[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-48":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":577},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,48,50,2641,[13,34,46,55,66,78,90,102,111,123,135,145,157,169,181,193,205,217,229,241,253,265,277,289,301,309,317,329,341,352,362,374,385,397,409,421,429,441,449,461,473,482,494,506,514,524,533,545,557,567],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1109854,1,"单选题","在投资控制的各项措施中，明确管理职能分工属于（）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","组织措施",true,{"key":24,"text":25,"correct":26},"B","技术措施",false,{"key":28,"text":29,"correct":26},"C","经济措施",{"key":31,"text":32,"correct":26},"D","管理措施","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1109856,"下列属于项目监理机构在施工阶段投资控制技术措施的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"编制资金使用计划",{"key":24,"text":41,"correct":26},"做施工记录",{"key":28,"text":43,"correct":22},"控制设计变更",{"key":31,"text":45,"correct":26},"编制工作流程图",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1109859,"下列选项中，属于项目监理机构在施工阶段投资控制经济措施的是（）。",[50,52,53,54],{"key":20,"text":51,"correct":22},"进行工程计量",{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":26},{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":24,"analysis":33},1109860,"下列施工阶段投资控制措施中，属于组织措施的是()。",[59,60,62,64],{"key":20,"text":39,"correct":26},{"key":24,"text":61,"correct":22},"编制详细的工作流程图",{"key":28,"text":63,"correct":26},"对设计变更进行技术经济分析",{"key":31,"text":65,"correct":26},"对投资支出作出分析与预测",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":24,"analysis":33},1109861,"投资控制的第一步是（ ）。",[70,72,74,76],{"key":20,"text":71,"correct":26},"收集投资实际支出数据",{"key":24,"text":73,"correct":22},"确定工程项目计划投资目标",{"key":28,"text":75,"correct":26},"纠偏",{"key":31,"text":77,"correct":26},"投资实际值与计划值比较",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":28,"analysis":33},1109862,"建设单位与施工单位未能就工程变更费用达成协议时，( )可提出一个暂定价格并经建设单位同意，作为临时支付工程款的依据。",[82,84,86,88],{"key":20,"text":83,"correct":26},"建设单位",{"key":24,"text":85,"correct":26},"施工单位",{"key":28,"text":87,"correct":22},"项目监理机构",{"key":31,"text":89,"correct":26},"工程造价管理机构",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":28,"analysis":33},1109863,"下列选项中，属于项目监理机构在施工阶段投资控制主要工作的是（）。",[94,96,98,100],{"key":20,"text":95,"correct":26},"签订保修合同",{"key":24,"text":97,"correct":26},"审查设计概算",{"key":28,"text":99,"correct":22},"审核竣工结算款",{"key":31,"text":101,"correct":26},"分析发生索赔的原因",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":28,"analysis":33},1109866,"在建设单位和承包单位未能就工程变更的费用达成协议时，()应提出一个暂定的价格，作为临时支付工程款的依据。",[106,107,109,110],{"key":20,"text":83,"correct":26},{"key":24,"text":108,"correct":26},"承包单位",{"key":28,"text":87,"correct":22},{"key":31,"text":89,"correct":26},{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":20,"analysis":33},1109867,"初步设计阶段投资控制的目标应不超过（ ）。",[115,117,119,121],{"key":20,"text":116,"correct":22},"投资估算",{"key":24,"text":118,"correct":26},"设计总概算",{"key":28,"text":120,"correct":26},"修正总概算",{"key":31,"text":122,"correct":26},"施工图预算",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":20,"analysis":33},1109868,"计算建设工程投资时，按（ ）顺序计算，并逐级汇总。",[127,129,131,133],{"key":20,"text":128,"correct":22},"分项、分部、单位、单项工程",{"key":24,"text":130,"correct":26},"土建、安装设备工程流动资金",{"key":28,"text":132,"correct":26},"分部、分项、单项、单位工程",{"key":31,"text":134,"correct":26},"设备、土建、安装工程",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":20,"analysis":33},1109869,"建设工程施工图设计阶段，进行技术设计和施工图设计的投资控制目标是（ ）。",[139,141,142,144],{"key":20,"text":140,"correct":22},"设计概算",{"key":24,"text":122,"correct":26},{"key":28,"text":143,"correct":26},"修正概算",{"key":31,"text":116,"correct":26},{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":28,"analysis":33},1109870,"建设工程投资控制的目的是（ ）。",[149,151,153,155],{"key":20,"text":150,"correct":26},"投资越少越好",{"key":24,"text":152,"correct":26},"中标价低于标底价",{"key":28,"text":154,"correct":22},"实现项目投资管理目标",{"key":31,"text":156,"correct":26},"控制动态投资",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":20,"analysis":33},1109871,"建设工程总投资，一般是指在建设期内预计或实际投入的（ ）。",[161,163,165,167],{"key":20,"text":162,"correct":22},"全部费用",{"key":24,"text":164,"correct":26},"建筑安装工程费",{"key":28,"text":166,"correct":26},"建筑工程费",{"key":31,"text":168,"correct":26},"建筑工程费和安装工程费",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":31,"analysis":33},1109872,"建设工程总投资中，生产性建设工程总投资包括（ ）。",[173,175,177,179],{"key":20,"text":174,"correct":26},"建设投资和静态投资",{"key":24,"text":176,"correct":26},"建设投资和建筑安装工程投资",{"key":28,"text":178,"correct":26},"建设投资和施工流动资金",{"key":31,"text":180,"correct":22},"建设投资、建设期利息和流动资金",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":31,"analysis":33},1109873,"建设项目静态投资考虑的因素是（ ）。",[185,187,189,191],{"key":20,"text":186,"correct":26},"价格上涨风险引起的投资增加",{"key":24,"text":188,"correct":26},"因时间迁移而产生的单利利息支出",{"key":28,"text":190,"correct":26},"因时间迁移而产生的复利利息支出",{"key":31,"text":192,"correct":22},"因工程量误差而可能引起的投资增加",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":24,"analysis":33},1109874,"静态投资包括建筑安装工程费，设备及工、器具购置费，工程建设其他费用和（ ）。",[197,199,201,203],{"key":20,"text":198,"correct":26},"预备费",{"key":24,"text":200,"correct":22},"基本预备费",{"key":28,"text":202,"correct":26},"涨价预备费",{"key":31,"text":204,"correct":26},"建设期利息",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},1109875,"某建设工程设备购置费为500万元，基本预备费90万元，涨价预备费20万元，建筑安装工程投资1200万元，建设期利息55万元，土地使用费800万元，铺底流动资金为100万元，则上述投资中属于动态投资的为（ ）万元。",[209,211,213,215],{"key":20,"text":210,"correct":22},"75",{"key":24,"text":212,"correct":26},"145",{"key":28,"text":214,"correct":26},"165",{"key":31,"text":216,"correct":26},"175",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":20,"analysis":33},1109876,"某建设项目，建安工程费为40000万元，设备及工、器具购置费为5000万元，建设期利息为1400万元，工程建设其他费用为4000万元，建设期预备费为9500万元（其中基本预备费为4900万元），项目的铺底流动资金为600万元，则该项目的动态投资额为（ ）万元。",[221,223,225,227],{"key":20,"text":222,"correct":22},"6000",{"key":24,"text":224,"correct":26},"6600",{"key":28,"text":226,"correct":26},"11500",{"key":31,"text":228,"correct":26},"59900",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":20,"analysis":33},1109877,"某项目，建筑安装工程费1000万元，设备及工、器具购置费700万元，工程建设其他费500万元，涨价预备费250万元，基本预备费100万元，建设期利息80万元，则该项目的静态投资为（ ）万元。",[233,235,237,239],{"key":20,"text":234,"correct":22},"2300",{"key":24,"text":236,"correct":26},"2450",{"key":28,"text":238,"correct":26},"2550",{"key":31,"text":240,"correct":26},"2630",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":24,"analysis":33},1109878,"某项目投资中，建筑安装工程费用为560万元，设备及工、器具购置费为330万元，工程建设其他费用为110万元，基本预备费为100万元，涨价预备费为55万元，建设期贷款利息为59万元，则静态投资为（ ）万元。",[245,247,249,251],{"key":20,"text":246,"correct":26},"1000",{"key":24,"text":248,"correct":22},"1100",{"key":28,"text":250,"correct":26},"1155",{"key":31,"text":252,"correct":26},"1214",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":31,"analysis":33},1109879,"实现建设项目投资控制最有效的手段是（ ）。",[257,259,261,263],{"key":20,"text":258,"correct":26},"实行经济承包责任制",{"key":24,"text":260,"correct":26},"进行招标和投标",{"key":28,"text":262,"correct":26},"经济核算",{"key":31,"text":264,"correct":22},"技术与经济相结合",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":31,"analysis":33},1109880,"为了有效地进行投资控制，可采取的组织措施是（ ）。",[269,271,273,275],{"key":20,"text":270,"correct":26},"重视工程设计多方案比选",{"key":24,"text":272,"correct":26},"严格审查施工组织设计",{"key":28,"text":274,"correct":26},"严格审核各项费用支出",{"key":31,"text":276,"correct":22},"明确项目投资控制者及其任务",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":28,"analysis":33},1109881,"下列费用中不属于静态投资的是（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":26},"设备及工、器具购置费",{"key":24,"text":284,"correct":26},"建设单位管理费",{"key":28,"text":286,"correct":22},"建设期贷款利息",{"key":31,"text":288,"correct":26},"研究试验费",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":28,"analysis":33},1109882,"下列选项不属于建设工程投资特点的有（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":26},"建设工程投资数额巨大",{"key":24,"text":296,"correct":26},"建设工程投资需单独计算",{"key":28,"text":298,"correct":22},"建设工程投资核算复杂",{"key":31,"text":300,"correct":26},"建设工程投资确定层次繁多",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":28,"analysis":33},1109883,"下列属于项目监理机构在施工阶段投资控制技术措施的是（ ）。",[305,306,307,308],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":26},{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},1109884,"项目监理机构在施工阶段投资控制的主要工作包括（ ）。",[313,314,315,316],{"key":20,"text":95,"correct":26},{"key":24,"text":97,"correct":26},{"key":28,"text":99,"correct":22},{"key":31,"text":101,"correct":26},{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1109885,"由于建设期价格变动引起的建设投资增加额，属于（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":26},"静态投资",{"key":24,"text":324,"correct":22},"动态投资",{"key":28,"text":326,"correct":26},"计划投资",{"key":31,"text":328,"correct":26},"预期投资",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},1109886,"有效控制项目投资应实行以（ ）为重点的建设全过程投资控制。",[333,335,337,339],{"key":20,"text":334,"correct":22},"设计阶段",{"key":24,"text":336,"correct":26},"施工阶段",{"key":28,"text":338,"correct":26},"项目论证阶段",{"key":31,"text":340,"correct":26},"详细设计阶段",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},1109887,"在动态的投资控制过程中，应着重做好的工作不包括（ ）。",[345,347,348,350],{"key":20,"text":346,"correct":26},"对计划目标值的论证和分析",{"key":24,"text":276,"correct":22},{"key":28,"text":349,"correct":26},"采取控制措施以确保投资控制目标的实现",{"key":31,"text":351,"correct":26},"进行项目计划值与实际值的比较，以判断是否存在偏差",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},1109888,"在建设投资中，（ ）属于动态投资部分。",[356,357,358,360],{"key":20,"text":200,"correct":26},{"key":24,"text":204,"correct":22},{"key":28,"text":359,"correct":26},"设备运杂费",{"key":31,"text":361,"correct":26},"铺底流动资金",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":28,"analysis":33},1109890,"某建设工程设备购置费为500万元，建安工程费为1200万元，预备费为100万元(其中涨价预备费为60％)，建设期利息55万元，土地使用费800万元，铺底流动资金100万元，则该投资的静态投资额是（）万元",[366,368,370,372],{"key":20,"text":367,"correct":26},"1800",{"key":24,"text":369,"correct":26},"1740",{"key":28,"text":371,"correct":22},"2540",{"key":31,"text":373,"correct":26},"2600",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},1109891,"生产性建设工程总投资包括( )两部分。",[378,380,382,383],{"key":20,"text":379,"correct":26},"建设投资和建设期利息",{"key":24,"text":381,"correct":26},"静态投资、建设期利息和流动资金",{"key":28,"text":180,"correct":22},{"key":31,"text":384,"correct":26},"固定资产投资和无形资产投资",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},1109892,"关于设备及工器具购置费用，下列说法中正确的是（）。",[389,391,393,395],{"key":20,"text":390,"correct":26},"它是由设备购置费和工具、器具及生活家具购置费组成",{"key":24,"text":392,"correct":26},"它是固定资产投资中的消极部分",{"key":28,"text":394,"correct":26},"在生产性建设工程中，它占工程造价比重的减小意味着生产技术的进步",{"key":31,"text":396,"correct":22},"在生产性建设工程中，它占工程造价比重的增大意味着资本有机构成的提高",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":28,"analysis":33},1109893,"下列选项中，对建设工程投资特点描述错误的是（）。",[401,403,405,407],{"key":20,"text":402,"correct":26},"建设工程项目投资数额巨大",{"key":24,"text":404,"correct":26},"建设工程项目投资需单独计算",{"key":28,"text":406,"correct":22},"建设工程项目投资核算简捷",{"key":31,"text":408,"correct":26},"建设工程项目投资确定层次繁多",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},1109894,"在建设工程项目中凡是具有独立的设计文件、竣工后可以独立发挥生产能力或工程效益的工程称为（）。",[413,415,417,419],{"key":20,"text":414,"correct":26},"分项工程",{"key":24,"text":416,"correct":26},"分部工程",{"key":28,"text":418,"correct":26},"单位工程",{"key":31,"text":420,"correct":22},"单项工程",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1109895,"工程项目建设过程中，（）是进行技术设计和施工图设计的投资控制目标。",[425,426,427,428],{"key":20,"text":140,"correct":22},{"key":24,"text":122,"correct":26},{"key":28,"text":143,"correct":26},{"key":31,"text":116,"correct":26},{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":28,"analysis":33},1109896,"在项目做出投资决策后，项目投资控制的关键在于（）",[433,435,437,439],{"key":20,"text":434,"correct":26},"勘查",{"key":24,"text":436,"correct":26},"监理",{"key":28,"text":438,"correct":22},"设计",{"key":31,"text":440,"correct":26},"运营",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":33},1109897,"在投资控制的各项措施中，明确管理职能分工属于（ ）。",[445,446,447,448],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1109898,"为了有效地进行投资控制，下列选项中，可采取的技术措施是（）。",[453,455,457,459],{"key":20,"text":454,"correct":26},"采取节约投资的奖励",{"key":24,"text":456,"correct":22},"深入技术领域研究节约投资的可能性",{"key":28,"text":458,"correct":26},"动态地比较项目投资的实际值和计划值",{"key":31,"text":460,"correct":26},"明确管理职能分工",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1109899,"下列项目监理机构施工阶段投资控制的措施中，属于技术措施的是( )。",[465,467,469,471],{"key":20,"text":466,"correct":22},"审核承包人编制的施工组织设计",{"key":24,"text":468,"correct":26},"复核工程付款清单，签发付款证书",{"key":28,"text":470,"correct":26},"审核竣工结算",{"key":31,"text":472,"correct":26},"编制施工阶段投资控制工作计划",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},1109900,"审核竣工结算属于项目监理机构在施工阶段投资控制措施中的（）。",[477,478,479,480],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":481,"correct":26},"合同措施",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1109901,"下列选项中。不属于我国项目监理机构在工程勘察设计阶段投资控制主要工作的是（）。",[486,488,490,492],{"key":20,"text":487,"correct":26},"协助建设单位组织专家对设计成果进行评审",{"key":24,"text":489,"correct":26},"分析可能发生索赔的原因，制定防范对策",{"key":28,"text":491,"correct":26},"审查设计单位提出的设计概算、施工图预算、提出审查意见",{"key":31,"text":493,"correct":22},"处理施工单位提出的工程变更费用",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},1109902,"在监理机构的投资控制中，（）组织对工程变更费用及工期影响做出评估。",[498,500,502,504],{"key":20,"text":499,"correct":26},"专业监理工程师",{"key":24,"text":501,"correct":22},"总监理工程师",{"key":28,"text":503,"correct":26},"监理单位技术负责人",{"key":31,"text":505,"correct":26},"监理单位投资负责人",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},1109903,"项目监理机构在施工阶段进行投资控制，其中复核工程付款账单，签发付款证书是（ ）。",[510,511,512,513],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":481,"correct":26},{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},1109904,"一项工程预计开支或实际开支的全部固定资产投资费用指的是（ ）。",[518,520,521,523],{"key":20,"text":519,"correct":22},"工程造价",{"key":24,"text":166,"correct":26},{"key":28,"text":522,"correct":26},"建设工程总投资",{"key":31,"text":164,"correct":26},{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1109905,"（2014年真题）下列项目监理机构施工阶段投资控制的措施中，属于技术措施的是（ ）。",[528,529,531,532],{"key":20,"text":466,"correct":22},{"key":24,"text":530,"correct":26},"复核工程付款账单，签发付款证书",{"key":28,"text":470,"correct":26},{"key":31,"text":472,"correct":26},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},1109906,"（2016年真题）建设工程项目初步设计，一般依据（ ）编制相应的经济文件。",[537,539,541,543],{"key":20,"text":538,"correct":26},"估算指标",{"key":24,"text":540,"correct":22},"概算指标",{"key":28,"text":542,"correct":26},"概算定额",{"key":31,"text":544,"correct":26},"预算定额",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1109907,"（2017年真题）某项目，建安工程费3000万元，设备工器具购置费4000万元，工程建设其他费用600万元，建设期利息200万元，铺底流动资金160万元，建设期间主要税种的税额45万元，则该项目的静态投资为（ ）万元。",[549,551,553,555],{"key":20,"text":550,"correct":26},"7000",{"key":24,"text":552,"correct":22},"7600",{"key":28,"text":554,"correct":26},"7700",{"key":31,"text":556,"correct":26},"7805",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1109908,"（2018年真题）项目监理机构施工阶段投资控制采取的措施中，属于经济措施的是（ ）。",[561,562,563,565],{"key":20,"text":43,"correct":26},{"key":24,"text":39,"correct":22},{"key":28,"text":564,"correct":26},"编制投资控制工作计划",{"key":31,"text":566,"correct":26},"优化设计节约投资",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},1109909,"（2020年真题）下列费用中，属于静态投资的是（ ）。",[571,572,574,575],{"key":20,"text":204,"correct":26},{"key":24,"text":573,"correct":22},"工程建设其他费",{"key":28,"text":202,"correct":26},{"key":31,"text":576,"correct":26},"汇率变动增加的费用",[578,581,584,587,590,593],{"id":15,"name":579,"category":7,"favorite":580},"领导干部任职前廉政法规知识测试题",92,{"id":582,"name":583,"category":7,"favorite":15},595,"建筑结构与设备",{"id":585,"name":586,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":588,"name":589,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":591,"name":592,"category":7,"favorite":8},534,"BIM工程师",{"id":594,"name":592,"category":7,"favorite":8},535]