[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-47":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,47,50,2641,[13,34,46,58,70,81,93,105,117,127,135,145,157,169,181,193,201,213,225,237,245,254,266,278,290,302,314,326,338,348,360,372,382,394,406,418,430,442,454,466,478,487,499,511,523,535,546,558,570,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1109796,1,"单选题","某建设项目运用价值工程优选设计方案，分析计算结果见下表，则最优方案为( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","甲方案",false,{"key":24,"text":25,"correct":22},"B","乙方案",{"key":27,"text":28,"correct":29},"C","丙方案",true,{"key":31,"text":32,"correct":22},"D","丁方案","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1109797,"方案评价的基本方法包括定性评价法和定量评价法，下列属于定性评价法的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"德尔菲法",{"key":24,"text":41,"correct":22},"直接评分法",{"key":27,"text":43,"correct":22},"加权评分法",{"key":31,"text":45,"correct":22},"环比评分法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1109798,"拟建工程与在建工程采用同一施工图编制预算，但两者的基础部分和现场施工条件部分存在不同。对于相同部分的施工图预算审查，应优先采用的审查方法是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"标准预算审查法",{"key":24,"text":53,"correct":22},"分组计算审查法",{"key":27,"text":55,"correct":29},"对比审查法",{"key":31,"text":57,"correct":22},"“筛选”审查法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1109799,"当初步设计达到一定深度，建筑结构比较明确时，可采用（）编制建筑工程概算。",[62,64,66,68],{"key":20,"text":63,"correct":29},"扩大单价法",{"key":24,"text":65,"correct":22},"生产能力指标法",{"key":27,"text":67,"correct":22},"实物量法",{"key":31,"text":69,"correct":22},"预算单价法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1109800,"可较准确地反映实际水平，适用于市场经济条件波动较大的情况的施工图预算编制方法是( )。",[74,75,77,79],{"key":20,"text":67,"correct":29},{"key":24,"text":76,"correct":22},"分项详细估算法",{"key":27,"text":78,"correct":22},"单价法",{"key":31,"text":80,"correct":22},"综合指标法",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":27,"analysis":33},1109801,"价值工程的三个基本要素是指( )。",[85,87,89,91],{"key":20,"text":86,"correct":22},"生产成本、使用成本和维护成本",{"key":24,"text":88,"correct":22},"必要功能、生产成本和使用价值",{"key":27,"text":90,"correct":29},"价值、功能和寿命周期成本",{"key":31,"text":92,"correct":22},"基本功能、辅助功能和必要功能",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1109802,"用实物量法编制施工图预算，有关人工、材料和施工机械台班的单价，采用的是（）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"预算定额手册中的价格",{"key":24,"text":100,"correct":29},"当时当地的实际市场价格",{"key":27,"text":102,"correct":22},"协会公布的平均价格",{"key":31,"text":104,"correct":22},"政府指导价格",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":27,"analysis":33},1109803,"采用定额单价法计算工程费用时，若分项工程施工工艺条件与定额单价不一致而造成人工、机械的数量增减时，对定额的处理方法一般是（）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"编制补充单价表",{"key":24,"text":112,"correct":22},"直接套用定额单价",{"key":27,"text":114,"correct":29},"调量不换价",{"key":31,"text":116,"correct":22},"按实际价格换算定额单价",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1109804,"当初步设计的设备清单不完备，或安装预算单价及扩大综合单价不全，无法采用预算单价法和扩大单价法时，可采用（）编制概算?",[121,122,123,125],{"key":20,"text":63,"correct":22},{"key":24,"text":69,"correct":22},{"key":27,"text":124,"correct":29},"概算指标法",{"key":31,"text":126,"correct":22},"修正概算指标",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},1109805,"某住宅工程项目设计深度不够，其结构特征与概算指标的结构特征局部有差别，编制设计概算时，宜采用的方法是（）。",[131,132,133,134],{"key":20,"text":63,"correct":22},{"key":24,"text":126,"correct":29},{"key":27,"text":124,"correct":22},{"key":31,"text":69,"correct":22},{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":20,"analysis":33},1109806,"施工图预算审查时，利用房屋建筑工程标准层建筑面积数对楼面找平层、天棚抹灰等工程量进行审查的方法，属于（）。",[139,140,142,144],{"key":20,"text":53,"correct":29},{"key":24,"text":141,"correct":22},"重点审查法",{"key":27,"text":143,"correct":22},"筛选审查法",{"key":31,"text":55,"correct":22},{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},1109807,"实物量法编制施工图预算时，计算并复核工程量后紧接着进行的工作是（）。",[149,151,153,155],{"key":20,"text":150,"correct":22},"套定额单价，计算人料机费用",{"key":24,"text":152,"correct":29},"套消耗定额，计算人料机消耗量",{"key":27,"text":154,"correct":22},"汇总人料机费用",{"key":31,"text":156,"correct":22},"计算管理费等其他各项费用",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":31,"analysis":33},1109808,"下列投资概算中，属于建筑单位工程概算的是（）。",[161,163,165,167],{"key":20,"text":162,"correct":22},"机械设备及安装工程概算",{"key":24,"text":164,"correct":22},"电气设备及安装工程概算",{"key":27,"text":166,"correct":22},"工器具及生产家具购置费用概算",{"key":31,"text":168,"correct":29},"通风工程概算",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":20,"analysis":33},1109809,"（2014年真题）某产品的目标成本为2000元。该产品某零部件的功能重要性系数是0.32，若现实成本为800元，则该零部件成本需要降低（ ）元。",[173,175,177,179],{"key":20,"text":174,"correct":29},"160",{"key":24,"text":176,"correct":22},"210",{"key":27,"text":178,"correct":22},"230",{"key":31,"text":180,"correct":22},"240",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":27,"analysis":33},1109810,"（2015年真题）对价值工程对象进行价值分析时，成本指数是指评价对象的（ ）。",[185,187,189,191],{"key":20,"text":186,"correct":22},"目标成本在总目标成本中所占的比率",{"key":24,"text":188,"correct":22},"目标成本与现实成本的比值",{"key":27,"text":190,"correct":29},"现实成本在全部成本中所占的比率",{"key":31,"text":192,"correct":22},"现实成本与目标成本的比值",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},1109811,"（2017年真题）某工程设计有四个备选方案，经论证，四个方案的功能得分和单方造价如下表。按照价值工程原理，应选择的最优方案是（ ）。",[197,198,199,200],{"key":20,"text":21,"correct":29},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":22},{"key":31,"text":32,"correct":22},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1109812,"（2017年真题）下列费用项中，不属于单项工程综合概算内容的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"单位建筑工程概算",{"key":24,"text":208,"correct":22},"安装工程概算",{"key":27,"text":210,"correct":29},"铺底流动资金概算",{"key":31,"text":212,"correct":22},"设备购置费用概算",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},1109813,"（2018年真题）关于价值工程方法及其特点的说法，正确的是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"价值工程是一种经济评价方法，可用其寻求产品的最低成本",{"key":24,"text":220,"correct":22},"价值工程是一种经济评价方法，可用其寻求产品的合理成本",{"key":27,"text":222,"correct":29},"价值工程是在产品满足功能的前提下，寻求寿命周期成本最低的一种方法",{"key":31,"text":224,"correct":22},"价值工程是在产品满足功能的前提下，寻求寿命周期内合理成本的一种方法",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1109814,"（2018年真题）某建设项目，设备安装费按设备购置费的15%计算，为450万元；建筑工程预算之和为7000万元；工程建设其他费用1500万元；基本预备费率为8%；涨价预备费及铺底流动资金为1200万元，则该建设项目的总预算额为（ ）万元。",[229,231,233,235],{"key":20,"text":230,"correct":22},"11106",{"key":24,"text":232,"correct":22},"12906",{"key":27,"text":234,"correct":22},"13906",{"key":31,"text":236,"correct":29},"14106",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1109815,"（2019年真题）某项目应用价值工程原理进行方案择优，各方案的功能系数和单方造价见下表，则最优方案为（ ）。",[241,242,243,244],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":29},{"key":27,"text":28,"correct":22},{"key":31,"text":32,"correct":22},{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},1109816,"（2019年真题）能较快发现问题，审查速度快，但问题出现的原因还需继续审查的施工图预算审查方法是（ ）。",[249,250,252,253],{"key":20,"text":55,"correct":22},{"key":24,"text":251,"correct":22},"逐项审查法",{"key":27,"text":51,"correct":22},{"key":31,"text":57,"correct":29},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":24,"analysis":33},1109817,"（2020年真题）分项工程单位估价表是预算定额法编制施工图预算的重要依据，分项工程单位估价表中的单价包含完成相应分项工程所需的人工费、材料费和（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":22},"企业管理费",{"key":24,"text":261,"correct":29},"施工机具使用费",{"key":27,"text":263,"correct":22},"规费",{"key":31,"text":265,"correct":22},"税金",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":27,"analysis":33},1109818,"（2020年真题）建设项目设计概算文件采用三级概算或二级概算的区别，在于是否单独编制（ ）文件。",[270,272,274,276],{"key":20,"text":271,"correct":22},"分部工程概算",{"key":24,"text":273,"correct":22},"单位工程概算",{"key":27,"text":275,"correct":29},"单项工程综合概算",{"key":31,"text":277,"correct":22},"建设项目总概算",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},1109819,"（2020年真题）民用建筑工程设计方案适用性评价时，建筑基地内人流、车流和物流是是否合理分流，属于（ ）评价的内容。",[282,284,286,288],{"key":20,"text":283,"correct":29},"场地设计",{"key":24,"text":285,"correct":22},"建筑物设计",{"key":27,"text":287,"correct":22},"规划控制指标",{"key":31,"text":289,"correct":22},"绿色设计",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1109820,"（2020年真题）某产品4个功能区的功能指数和现实成本如下表。若产品总成本保持不变，以成本改进期望值为依据，则应优先作为价值工程改进对象的是（ ）",[294,296,298,300],{"key":20,"text":295,"correct":22},"F1",{"key":24,"text":297,"correct":29},"F2",{"key":27,"text":299,"correct":22},"F3",{"key":31,"text":301,"correct":22},"F4",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},1109821,"某项目，建安工程费3000万元，设备工器具购置费4000万元，工程建设其他费用600万元，建设期利息200万元，铺底流动资金160万元，建设期间主要税种的税额45万元，则该项目的静态投资为（ ）万元。",[306,308,310,312],{"key":20,"text":307,"correct":22},"7000",{"key":24,"text":309,"correct":29},"7600",{"key":27,"text":311,"correct":22},"7700",{"key":31,"text":313,"correct":22},"7805",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},1109822,"建设工程项目初步设计，一般依据（ ）编制相应的经济文件。",[318,320,322,324],{"key":20,"text":319,"correct":22},"估算指标",{"key":24,"text":321,"correct":29},"概算指标",{"key":27,"text":323,"correct":22},"概算定额",{"key":31,"text":325,"correct":22},"预算定额",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},1109823,"在建设投资中，()属于动态投资部分",[330,332,334,336],{"key":20,"text":331,"correct":22},"基本预备费",{"key":24,"text":333,"correct":29},"建设期利息",{"key":27,"text":335,"correct":22},"设备运杂费",{"key":31,"text":337,"correct":22},"铺底流动资金",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1109824,"从确定建设工程投资的依据看，编制估算指标的直接基础是()。",[342,343,344,346],{"key":20,"text":323,"correct":29},{"key":24,"text":325,"correct":22},{"key":27,"text":345,"correct":22},"工程量清单",{"key":31,"text":347,"correct":22},"施工定额",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":27,"analysis":33},1109825,"凡是具有独立的设计文件、竣工后可以独立发挥生产能力或工程效益的工程称为()",[352,354,356,358],{"key":20,"text":353,"correct":22},"A分布工程",{"key":24,"text":355,"correct":22},"B单位工程",{"key":27,"text":357,"correct":29},"C单项工程",{"key":31,"text":359,"correct":22},"D分项工程",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":24,"analysis":33},1109826,"由于建设期价格变动引起的固定资产投资增加额，属于（）。",[364,366,368,370],{"key":20,"text":365,"correct":22},"静态投资",{"key":24,"text":367,"correct":29},"动态投资",{"key":27,"text":369,"correct":22},"计划投资",{"key":31,"text":371,"correct":22},"预期投资",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},1109827,"静态投资包括建筑安装工程费、设备及工器具购置费、工程建设其他费用和（）。",[376,378,379,381],{"key":20,"text":377,"correct":22},"预备费",{"key":24,"text":331,"correct":29},{"key":27,"text":380,"correct":22},"涨价预备费",{"key":31,"text":333,"correct":22},{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1109828,"某建设工程设备及工器具购置费为500万元，基本预备费为90万元，建筑安装工程投资为1200万元，建设期利息为55万元，土地使用费为800万元，铺底流动资金为100万元，则固定资产投资中动态投资为（）万元",[386,388,390,392],{"key":20,"text":387,"correct":29},"55",{"key":24,"text":389,"correct":22},"145",{"key":27,"text":391,"correct":22},"155",{"key":31,"text":393,"correct":22},"245",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1109829,"某建设项目，建安工程费为40000万元，设备及工器具购置费为5000万元，建设期利息为1400万元，工程建设其他费为4000万元，建设期预备费为9500万元(其中基本预备费为4900万元)，项目的铺底流动资金为600万元，则该项目的动态投资额为（）万元",[398,400,402,404],{"key":20,"text":399,"correct":29},"6000",{"key":24,"text":401,"correct":22},"6600",{"key":27,"text":403,"correct":22},"11500",{"key":31,"text":405,"correct":22},"59900",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1109830,"某项目建筑安装工程费为1000万元，设备工器具购置费为700万元，工程建设其他费为500万元，基本预备费为100万元，涨价预备费为150万元，建设期利息为60万元，则该项目的静态投资为 ( )万元。",[410,412,414,416],{"key":20,"text":411,"correct":22},"2200",{"key":24,"text":413,"correct":29},"2300",{"key":27,"text":415,"correct":22},"2450",{"key":31,"text":417,"correct":22},"2510",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},1109832,"某项目投资中，建筑安装工程费用为560万元，设备及工器具购置费为330万元，工程建设其他费用为110万元，基本预备费为100万元，涨价预备费为55万元，建设期贷款利息为59万元，则静态投资是（）万元",[422,424,426,428],{"key":20,"text":423,"correct":22},"1000",{"key":24,"text":425,"correct":29},"1100",{"key":27,"text":427,"correct":22},"1155",{"key":31,"text":429,"correct":22},"1214",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},1109834,"在某建设项目投资构成中，建筑安装工程费为2000万元，设备及工器具购置费为1000万元，工程建设其他费用为500万元，预备费为200万元，建设期贷款1800万元，应计利息为80万元，流动资金贷款400万元，则该建设项目的建设投资为（）万元。",[434,436,438,440],{"key":20,"text":435,"correct":22},"5980",{"key":24,"text":437,"correct":22},"5580",{"key":27,"text":439,"correct":22},"3780",{"key":31,"text":441,"correct":29},"3700",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},1109835,"下列费用中，不属于静态投资的是（）",[446,448,450,452],{"key":20,"text":447,"correct":22},"设备及工器具购置费",{"key":24,"text":449,"correct":22},"建设单位管理费",{"key":27,"text":451,"correct":29},"建设期贷款利息",{"key":31,"text":453,"correct":22},"研究试验费",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},1109837,"非生产性建设工程项目总投资包括（）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"括建设投资、建设期利息和流动资金",{"key":24,"text":461,"correct":22},"建设投资和流动资金",{"key":27,"text":463,"correct":29},"固定资产投资",{"key":31,"text":465,"correct":22},"建安工程费、工程建设其他费、预备费、建设期利息和流动资金",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1109838,"在生产性建设工程中，（）是建设工程项目投资中的积极部分。",[470,472,474,476],{"key":20,"text":471,"correct":22},"建筑安装工程费",{"key":24,"text":473,"correct":29},"设备工器具购置费",{"key":27,"text":475,"correct":22},"工程建设其他费",{"key":31,"text":477,"correct":22},"流动资金",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},1109839,"编制工程概算定额的基础是( )。",[482,483,484,486],{"key":20,"text":319,"correct":22},{"key":24,"text":321,"correct":22},{"key":27,"text":485,"correct":22},"预算指标",{"key":31,"text":325,"correct":29},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},1109840,"下列有关建设工程项目投资确定依据的概念，描述错误的是（）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"预算定额是概算定额编制的基础",{"key":24,"text":494,"correct":22},"概算定额是估算指标编制的基础",{"key":27,"text":496,"correct":22},"估算指标控制着概算指标的水平",{"key":31,"text":498,"correct":29},"每个项目的概算、预算都要单独计算",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1109843,"建设工程项目投资的确定层次繁多，体现于按（）顺序计算，并逐级汇总。",[503,505,507,509],{"key":20,"text":504,"correct":29},"分项、分部、单位、单项工程",{"key":24,"text":506,"correct":22},"土建、安装设备工程流动资金",{"key":27,"text":508,"correct":22},"分部、分项、单项、单位工程",{"key":31,"text":510,"correct":22},"设备、土建、安装工程",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},1109845,"某项目，建安工程费1000万元，设备及工器具购置费2000万元，工程建设其他费用300万元，基本预备费160万元，建设期间国家新批准税种的税额45万元，建设期贷款利息60万元，涨价预备费80万元，流动资金800万元。则该项目的固定资产投资为（ ）万元。",[515,517,519,521],{"key":20,"text":516,"correct":22},"3520",{"key":24,"text":518,"correct":22},"3540",{"key":27,"text":520,"correct":29},"3600",{"key":31,"text":522,"correct":22},"4400",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1109846,"项目监理机构施工阶段投资控制采取的措施中，属于经济措施的是（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"控制设计变更",{"key":24,"text":530,"correct":29},"编制资金使用计划",{"key":27,"text":532,"correct":22},"编制投资控制工作计划",{"key":31,"text":534,"correct":22},"优化设计节约投资",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},1109847,"建设工程项目技术设计和施工图设计应依据()设置投资控制目标。",[539,541,543,545],{"key":20,"text":540,"correct":22},"投资估算",{"key":24,"text":542,"correct":29},"设计概算",{"key":27,"text":544,"correct":22},"施工图预算",{"key":31,"text":345,"correct":22},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},1109848,"建设项目投资决策后，投资控制的关键阶段是()。",[550,552,554,556],{"key":20,"text":551,"correct":29},"设计阶段",{"key":24,"text":553,"correct":22},"施工招标阶段",{"key":27,"text":555,"correct":22},"施工阶段",{"key":31,"text":557,"correct":22},"竣工阶段",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1109849,"下列选项中，不属于在动态的投资控制过程中应着重做好的工作的是（）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"对计划目标值的论证和分析",{"key":24,"text":565,"correct":29},"明确项目投资控制者及其任务",{"key":27,"text":567,"correct":22},"采取控制措施以确保投资控制目标的实现",{"key":31,"text":569,"correct":22},"进行项目计划值与实际值的比较，以判断是否存在偏差",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":20,"analysis":33},1109851,"建设工程设计方案选择和进行初步设计的投资控制目标是（）。",[574,575,576,577],{"key":20,"text":540,"correct":29},{"key":24,"text":542,"correct":22},{"key":27,"text":544,"correct":22},{"key":31,"text":578,"correct":22},"建安工程承包合同价",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},1109853,"在建设项目投资各阶段中，下列影响项目投资的可能性最高的是（）。",[583,585,587,589],{"key":20,"text":584,"correct":29},"初步设计",{"key":24,"text":586,"correct":22},"技术设计",{"key":27,"text":588,"correct":22},"施工图设计",{"key":31,"text":590,"correct":22},"施工剩余设计",[592,595,598,601,604,607],{"id":15,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":15},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]