"key":24,"text":161,"correct":26},"见证取样",{"key":28,"text":163,"correct":22},"实验检测",{"key":31,"text":165,"correct":22},"平行检验",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1107403,"下列有关见证取样程序的表述，正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"施工单位要将选定的试验室报送负责本项目的质量监督机构备案并得到认可",{"key":24,"text":173,"correct":22},"对于施工单位提出的试验室，总监理工程师要进行实地考察",{"key":28,"text":175,"correct":26},"项目监理机构中负责见证取样的监理人员应在质量监督机构备案",{"key":31,"text":177,"correct":22},"监理机构应按照规定制定检测试验计划，配备取样人员，负责施工现场的取样工作",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1107404,"（ ）应当依法提供真实、准确、完整的工程地质、水文地质和工程周边环境等资料。应当组织勘察、设计等单位在施工招标文件中列出危大工程清单。",[182,184,186,188],{"key":20,"text":183,"correct":22},"监理单位",{"key":24,"text":185,"correct":26},"建设单位",{"key":28,"text":187,"correct":22},"施工单位",{"key":31,"text":189,"correct":22},"咨询单位",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1107405,"在施工方案的审查中，对施工单位的内部审批程序是否完善、签章是否齐全的审查，属于（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"程序性审查",{"key":24,"text":197,"correct":22},"内容性审查",{"key":28,"text":199,"correct":22},"内部性审查",{"key":31,"text":201,"correct":22},"外部性审查",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1107406,"施工单位在自检的基础上，将分部工程报验表报送项目监理机构，由（ ）组织相关人员对分部工程进行验收，并签署验收意见。",[206,207,208,210],{"key":20,"text":67,"correct":26},{"key":24,"text":45,"correct":22},{"key":28,"text":209,"correct":22},"监理单位技术负责人",{"key":31,"text":211,"correct":22},"施工单位技术负责人",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":28,"analysis":33},1107407,"在工程施工质量控制中，满足施工条件后，（ ）应负责签发工程开工令。",[216,217,218,219],{"key":20,"text":211,"correct":22},{"key":24,"text":45,"correct":22},{"key":28,"text":67,"correct":26},{"key":31,"text":63,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":28,"analysis":33},1107408,"在建设工程活动过程中，（ ）对工程建设施工、监理、验收等执行强制性标准的情况实施监督。",[224,225,226,228],{"key":20,"text":185,"correct":22},{"key":24,"text":183,"correct":22},{"key":28,"text":227,"correct":26},"工程质量监督机构",{"key":31,"text":229,"correct":22},"勘察设计单位",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":24,"analysis":33},1107410,"根据《建设工程监理规范》，下列施工单位报审表中，需要总监理工程师签字并加盖执业印章的是（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":22},"监理通知回复单",{"key":24,"text":237,"correct":26},"施工组织设计报审表",{"key":28,"text":239,"correct":22},"分部工程报验表",{"key":31,"text":241,"correct":22},"工程复工报审表",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":28,"analysis":33},1107411,"工程开工前，施工图纸会审会议应由（ ）主持召开。",[246,248,249,250],{"key":20,"text":247,"correct":22},"项目监理机构",{"key":24,"text":187,"correct":22},{"key":28,"text":185,"correct":26},{"key":31,"text":251,"correct":22},"设计单位",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},1107412,"工程设计技术交底是工程质量控制的重要环节，技术交底会议纪要由（ ）整理，与会各方会签。",[256,257,258,259],{"key":20,"text":185,"correct":22},{"key":24,"text":251,"correct":26},{"key":28,"text":247,"correct":22},{"key":31,"text":187,"correct":22},{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1107413,"在工程施工准备阶段，设计交底纪要由（ ）负责整理，与会各方会签。",[264,265,266,267],{"key":20,"text":251,"correct":26},{"key":24,"text":183,"correct":22},{"key":28,"text":187,"correct":22},{"key":31,"text":185,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},1107414,"在工程施工准备阶段，总监理工程师组织监理人员熟悉工程设计文件的目标不包括（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"发现图纸差错",{"key":24,"text":275,"correct":22},"了解设计意图",{"key":28,"text":277,"correct":22},"了解工程关键部位的质量要求",{"key":31,"text":279,"correct":26},"熟悉工程的施工流程",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":28,"analysis":33},1107415,"提升高度在（ ）m及以上的附着式升降脚手架工程属于超过一定规模的危险性较大的分部分项工程。",[284,286,288,290],{"key":20,"text":285,"correct":22},"50",{"key":24,"text":287,"correct":22},"100",{"key":28,"text":289,"correct":26},"150",{"key":31,"text":291,"correct":22},"200",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},1107416,"根据《建设工程监理规范》，项目监理机构审核施工分包单位资格时，应审核施工分包单位的（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":26},"类似工程业绩",{"key":24,"text":299,"correct":22},"质量管理体系文件",{"key":28,"text":301,"correct":22},"经营收入情况",{"key":31,"text":303,"correct":22},"人员持证上岗情况",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},1107417,"在施工单位提交的下列报审表、报验表中，专业监理工程师签署意见后，总监理工程师还应签署审核意见的是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":26},"分包单位资格报审表",{"key":24,"text":311,"correct":22},"施工控制测量成果报验表",{"key":28,"text":313,"correct":22},"分项工程质量报验表",{"key":31,"text":315,"correct":22},"工程材料.构配件.设备报审表",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},1107418,"下列应由施工项目经理部盖章，项目技术负责人签字的报审（报验）表的是（ ）。",[320,321,322,323],{"key":20,"text":309,"correct":22},{"key":24,"text":311,"correct":26},{"key":28,"text":315,"correct":22},{"key":31,"text":324,"correct":22},"试验室报审表",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},1107419,"由建设单位采购的主要设备由建设单位、施工单位、项目监理机构进行开箱检查，并由三方在（ ）上签字。",[329,331,333,335],{"key":20,"text":330,"correct":26},"开箱检查记录",{"key":24,"text":332,"correct":22},"收货单",{"key":28,"text":334,"correct":22},"验收报告",{"key":31,"text":336,"correct":22},"出厂证书",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},1107420,"在现场施工准备的质量控制中，（ ）应按照相应测量标准的要求对施工平面控制网、高程控制网和临时水准点的测量成果及控制桩的保护措施进行检查、复核。",[341,342,343,344],{"key":20,"text":45,"correct":26},{"key":24,"text":67,"correct":22},{"key":28,"text":209,"correct":22},{"key":31,"text":345,"correct":22},"监理员",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1107421,"旁站监理人员实施旁站监理时，发现施工企业有违反工程建设强制性标准行为的，( )。",[350,352,354,356],{"key":20,"text":351,"correct":22},"立即通知专业监理工程师",{"key":24,"text":353,"correct":26},"立即通知建设单位",{"key":28,"text":355,"correct":22},"有权责令施工企业立即整改",{"key":31,"text":357,"correct":22},"由总监理工程师责令施工企业立即整改",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1107422,"下列属于安全防护的监理现场控制内容的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"模板支撑体系的搭设应符合规范要求",{"key":24,"text":365,"correct":26},"大模板作业防护应符合规范要求",{"key":28,"text":367,"correct":22},"施工现场临时用电管理应符合相关要求",{"key":31,"text":369,"correct":22},"移动式操作平台的设置应符合规范要求",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1107423,"在质量记录资料的管理中，下列不属于工程材料质量记录的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"现场材料.设备存放与管理",{"key":24,"text":377,"correct":22},"化学成分试验报告",{"key":28,"text":379,"correct":22},"设备进场维修记录",{"key":31,"text":381,"correct":22},"混凝土合格证",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1107424,"随着工程施工的进展，（ ）应不断补充和填写关于材料、构配件及施工作业活动的有关内容，记录新的情况。",[386,387,388,389],{"key":20,"text":187,"correct":26},{"key":24,"text":185,"correct":22},{"key":28,"text":183,"correct":22},{"key":31,"text":390,"correct":22},"建设行政主管部门",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},1107425,"下列报审、报验表中，需要建设单位签署审批意见的是（ ）。",[395,396,398,400],{"key":20,"text":309,"correct":22},{"key":24,"text":397,"correct":22},"施工进度计划报审表",{"key":28,"text":399,"correct":22},"分项工程报验表",{"key":31,"text":241,"correct":26},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1107426,"装配式建筑PC构件生产工艺流程审核中，关于墙板的生产工艺流程，下列正确的是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":26},"模具清理→模具安装→涂隔离剂→下层钢筋布置→反面预埋安装→振动浇捣→布置挤塑板→玄武岩筋布置→上层钢筋布置→正面预埋安装",{"key":24,"text":408,"correct":22},"模具清理→模具安装→涂隔离剂→上层钢筋布置→反面预埋安装→振动浇捣→布置挤塑板→玄武岩筋布置→下层钢筋布置→正面预埋安装",{"key":28,"text":410,"correct":22},"模具清理→涂隔离剂→模具安装→下层钢筋布置→反面预埋安装→振动浇捣→布置挤塑板→玄武岩筋布置→上层钢筋布置→正面预埋安装",{"key":31,"text":412,"correct":22},"模具清理→模具安装→涂隔离剂→下层钢筋布置→正面预埋安装→振动浇捣→布置挤塑板→玄武岩筋布置→上层钢筋布置→反面预埋安装",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1107427,"下列关于箍筋的说法，正确的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":26},"箍筋的末端应按设计要求做弯钩",{"key":24,"text":420,"correct":22},"对一般结构构件，箍筋弯钩的弯折角度不应小于135°",{"key":28,"text":422,"correct":22},"对有抗震设防专门要求的结构构件，箍筋弯钩的弯折角度不应小于180°",{"key":31,"text":424,"correct":22},"圆形箍筋两末端均应做不小于90°的弯钩",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1107428,"桩基础承载力检验中，混凝土灌注桩采用（ ）d试块强度或钻芯法进行强度检验。",[429,431,433,435],{"key":20,"text":430,"correct":22},"14",{"key":24,"text":432,"correct":26},"28",{"key":28,"text":434,"correct":22},"30",{"key":31,"text":436,"correct":22},"42",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},1107429,"对平行检验不合格的施工质量，项目监理机构应签发（ ），要求施工单位在指定的时间内整改并重新报验。",[441,442,443,445],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":26},{"key":28,"text":444,"correct":22},"监理工程师函",{"key":31,"text":446,"correct":22},"整改通知单",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":28,"analysis":33},1107430,"工程项目施工前，由（ ）和项目监理机构共同对见证取样的检测机构进行考察确定。",[451,452,453,454],{"key":20,"text":185,"correct":22},{"key":24,"text":251,"correct":22},{"key":28,"text":187,"correct":26},{"key":31,"text":455,"correct":22},"分包单位",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},1107431,"用于工程的进口设备进场后，应由（ ）组织相关单位进行联合检查验收。",[460,461,462,463],{"key":20,"text":185,"correct":22},{"key":24,"text":247,"correct":26},{"key":28,"text":187,"correct":22},{"key":31,"text":464,"correct":22},"设备供应单位",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},1107432,"项目监理机构收到施工单位报送的试验室报审表后，（ ）在熟悉本工程的试验项目及其要求后对施工试验室进行审查。",[469,471,472,473],{"key":20,"text":470,"correct":22},"监理单位项目负责人",{"key":24,"text":67,"correct":22},{"key":28,"text":45,"correct":26},{"key":31,"text":209,"correct":22},{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":28,"analysis":33},1107433,"在施工准备阶段，专业监理工程师应检查施工试验室的内容不包括（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"试验室资质等级及试验范围",{"key":24,"text":481,"correct":22},"试验室管理制度",{"key":28,"text":483,"correct":26},"试验设备的合格证书",{"key":31,"text":485,"correct":22},"试验人员资格证书",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},1107434,"项目监理机构收到施工单位报送的工程材料、构配件、设备报审表后，应审查施工单位报送的用于工程的材料、构配件、设备的质量证明文件，并应按有关规定、建设工程监理合同约定，对用于工程的材料进行（ ）。",[490,491,493,494],{"key":20,"text":161,"correct":26},{"key":24,"text":492,"correct":22},"专项检验",{"key":28,"text":165,"correct":22},{"key":31,"text":495,"correct":22},"抽样检查",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":24,"analysis":33},1107435,"施工单位编写的施工方案，（ ）应组织审查，符合要求后予以签认。",[500,501,502,503],{"key":20,"text":39,"correct":22},{"key":24,"text":67,"correct":26},{"key":28,"text":45,"correct":22},{"key":31,"text":504,"correct":22},"建设单位代表",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},1107436,"下列有关施工组织设计审查的程序要求，表述错误的是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":26},"施工组织设计应当由施工单位项目技术负责人审核签认后，报监理机构",{"key":24,"text":512,"correct":22},"施工组织设计报审表应当由施工项目经理部盖章，项目经理签字",{"key":28,"text":514,"correct":22},"施工组织设计需要修改的，总监理工程师签发书面意见退回修改",{"key":31,"text":516,"correct":22},"施工组织设计在实施过程中，施工单位如需做较大的变更，项目监理机构应按程序重新审查",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1107437,"需要施工单位修改施工组织设计时，由（ ）在报审表上签署意见，发回施工单位修改。",[521,522,523,525],{"key":20,"text":45,"correct":22},{"key":24,"text":67,"correct":26},{"key":28,"text":524,"correct":22},"建设单位技术负责人",{"key":31,"text":526,"correct":22},"建设单位质量负责人",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1107438,"在收到施工图审查机构审查合格的施工图设计文件后，（ ）应及时主持召开图纸会审会议，组织相关人员进行图纸会审。",[531,532,533,534],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":26},{"key":28,"text":187,"correct":22},{"key":31,"text":251,"correct":22},{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":31,"analysis":33},1107439,"在施工质量验收过程中，涉及结构安全的试块、试件以及有关材料，应按规定进行（ ）检测。",[539,541,543,545],{"key":20,"text":540,"correct":22},"平行",{"key":24,"text":542,"correct":22},"巡视",{"key":28,"text":544,"correct":22},"抽样",{"key":31,"text":161,"correct":26},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},1107440,"在施工过程中，（ ）应督促施工单位加强内部质量管理，严格质量控制。",[550,551,552,553],{"key":20,"text":69,"correct":22},{"key":24,"text":185,"correct":22},{"key":28,"text":67,"correct":22},{"key":31,"text":45,"correct":26},{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},1107441,"工程建设的质量标准是针对不同行业、不同的质量控制对象而制定的，在国内工程中，（ ）是必须执行与遵守的最低要求。",[558,560,562,564],{"key":20,"text":559,"correct":26},"国家标准",{"key":24,"text":561,"correct":22},"行业标准",{"key":28,"text":563,"correct":22},"地方标准",{"key":31,"text":565,"correct":22},"企业标准",[567,570,573,576,579,582],{"id":15,"name":568,"category":7,"favorite":569},"领导干部任职前廉政法规知识测试题",92,{"id":571,"name":572,"category":7,"favorite":15},595,"建筑结构与设备",{"id":574,"name":575,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":577,"name":578,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":580,"name":581,"category":7,"favorite":8},534,"BIM工程师",{"id":583,"name":581,"category":7,"favorite":8},535]