[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-45":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,45,50,2641,[13,34,46,55,67,79,91,103,115,127,139,151,163,175,187,199,211,220,232,244,256,268,280,292,304,316,326,337,349,361,373,385,396,408,419,431,443,455,467,479,491,500,511,523,533,542,554,566,577,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1109666,1,"单选题","在成本加酬金合同中，承包方可得到实际成本和酬金，但视实际成本高出预期成本的情况，被处以一笔罚金，此种约定属于（）合同。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","成本加固定百分比酬金",false,{"key":24,"text":25,"correct":22},"B","成本加固定金额酬金",{"key":27,"text":28,"correct":29},"C","成本加奖罚",true,{"key":31,"text":32,"correct":22},"D","最高限额成本加固定最大酬金","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1109673,"某施工项目，发包方与承包方按固定总价签订了工程承包合同，合同实施过程中可以对合同总价做相应变更的情况是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"通货膨胀带来成本上涨",{"key":24,"text":41,"correct":22},"定额消耗量变化",{"key":27,"text":43,"correct":22},"遇雨季导致工期延长",{"key":31,"text":45,"correct":29},"设计变更",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1109678,"下列不属于成本加酬金合同的是（ ）。",[50,51,52,54],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":53,"correct":29},"最高限额成本加可变酬金",{"key":31,"text":28,"correct":22},{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":31,"analysis":33},1109679,"采用固定总价合同时，发包人承担的风险是()。",[59,61,63,65],{"key":20,"text":60,"correct":22},"实物工程量变化",{"key":24,"text":62,"correct":22},"工程单价变化",{"key":27,"text":64,"correct":22},"工期延误",{"key":31,"text":66,"correct":29},"工程范围变更",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":31,"analysis":33},1109680,"采用可调总价合同时，发包方承担了()风险。",[71,73,75,77],{"key":20,"text":72,"correct":22},"实物工程量",{"key":24,"text":74,"correct":22},"成本",{"key":27,"text":76,"correct":22},"工期",{"key":31,"text":78,"correct":29},"通货膨胀",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":27,"analysis":33},1109681,"根据现行计价规范，实行工程量清单计价的工程，应采用()合同。",[83,85,87,89],{"key":20,"text":84,"correct":22},"固定总价",{"key":24,"text":86,"correct":22},"可调总价",{"key":27,"text":88,"correct":29},"单价",{"key":31,"text":90,"correct":22},"成本加酬金",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},1109682,"关于合同价款及计价方式的说法，错误的是()。",[95,97,99,101],{"key":20,"text":96,"correct":22},"实行工程量清单计价的工程，应采用单价合同",{"key":24,"text":98,"correct":29},"实行招标的工程合同价款应在中标通知书发出之日起28日内由发承包双方约定",{"key":27,"text":100,"correct":22},"不实行招标的工程合同价款，应在发承包双方认可的工程价款基础上在合同中约定",{"key":31,"text":102,"correct":22},"实行招标的工程价款应由发承包双方根据招标文件和中标人的投标文件在书面合同中约定",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1109683,"在招标投标过程中，当出现招标工程量清单特征描述与设计图纸不符时，投标人应以（）为准，确定投标报价的综合单价。",[107,109,111,113],{"key":20,"text":108,"correct":29},"招标工程量清单的项目特征描述",{"key":24,"text":110,"correct":22},"设计图纸的项目特征描述",{"key":27,"text":112,"correct":22},"设计变更的项目特征描述",{"key":31,"text":114,"correct":22},"实际施工的项目特征描述",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},1109684,"根据《建设工程工程量清单计价规范》下列工程项目中必须采用工程量清单计价的是( )。",[119,121,123,125],{"key":20,"text":120,"correct":22},"社会投资的5万平方米以上的住宅小区工程",{"key":24,"text":122,"correct":29},"地方政府投资的城市绿化工程",{"key":27,"text":124,"correct":22},"非国有单位向银行借款投资建设的办公楼工程",{"key":31,"text":126,"correct":22},"某国外企业出资援建的学校教学楼工程",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},1109685,"下列关于分部分项工程量清单编制的说法中，错误的是( )。",[131,133,135,137],{"key":20,"text":132,"correct":22},"清单应包括项目编码、项目名称",{"key":24,"text":134,"correct":22},"清单应包括项目特征、计量单位和工程量",{"key":27,"text":136,"correct":22},"清单为不可调整的闭口清单",{"key":31,"text":138,"correct":29},"清单项目出现遗漏，投标人可根据工程实际补充",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":27,"analysis":33},1109686,"某工程采用固定总价合同，合同执行过程中，在发生（）的情况下，发包方应对合同总价作相应的调整。",[143,145,147,149],{"key":20,"text":144,"correct":22},"承包商漏算工程量",{"key":24,"text":146,"correct":22},"工、料、机价格上涨",{"key":27,"text":148,"correct":29},"工程范围调整",{"key":31,"text":150,"correct":22},"出现恶劣气候",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},1109687,"关于招标控制价的说法，错误的有( )。",[155,157,159,161],{"key":20,"text":156,"correct":22},"招标控制价是招标人对招标工程的最高投标限价",{"key":24,"text":158,"correct":22},"招标人应在招标文件中如实公布招标控制价",{"key":27,"text":160,"correct":29},"招标控制价可以进行上浮或下调",{"key":31,"text":162,"correct":22},"招标文件中应公布招标控制价各组成部分的详细内容",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},1109688,"若采用可调总价合同，在合同执行过程中，（ ）发生变化时，可对合同总价进行相应的调整。",[167,169,171,173],{"key":20,"text":168,"correct":22},"施工设备",{"key":24,"text":170,"correct":29},"工料价格指数",{"key":27,"text":172,"correct":22},"施工顺序",{"key":31,"text":174,"correct":22},"施工方法",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1109689,"在招标控制价编制中，下列有关工程量清单概念的说法，错误的是（）",[179,181,183,185],{"key":20,"text":180,"correct":29},"已标价工程量清单构成招标文件的组成部分",{"key":24,"text":182,"correct":22},"招标工程量清单是随招标文件发布供投标报价的工程量清单",{"key":27,"text":184,"correct":22},"非国有资金投资的工程建设项目，业主自主确定是否采用工程量清单方式计价",{"key":31,"text":186,"correct":22},"工程量清单适用于索赔与现场签证的计算",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},1109690,"对于非国有资金投资的工程建设项目，是否采用工程量清单方式计价由（）确定。",[191,193,195,197],{"key":20,"text":192,"correct":29},"项目业主自主",{"key":24,"text":194,"correct":22},"监理单位",{"key":27,"text":196,"correct":22},"国家行政部门",{"key":31,"text":198,"correct":22},"施工单位",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},1109691,"就承包商而言，下列选项中，适宜利用固定总价合同情况的是（）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"工程范围清楚明确，工程图纸完整、详细、清楚，报价的工程量为估计数字",{"key":24,"text":206,"correct":22},"工程量小、工期短，在工程过程中环境因素变化大",{"key":27,"text":208,"correct":22},"工程结构、技术简单，风险较大，报价估算方便",{"key":31,"text":210,"correct":29},"投标期相对宽裕，承包商可以详细做现场调查，复核工程量，分析招标文件，拟定计划",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":27,"analysis":33},1109692,"可以促使承包方关心和降低成本，缩短工期，而且成本可以随设计的进展而加以调整，实际工程中应用较多的合同计价方式是（）。",[215,216,217,218],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":219,"correct":22},"成本加固定最大酬金",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":27,"analysis":33},1109693,"下列关于工程量清单编制的说法，错误的是（）。",[224,226,228,230],{"key":20,"text":225,"correct":22},"采用工程量清单方式招标的，招标工程量清单的准确性和完整性由招标人负责",{"key":24,"text":227,"correct":22},"拟定的招标文件应作为工程量清单编制的依据",{"key":27,"text":229,"correct":29},"施工现场情况、工程特点及专项施工方案应作为工程量清单编制的依据",{"key":31,"text":231,"correct":22},"工程量清单的组成中包括规费和税金清单",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":27,"analysis":33},1109694,"当招标人仅要求总包人对其发包的专业工程进行现场协调和统一管理、对竣工资料进行统一汇总整理等服务时，总包服务费按（）计算。",[236,238,240,242],{"key":20,"text":237,"correct":22},"总承包工程估算造价的5％左右",{"key":24,"text":239,"correct":22},"发包的专业工程估算造价的3％左右",{"key":27,"text":241,"correct":29},"发包的专业工程估算造价的1.5％左右",{"key":31,"text":243,"correct":22},"总承包工程估算造价的1.5％左右",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},1109695,"根据《建设工程工程量清单计价规范》，我国进度款支付比例最高不超过（）。",[248,250,252,254],{"key":20,"text":249,"correct":29},"90％",{"key":24,"text":251,"correct":22},"80％",{"key":27,"text":253,"correct":22},"30％",{"key":31,"text":255,"correct":22},"10％",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":31,"analysis":33},1109696,"下列关于招标控制价确定方法的说法中，符合《建设工程工程量清单计价规范》GB 50500—2013规定的是（）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"措施项目费中的安全文明施工费根据施工技术方案计价",{"key":24,"text":263,"correct":22},"措施项目费以项为单位计价的，价格包括除利润、税金以外的全部费用",{"key":27,"text":265,"correct":22},"总承包服务费由发承包双方协商确定",{"key":31,"text":267,"correct":29},"税金应按国家或省级、行业建设主管部门规定的标准计算",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":20,"analysis":33},1109697,"下列费用中，不应列入总价措施项目清单的是（）。",[272,274,276,278],{"key":20,"text":273,"correct":29},"专业工程暂估价",{"key":24,"text":275,"correct":22},"安全文明施工费",{"key":27,"text":277,"correct":22},"二次搬运费",{"key":31,"text":279,"correct":22},"夜间施工增加费",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":31,"analysis":33},1109698,"一般而言，采用固定总价合同时，承包商的投标报价较高的原因是（）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"承包商丧失了今后一切的索赔权利",{"key":24,"text":287,"correct":22},"业主今后工程款结算的工作量减少而给予承包商的费用补偿",{"key":27,"text":289,"correct":22},"业主今后可以增加工程范围和内容而不给予承包商另外的费用补偿",{"key":31,"text":291,"correct":29},"承包商会将工程量及一切不可预见因素的风险补偿加到投标报价中",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":27,"analysis":33},1109699,"发包方只给出发包工程的有关分部分项工程以及工程范围，承包方填报相应的价格，最后按实际完成的工程数量进行结算，这种合同计价方式指的是（）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"可调单价合同",{"key":24,"text":299,"correct":22},"估算工程量单价合同",{"key":27,"text":301,"correct":29},"纯单价合同",{"key":31,"text":303,"correct":22},"固定价合同",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":31,"analysis":33},1109700,"采用“最高限额成本加固定最大酬金合同”方式，若承包方要获得成本、酬金的支付以及分享节约额，则必须是（）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"实际成本在预期成本和报价成本之间",{"key":24,"text":311,"correct":22},"实际工程成本在报价成本和限额成本之间",{"key":27,"text":313,"correct":22},"实际工程成本超过限额成本",{"key":31,"text":315,"correct":29},"实际成本低于预期成本",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},1109701,"对于灾后恢复工程，适合采用（）。",[320,322,323,324],{"key":20,"text":321,"correct":22},"可调总价合同",{"key":24,"text":301,"correct":22},{"key":27,"text":297,"correct":22},{"key":31,"text":325,"correct":29},"成本加酬金合同",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},1109702,"根据现行规定，工程质量保证金一般是合同价款的（）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"3％",{"key":24,"text":333,"correct":22},"5％",{"key":27,"text":335,"correct":29},"3％～5％",{"key":31,"text":255,"correct":22},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},1109703,"( ) 是解决合同争执的最基本、最常见和最有效的方法。",[341,343,345,347],{"key":20,"text":342,"correct":29},"协商",{"key":24,"text":344,"correct":22},"调解",{"key":27,"text":346,"correct":22},"仲裁",{"key":31,"text":348,"correct":22},"诉讼",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":31,"analysis":33},1109704,"根据《建设工程工程量清单计价规范》的规定，( )不包括在分部分项工程量清单中。",[353,355,357,359],{"key":20,"text":354,"correct":22},"项目编码",{"key":24,"text":356,"correct":22},"项目名称",{"key":27,"text":358,"correct":22},"工程量",{"key":31,"text":360,"correct":29},"综合单价",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":31,"analysis":33},1109705,"在工程量清单计价模式下，关于确定分部分项工程项目综合单价的说法，正确的是 ( )。",[365,367,369,371],{"key":20,"text":366,"correct":22},"若分部分项工程量清单项目特征的描述与设计图纸不符，投标人应按设计图纸确定综合单价",{"key":24,"text":368,"correct":22},"综合单价中不需考虑招标文件中要求投标人承担的风险费用",{"key":27,"text":370,"correct":22},"综合单价中应考虑招标人和投标人承担的所有风险费用",{"key":31,"text":372,"correct":29},"招标工程量清单中提供了暂估单价的材料，按暂估的单价进入综合单价",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1109706,"为了得到工程施工的承包资格，需按招标文件的要求进行报价，投标价格是（）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"招标人的期望价格",{"key":24,"text":380,"correct":29},"投标人的期望价格",{"key":27,"text":382,"correct":22},"招标工程社会平均水平的建造价格",{"key":31,"text":384,"correct":22},"投标人的成本价格",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":20,"analysis":33},1109707,"下列关于合同价款约定的一般规定说法错误的是 ( )。",[389,391,393,395],{"key":20,"text":390,"correct":29},"实行招标的工程合同价款应在中标通知书发出之日起28天内，由发承包双方依据招标文件和中标人的投标文件在书面合同中约定",{"key":24,"text":392,"correct":22},"招标文件与中标人投标文件不一致的地方应以投标文件为准",{"key":27,"text":394,"correct":22},"紧急抢险、救灾以及施工技术特别复杂的建设工程可采用成本加酬金合同",{"key":31,"text":96,"correct":22},{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":31,"analysis":33},1109708,"下列关于招标文件中分部分项工程量清单的说法中，正确的是( )。",[400,402,404,406],{"key":20,"text":401,"correct":22},"清单为可调整的开口清单",{"key":24,"text":403,"correct":22},"投标人不必对清单项目逐一计价",{"key":27,"text":405,"correct":22},"投标人可以根据具体情况对清单的列项进行变更或增减",{"key":31,"text":407,"correct":29},"投标人不得对清单中内容不妥或遗漏的部分进行修改",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},1109709,"采用工程量清单方式招标时，由( )负责工程量清单的准确性和完整性。",[412,414,416,418],{"key":20,"text":413,"correct":29},"招标人",{"key":24,"text":415,"correct":22},"投标人",{"key":27,"text":417,"correct":22},"评标委员会",{"key":31,"text":194,"correct":22},{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1109710,"分部分项工程量清单项目编码设为五级，其中第三级表示的是( )顺序码。",[423,425,427,429],{"key":20,"text":424,"correct":22},"专业工程",{"key":24,"text":426,"correct":29},"分部工程",{"key":27,"text":428,"correct":22},"分项工程",{"key":31,"text":430,"correct":22},"工程量清单",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},1109711,"下列选项中，可调总价合同的风险分担方式为（）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"承包方承担通货膨胀风险，发包方承担其他风险",{"key":24,"text":438,"correct":29},"发包方承担通货膨胀风险，承包方承担其他风险",{"key":27,"text":440,"correct":22},"承包方承担一切风险",{"key":31,"text":442,"correct":22},"发包方承担一切风险",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},1109712,"关于投标报价与招标控制价的说法，正确的是( )。",[447,449,451,453],{"key":20,"text":448,"correct":22},"两者均为期望价格",{"key":24,"text":450,"correct":29},"投标报价高于招标控制价的应予废标",{"key":27,"text":452,"correct":22},"招标控制价是投标报价的成本价",{"key":31,"text":454,"correct":22},"开标时招标控制价可根据投标报价上下浮动",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":27,"analysis":33},1109713,"在纯单价合同中工程结算时的工程量应以招标人或由其授权委托的监理工程师核准的（）为依据。",[459,461,463,465],{"key":20,"text":460,"correct":22},"清单中的工程量",{"key":24,"text":462,"correct":22},"预算工程量",{"key":27,"text":464,"correct":29},"实际完成量",{"key":31,"text":466,"correct":22},"计划完成量",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":31,"analysis":33},1109714,"下列关于分部分项工程项目清单的描述，正确的是（）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"分部分项工程量清单为可以调整的开口清单",{"key":24,"text":474,"correct":22},"项目编码的第二级为附录分类顺序码，即三至五位",{"key":27,"text":476,"correct":22},"项目特征描述不可直接采用参见××图集的方式",{"key":31,"text":478,"correct":29},"计量单位的确定应结合拟建工程实际情况",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1109715,"根据《建设工程工程量清单计价规范》GB 50500—2013的规定，项目编码中的第二级顺序码指的是（）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"专业工程码",{"key":24,"text":486,"correct":29},"附录分类顺序码",{"key":27,"text":488,"correct":22},"分部工程顺序码",{"key":31,"text":490,"correct":22},"分项工程项目名称顺序码",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},1109716,"由承包方承担实物工程量、工程单价等变化而可能造成损失的风险的合同是（）。",[495,496,498,499],{"key":20,"text":299,"correct":22},{"key":24,"text":497,"correct":29},"固定总价合同",{"key":27,"text":301,"correct":22},{"key":31,"text":325,"correct":22},{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1109717,"（ ）计价方式以工程量清单和工程单价表为基础和依据来计算合同价格。较为合理地分担了合同履行中的风险。",[504,505,507,509],{"key":20,"text":84,"correct":22},{"key":24,"text":506,"correct":29},"估算工程量单价",{"key":27,"text":508,"correct":22},"纯单价",{"key":31,"text":510,"correct":22},"可调单价",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},1109718,"根据《建设工程工程量清单计价规范》（GB50500－2013），关于工程量清单编制的说法，正确的是（）?",[515,517,519,521],{"key":20,"text":516,"correct":29},"同一招标工程的项目编码不能重复",{"key":24,"text":518,"correct":22},"措施项目都应该以“项”为计量单位",{"key":27,"text":520,"correct":22},"所有清单项目的工程量都应以实际施工的工程量为准",{"key":31,"text":522,"correct":22},"暂估价是用于施工中可能发生工程变更时的工程价款调整的费用",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":31,"analysis":33},1109719,"根据《建设工程工程量清单计价规范》，下列不属于分部分项工程量清单应记录内容的是（ ）。",[527,528,529,531],{"key":20,"text":354,"correct":22},{"key":24,"text":356,"correct":22},{"key":27,"text":530,"correct":22},"项目特征",{"key":31,"text":532,"correct":29},"计算过程",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},1109720,"根据《建设工程量清单计价规范》（GB50500－2013）编制的工程量清单中，某分部分项工程的项目编码010302004005，则“01”的含义是（）。",[537,539,540,541],{"key":20,"text":538,"correct":22},"分项工程顺序码",{"key":24,"text":488,"correct":22},{"key":27,"text":484,"correct":29},{"key":31,"text":486,"correct":22},{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":27,"analysis":33},1109721,"某招标工程按《建设工程工程量清单计价规范》(GB50500—2003)编制工程量清单，其中分部分项工程量清单的项目编码十至十二位应( )。",[546,548,550,552],{"key":20,"text":547,"correct":22},"按附录的规定设置",{"key":24,"text":549,"correct":22},"按规定的统一项目编码编制",{"key":27,"text":551,"correct":29},"由清单编制人设置",{"key":31,"text":553,"correct":22},"由投标人自001起顺序编制",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":27,"analysis":33},1109722,"（2015年真题）采用估算工程量单价合同时，最后的工程结算总价是按（ ）计算确定的。",[558,560,562,564],{"key":20,"text":559,"correct":22},"发包人提供的估计工程量及承包人所填报的单价",{"key":24,"text":561,"correct":22},"发包人提供的估计工程量及承包人实际发生的单价",{"key":27,"text":563,"correct":29},"实际完成的工程量及承包人所填报的单价",{"key":31,"text":565,"correct":22},"实际完成的工程量及承包人实际发生的单价",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},1109723,"（2015年真题）下列成本加酬金合同计价形式中，最难以控制成本的是（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":29},"成本加固定百分比酬金合同",{"key":24,"text":573,"correct":22},"成本加固定金额酬金合同",{"key":27,"text":575,"correct":22},"成本加奖罚合同",{"key":31,"text":32,"correct":22},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":31,"analysis":33},1109724,"（2017年真题）采用固定总价合同时，发包方承担的风险是（ ）。",[581,582,583,584],{"key":20,"text":60,"correct":22},{"key":24,"text":62,"correct":22},{"key":27,"text":64,"correct":22},{"key":31,"text":66,"correct":29},{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":27,"analysis":33},1109725,"（2018年真题）根据《建设工程工程量清单计价规范》，分部分项工程项目清单中的分项工程项目名称顺序码的数位是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"三至四位",{"key":24,"text":592,"correct":22},"五至六位",{"key":27,"text":594,"correct":29},"七至九位",{"key":31,"text":596,"correct":22},"十至十二位",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]