[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-46":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,46,50,2641,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,210,222,230,238,250,262,274,286,298,310,322,332,343,355,367,377,389,401,413,425,434,446,458,470,482,494,503,514,525,537,549,557,565,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1109726,1,"单选题","（2018年真题）投标人在确定投标报价的综合单价时，主要应以（ ）为准。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","业主提供的设计图纸",false,{"key":24,"text":25,"correct":26},"B","招标工程量清单的项目特征描述",true,{"key":28,"text":29,"correct":22},"C","图纸会审的记录",{"key":31,"text":32,"correct":22},"D","业主组织现场踏勘的记录","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1109727,"（2019年真题）采用成本加奖罚合同，当实际成本大于预期成本时，承包人可以得到（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"工程成本、酬金和预先约定的奖金",{"key":24,"text":41,"correct":22},"工程成本和预先约定的奖金，不能得到酬金",{"key":28,"text":43,"correct":22},"工程成本，但不能得到酬金和预先约定的奖金",{"key":31,"text":45,"correct":26},"工程成本和酬金，但也可能会处以一笔罚金",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1109728,"（2019年真题）某工程施工过程中发生了一项未在合同中约定的零星工作，增加费用2万元，此费用应列入工程的（ ）中。",[50,52,54,56],{"key":20,"text":51,"correct":22},"暂列金额",{"key":24,"text":53,"correct":22},"暂估价",{"key":28,"text":55,"correct":26},"计日工",{"key":31,"text":57,"correct":22},"总承包服务费",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1109729,"（2019年真题）下列招标文件所列的工程量清单中，不可调整的闭口清单是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"分部分项工程量清单",{"key":24,"text":65,"correct":22},"能计量的措施项目清单",{"key":28,"text":67,"correct":22},"不能计量的措施项目清单",{"key":31,"text":69,"correct":22},"其他项目清单",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1109730,"（2020年真题）根据《建设工程工程量清单计价规范》，编制招标控制价时，总承包服务费应按照（ ）计算。",[74,76,78,80],{"key":20,"text":75,"correct":26},"省级或行业建设主管部门规定或参考相关规范",{"key":24,"text":77,"correct":22},"国家统一规定或参考相关规范",{"key":28,"text":79,"correct":22},"工程所在地同类项目总承包服务费平均水平",{"key":31,"text":81,"correct":22},"招标控制价编制单位咨询潜在投标人的报价人",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1109731,"（2020年真题）工程招标投标过程中，投标人发现招标工程量清单项目特征描述与设计图纸不符，则投标人应（ ）确定投标综合单价。",[86,88,90,92],{"key":20,"text":87,"correct":22},"向设计单位提出质疑并根据计单位的答复",{"key":24,"text":89,"correct":22},"按有利于投标人原则选择清单项目特征描述或按设计图纸",{"key":28,"text":91,"correct":22},"按设计图纸修正后的清单项目特征描述",{"key":31,"text":93,"correct":26},"以招标工程量清单项目特征描述为准",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1109732,"（2020年真题）某实行招标的工程，招标文件与中标人投标文件中的合同价款不一致时，签订书面合同时确定合同价款应以（ ）为准。",[98,100,102,104],{"key":20,"text":99,"correct":22},"有利于招标人的约定",{"key":24,"text":101,"correct":22},"招标人和投标人重新谈判的结果",{"key":28,"text":103,"correct":26},"中标人投标文件",{"key":31,"text":105,"correct":22},"招标文件",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1109735,"根据各种方案能够达到各项功能要求的程度，按10分制（或100分制）评分，然后算出每个方案达到功能要求的总分，比较各方案总分，作出采纳、保留、舍弃的决定，再对采纳、保留的方案进行成本比较，最后确定最优方案。这一设计方案评价方法是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"德尔菲（Delphi）法",{"key":24,"text":113,"correct":22},"优缺点列举法",{"key":28,"text":115,"correct":22},"加权评分法",{"key":31,"text":117,"correct":26},"直接评分法",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1109738,"价值工程的核心是对产品进行（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"成本分析",{"key":24,"text":125,"correct":22},"信息搜集",{"key":28,"text":127,"correct":22},"方案创新",{"key":31,"text":129,"correct":26},"功能分析",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1109739,"对某产品进行价值分析，其产品功能与成本关系如下图所示，图中C1最有可能表示（ ）随产品功能变动的变化规律。",[134,136,138,140],{"key":20,"text":135,"correct":26},"用户购买产品的费用",{"key":24,"text":137,"correct":22},"产品使用成本",{"key":28,"text":139,"correct":22},"产品维护成本",{"key":31,"text":141,"correct":22},"产品报废拆除所需费用",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1109740,"根据功能重要程度选择价值工程对象的方法称为（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"因素分析法",{"key":24,"text":149,"correct":22},"ABC分析法",{"key":28,"text":151,"correct":26},"强制确定法",{"key":31,"text":153,"correct":22},"价值指数法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1109741,"价值工程功能评价的程序如下图，图中“*”位置应进行的工作是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"整理功能之间的逻辑关系",{"key":24,"text":161,"correct":26},"确定功能评价值",{"key":28,"text":163,"correct":22},"确定目标成本",{"key":31,"text":165,"correct":22},"确定基本功能",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1109742,"某产品的目标成本为2000元。该产品某零部件的功能重要性系数是0.32，若现实成本为800元，则该零部件成本需要降低（ ）元。",[170,172,174,176],{"key":20,"text":171,"correct":26},"160",{"key":24,"text":173,"correct":22},"210",{"key":28,"text":175,"correct":22},"230",{"key":31,"text":177,"correct":22},"240",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1109743,"现有四个施工方案可供选择，其功能评分和寿命周期成本相关数据见下表，则根据价值工程原理应选择的最佳方案是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"甲",{"key":24,"text":185,"correct":26},"乙",{"key":28,"text":187,"correct":22},"丙",{"key":31,"text":189,"correct":22},"丁",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1109744,"某项目应用价值工程原理进行方案择优，各方案的功能系数和单方造价见下表，则最优方案为（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"甲方案",{"key":24,"text":197,"correct":26},"乙方案",{"key":28,"text":199,"correct":22},"丙方案",{"key":31,"text":201,"correct":22},"丁方案",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1109746,"某建设项目运用价值工程优选设计方案，分析计算结果见下表，则最优方案为( )。",[206,207,208,209],{"key":20,"text":195,"correct":22},{"key":24,"text":197,"correct":22},{"key":28,"text":199,"correct":26},{"key":31,"text":201,"correct":22},{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":28,"analysis":33},1109749,"用价值工程原理进行设计方案的优选，就是要从多个备选方案中选出（ ）的方案。",[214,216,218,220],{"key":20,"text":215,"correct":22},"功能最好",{"key":24,"text":217,"correct":22},"成本最低",{"key":28,"text":219,"correct":26},"价值最高",{"key":31,"text":221,"correct":22},"技术最新",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":31,"analysis":33},1109750,"应作为价值工程改进对象的是（ ）。",[226,227,228,229],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":22},{"key":28,"text":187,"correct":22},{"key":31,"text":189,"correct":26},{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":31,"analysis":33},1109751,"采用强制确定法对某工程四个分部工程进行价值工程对象的选择，各分部工程的功能系数和成本系数见下表。 根据计算，应优先选择分部工程（ ）为价值工程对象。",[234,235,236,237],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":22},{"key":28,"text":187,"correct":22},{"key":31,"text":189,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1109752,"价值工程中的全寿命周期费用是指（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"生产过程发生的全部成本",{"key":24,"text":245,"correct":22},"从开始使用至报废过程中发生的费用总和",{"key":28,"text":247,"correct":22},"产品存续期的总成本",{"key":31,"text":249,"correct":26},"生产费用、使用费用之和",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1109754,"关于设计概算的说法，错误的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"设计概算是确定和控制建设工程项目全部投资的文件",{"key":24,"text":257,"correct":26},"编制设计概算不需考虑建设项目施工条件对投资的影响",{"key":28,"text":259,"correct":22},"如果设计概算值超过投资建设额，必须修改设计或重新立项审批",{"key":31,"text":261,"correct":22},"设计概算由设计单位负责编制，并对其编制质量负责",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1109755,"设计概算的三级概算是指（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"建筑工程概算、安装工程概算、设备及工器具购置费概算",{"key":24,"text":269,"correct":22},"建设投资概算、建设期利息概算、铺底流动资金概算",{"key":28,"text":271,"correct":22},"主要工程项目概算、辅助和服务性工程项目概算、室内外工程项目概算",{"key":31,"text":273,"correct":26},"单位工程概算、单项工程综合概算、建设工程总概算",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1109756,"下列单位工程概算中，属于设备及安装工程概算的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"通风工程概算",{"key":24,"text":281,"correct":22},"电气照明工程概算",{"key":28,"text":283,"correct":22},"给排水工程概算",{"key":31,"text":285,"correct":26},"电气设备及安装工程概算",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1109757,"某建设项目的建筑面积为10000㎡，按类似工程概算指标计算的一般土建工程单位概算造价为1158.84元\u002F㎡（其中人、料、机费用为800元\u002F㎡），项目所在地建筑安装工程管理费率为8%，按人、料、机和企业管理费计算的规费费率为15%，利润率为7%；增值税税率为9%，与类似工程概算指标规定的结构特比较，该项目结构有部分变更，换出结构构件中每100㎡的人、料、机费用为12450元，换入结构构件中每100㎡的人、料、机费用为15800元，人、料、机费用均不包含增值税可抵扣进项税额，则该项目一般土建工程修正后的概算单价为（ ）元\u002F㎡",[290,292,294,296],{"key":20,"text":291,"correct":22},"833.50",{"key":24,"text":293,"correct":26},"1207.36",{"key":28,"text":295,"correct":22},"1192.34",{"key":31,"text":297,"correct":22},"1316.84",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1109758,"当初步设计的设备清单不完备，或仅有成套设备的重量时，应优先采用（ ）编制设备安装工程概算。",[302,304,306,308],{"key":20,"text":303,"correct":26},"综合扩大单价法",{"key":24,"text":305,"correct":22},"概算指标法",{"key":28,"text":307,"correct":22},"修正概算指标法",{"key":31,"text":309,"correct":22},"预算单价法",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1109762,"下列费用项中，不属于单项工程综合概算内容的是()。",[314,316,318,320],{"key":20,"text":315,"correct":22},"单位建筑工程概算",{"key":24,"text":317,"correct":22},"安装工程概算",{"key":28,"text":319,"correct":26},"铺底流动资金概算",{"key":31,"text":321,"correct":22},"设备购置费用概算",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1109763,"某住宅工程项目设计深度不够，其结构特征与概算指标的结构特征局部有差别，编制设计概算时，宜采用的方法是()。",[326,328,330,331],{"key":20,"text":327,"correct":22},"扩大单价法",{"key":24,"text":329,"correct":26},"修正概算指标",{"key":28,"text":305,"correct":22},{"key":31,"text":309,"correct":22},{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},1109764,"单位工程概算按其工程性质可分为单位建筑工程概算和单位设备及安装工程概算两类，下列属于单位设备及安装工程概算的是（ ）。",[336,338,340,341],{"key":20,"text":337,"correct":22},"通风、空调工程概算",{"key":24,"text":339,"correct":26},"工器具及生产家具购置费概算",{"key":28,"text":281,"correct":22},{"key":31,"text":342,"correct":22},"给水排水工程概算",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":31,"analysis":33},1109765,"当建设项目为一个单项工程时，其设计概算应采用的编制形式是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"单位工程概算、单项工程综合概算和建设项目总概算三级",{"key":24,"text":350,"correct":22},"单位工程概算和单项工程综合概算二级",{"key":28,"text":352,"correct":22},"单项工程综合概算和建设项目总概算二级",{"key":31,"text":354,"correct":26},"单位工程概算和建设项目总概算二级",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":24,"analysis":33},1109766,"下列原因中，不能作为调整设计概算依据的是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"超出原设计范围的重大变更",{"key":24,"text":362,"correct":26},"超出承包人预期的货币贬值和汇率变化",{"key":28,"text":364,"correct":22},"超出基本预备费规定范围的不可抗拒重大自然灾害引起的工程变动和费用增加",{"key":31,"text":366,"correct":22},"超出预备费的国家重大政策性调整",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},1109767,"在建筑工程初步设计文件深度不够、不能准确计算出工程量的情况下，可采用的设计概算编制方法是（ ）。",[371,373,374,375],{"key":20,"text":372,"correct":22},"概算定额法",{"key":24,"text":305,"correct":26},{"key":28,"text":309,"correct":22},{"key":31,"text":376,"correct":22},"综合吨位指标法",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},1109772,"定额单价法编制施工图预算的过程包括：①计算工程量；②套用定额单价，计算人、材、机费；③按计价程序计取其他费用，并汇总造价；④编制工料分析表；⑤准备资料，熟悉施工图纸。正确的排列顺序是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"④⑤②①③",{"key":24,"text":384,"correct":22},"④⑤①②③",{"key":28,"text":386,"correct":22},"⑤②①③④",{"key":31,"text":388,"correct":26},"⑤①②④③",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1109773,"采用定额单价法编制施工图预算时，如果分项工程的某一种主要材料品种与预算单价或单位估价表中规定材料不一致时，该分项工程单价的确定方法是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":26},"按实际使用材料价格换算预算单价",{"key":24,"text":396,"correct":22},"直接套用同类材料的预算单价",{"key":28,"text":398,"correct":22},"调整工程量而不换算预算单价",{"key":31,"text":400,"correct":22},"编制补充单位估价表",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1109774,"当工程条件相同时，用已完工程的预算审查拟建工程的同类工程预算的方法是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"标准预算审查法",{"key":24,"text":408,"correct":22},"分组审查法",{"key":28,"text":410,"correct":22},"重点审查法",{"key":31,"text":412,"correct":26},"对比审查法",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":28,"analysis":33},1109780,"实物量法编制施工图预算所用的材料单价应采用（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"网上咨询厂家的报价",{"key":24,"text":420,"correct":22},"编制预算定额时采用的单价",{"key":28,"text":422,"correct":26},"当时当地的实际价格",{"key":31,"text":424,"correct":22},"预算定额中采用的单价加上运杂费",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1109781,"拟建工程与已完工程采用同一施工图，但基础部分和现场施工条件不同，则与已完工程相同的部分可采用（ ）审查施工图预算。",[429,430,431,433],{"key":20,"text":406,"correct":22},{"key":24,"text":412,"correct":26},{"key":28,"text":432,"correct":22},"“筛选”审查法",{"key":31,"text":410,"correct":22},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":28,"analysis":33},1109782,"用概算指标法计算建筑工程概算价值的主要步骤有：①计算单位建筑面积或体积的人材机费用；②计算技术经济指标；③计算单位建筑面积或体积的企业管理费、利润、规费、税金及概算单价；④计算单位工程概算价值。这些步骤正确的顺序是（）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"①→②→③→④",{"key":24,"text":441,"correct":22},"①→③→②→④",{"key":28,"text":443,"correct":26},"①→③→④→②",{"key":31,"text":445,"correct":22},"②→①→③→④",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1109783,"在价值工程的工作程序中，功能评价是属于（）的工作内容。",[450,452,454,456],{"key":20,"text":451,"correct":22},"准备阶段",{"key":24,"text":453,"correct":26},"分析阶段",{"key":28,"text":455,"correct":22},"创新阶段",{"key":31,"text":457,"correct":22},"方案实施与评价阶段",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},1109784,"编制各级预算的基础是（）施工图预算。",[462,464,466,468],{"key":20,"text":463,"correct":22},"单项工程",{"key":24,"text":465,"correct":26},"单位工程",{"key":28,"text":467,"correct":22},"分部工程",{"key":31,"text":469,"correct":22},"分项工程",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1109785,"某工程项目的设计概算文件，采用二级概算编制。下列选项中，不属于二级概算编制文件组成的是（）。",[474,476,478,480],{"key":20,"text":475,"correct":22},"编制说明",{"key":24,"text":477,"correct":22},"总概算表",{"key":28,"text":479,"correct":26},"综合概算表",{"key":31,"text":481,"correct":22},"单位工程概算表",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":20,"analysis":33},1109786,"开展价值工程活动的目的是（）。",[486,488,490,492],{"key":20,"text":487,"correct":26},"提高对象的价值",{"key":24,"text":489,"correct":22},"实现使用者需要的功能",{"key":28,"text":491,"correct":22},"降低产品的寿命周期成本",{"key":31,"text":493,"correct":22},"对产品进行功能分析",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":28,"analysis":33},1109787,"施工图预算的方法中，简单易懂，便于掌握，审查速度快，便于发现问题，但问题出现的原因尚需继续审查的方法是（）。",[498,500,501,502],{"key":20,"text":499,"correct":22},"全面审查法",{"key":24,"text":412,"correct":22},{"key":28,"text":432,"correct":26},{"key":31,"text":410,"correct":22},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":31,"analysis":33},1109788,"在新方案创造中，组织者将问题函寄专家后获得反馈意见，整理分析后再函寄，直到得出新方案。此方法指的是（）。",[507,508,510,512],{"key":20,"text":151,"correct":22},{"key":24,"text":509,"correct":22},"头脑风暴法",{"key":28,"text":511,"correct":22},"哥顿法",{"key":31,"text":513,"correct":26},"德尔菲法",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1109789,"三级预算编制形式的工程预算文件与二级工程预算文件相比，额外拥有的是（）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"总预算表",{"key":24,"text":521,"correct":26},"综合预算表",{"key":28,"text":523,"correct":22},"单位工程预算表",{"key":31,"text":475,"correct":22},{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1109790,"下列选项中，不属于施工图预算的编制依据的是（）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"国家发布的计价依据",{"key":24,"text":532,"correct":26},"批准的估算",{"key":28,"text":534,"correct":22},"合理的施工组织设计",{"key":31,"text":536,"correct":22},"造价工作手册及有关工具书",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},1109791,"下列选项中，不属于重点审查法审查重点的是（）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"工程量大的工程",{"key":24,"text":544,"correct":22},"造价较高的工程",{"key":28,"text":546,"correct":22},"计费基础、取费标准",{"key":31,"text":548,"correct":26},"工期长的工程",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},1109792,"运用价值工程优选设计方案，分析计算结果为：甲方案单方造价1500元，价值系数为1.13；乙方案单方造价1550元，价值系数1.25；丙方案单方造价1300元，价值系数0.89；丁方案单方造价1320元，价值系数1.08。则最优方案为( )。",[553,554,555,556],{"key":20,"text":195,"correct":22},{"key":24,"text":197,"correct":26},{"key":28,"text":199,"correct":22},{"key":31,"text":201,"correct":22},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},1109793,"当初步设计有详细设备清单时，编制设备安装工程概算精确性较高的方法是( )。",[561,562,563,564],{"key":20,"text":327,"correct":22},{"key":24,"text":305,"correct":22},{"key":28,"text":307,"correct":22},{"key":31,"text":309,"correct":26},{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},1109794,"利用评价人员的知识、经验和判断，对评价对象进行评审和比较的评标方法，属于（）方法",[569,571,573,575],{"key":20,"text":570,"correct":22},"定量评价",{"key":24,"text":572,"correct":26},"定性评价",{"key":28,"text":574,"correct":22},"综合评价",{"key":31,"text":576,"correct":22},"定性评价定量化",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":28,"analysis":33},1109795,"施工图预算审查方法中，审查质量高、效果好但工作量大的是( )。",[581,582,583,585],{"key":20,"text":406,"correct":22},{"key":24,"text":410,"correct":22},{"key":28,"text":584,"correct":26},"逐项审查法",{"key":31,"text":412,"correct":22},[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]