[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-44":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,44,50,2641,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,271,282,294,306,318,330,342,354,366,375,387,399,411,423,435,447,459,471,483,494,506,517,529,541,553,563,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1109592,1,"单选题","某项目计划工作预算投资为50万元，已完工作实际投资为65万元，已完工作预算投资60万元，则进度偏差为（ ）万元。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","15",false,{"key":24,"text":25,"correct":22},"B","5",{"key":27,"text":28,"correct":22},"C","-5",{"key":30,"text":31,"correct":32},"D","10",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1109593,"某工程基准日期的价格为1500万元。调值公式中的固定系数为0．4，若相关成本要素中，水泥的价格指数上升了20％，水泥的费用占合同调值部分的40％，其他成本要素的价格均未发生变化。则调整的合同价的差额为（ ）万元。",[38,40,42,44],{"key":20,"text":39,"correct":32},"72",{"key":24,"text":41,"correct":22},"84",{"key":27,"text":43,"correct":22},"120",{"key":30,"text":45,"correct":22},"1572",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1109594,"《建设工程工程量清单计价规范》GB50500—2013对计日工生效计价的原则做出了规定：任一计日工项目持续进行时，承包人应在该项工作实施结束后的（）内向发包人提交有计日工记录汇总的现场签证报告一式三份。",[50,52,54,56],{"key":20,"text":51,"correct":22},"12h",{"key":24,"text":53,"correct":32},"24h",{"key":27,"text":55,"correct":22},"36h",{"key":30,"text":57,"correct":22},"48h",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1109595,"按基准日期的价格计算工程进度款为200万元，合同支付中不能调值的部分占合同总价的20%；相关成本要素除水泥价格上涨15%外，其余均未发生变化，水泥费用在合同总价中所占的比重系数为0.3。按调值公式计算实际工程结算款应为（）万元。",[62,64,66,68],{"key":20,"text":63,"correct":22},"200",{"key":24,"text":65,"correct":22},"207.2",{"key":27,"text":67,"correct":32},"209",{"key":30,"text":69,"correct":22},"230",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1109596,"采用清单计价的分部分项工程，招标控制价的综合单价为320元，投标报价的综合单价为265元，该工程投标报价下浮率为5%，结算时，该分项工程工程量比清单量增加了18%，且合同未确定综合单价调整方法，则综合单价的处理方法是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"上浮18%",{"key":24,"text":77,"correct":22},"下调5%",{"key":27,"text":79,"correct":22},"调整为292.5%",{"key":30,"text":81,"correct":32},"可不调整",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1109597,"根据《建设工程工程量清单计价规范》（GB50500－2013），因不可抗力事件导致的损害及其费用增加，应由承包人承担的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工程本身的损害",{"key":24,"text":89,"correct":32},"承包人的施工机械损坏",{"key":27,"text":91,"correct":22},"发包方现场的人员伤亡",{"key":30,"text":93,"correct":22},"工程所需的修复费用",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1109598,"某工程施工至2013年12月底，经分析，已完工作预算投资为100万元，已完工作实际投资为115万元，计划工作预算投资为110万元。则该工程的进度偏差为（）。?",[98,100,102,104],{"key":20,"text":99,"correct":22},"超前15万元",{"key":24,"text":101,"correct":22},"延误15万元",{"key":27,"text":103,"correct":22},"超前10万元",{"key":30,"text":105,"correct":32},"延误10万元",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1109599,"某工程原定2013年9月20日竣工，因承包人原因致使工程延至2013年10月20日竣工。但在2013年10月因法规的变化导致工程造价减少50万元，工程合同价款应（）。",[110,112,114,116],{"key":20,"text":111,"correct":32},"调减50万元",{"key":24,"text":113,"correct":22},"调减20万元",{"key":27,"text":115,"correct":22},"调增50万元",{"key":30,"text":117,"correct":22},"不予调整",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},1109600,"下列关于安全文明施工费的说法中，叙述正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"发包人应在工程开工后的28天内预付不低于当年施工进度计划的安全文明施工费总额的50％",{"key":24,"text":125,"correct":22},"发包人在付款期满后的7天内仍未支付的，若发生安全事故，承包人应承担全部责任",{"key":27,"text":127,"correct":22},"承包人对安全文明施工费应专款专用.在财务账目中单独列项备查，可挪作他用",{"key":30,"text":129,"correct":32},"发包人没有按时支付安全文明施工费的，承包人可催告发包人支付",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1109601,"下列关于竣工结算编制说法正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"措施项目中的单价项目如发生调整的按已标价工程量清单的综合单价计算",{"key":24,"text":137,"correct":22},"安全文明施工费由施工单位根据自身施工水平计算",{"key":27,"text":139,"correct":32},"措施项目中的总价项目应依据已标价工程量清单的项目和金额计算",{"key":30,"text":141,"correct":22},"分部分项工程中的单价项目如发生调整的按已标价工程量清单的综合单价计算",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1109602,"下列关于赢得值法说法正确的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"已完工作预算投资(BCWP)=计划工作量×预算单价",{"key":24,"text":149,"correct":22},"计划工作预算投资(BCWS)=已完成工作量×预算单价",{"key":27,"text":151,"correct":32},"已完工作实际投资(ACWP)=已完成工作量×实际单价",{"key":30,"text":153,"correct":22},"投资偏差(CV)=已完工作实际投资(ACWP)-已完工作预算投资(BCWP)",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1109603,"在FIDIC施工合同下，发包人终止合同，承包商有权索赔（）。?",[158,160,162,164],{"key":20,"text":159,"correct":32},"费用，利润但不包括工期",{"key":24,"text":161,"correct":22},"工期、费用，但不包括利润",{"key":27,"text":163,"correct":22},"工期，但不包括费用",{"key":30,"text":165,"correct":22},"工期、费用和利润",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1109604,"（2015年真题） 2015年3月实际完成的某土方工程，按2014年3月签约时的价格计算的工程价款为2000万元，该工程的定值权重为0.2，各调值因子除人工费的价格指数增长了10%外均未发生变化，人工费占调值部分的50%。按调值公式法计算，该土方工程需调整的价格差额为（ ）万元。",[170,172,174,176],{"key":20,"text":171,"correct":22},"20",{"key":24,"text":173,"correct":22},"40",{"key":27,"text":175,"correct":32},"80",{"key":30,"text":177,"correct":22},"100",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1109605,"（2015年真题）计量填筑路堤土方宜采用的方法是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"均摊法",{"key":24,"text":185,"correct":22},"凭据法",{"key":27,"text":187,"correct":32},"断面法",{"key":30,"text":189,"correct":22},"估价法",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1109606,"（2015年真题）某工程基础底板的设计厚度为1m，承包人根据以往的施工经验，认为该设计有问题，未经项目监理机构同意，即按1.2m厚度施工。专业监理工程师在计量时，对承包人多完成的工程量应（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"予以计量",{"key":24,"text":197,"correct":32},"不予计量",{"key":27,"text":199,"correct":22},"计量一半",{"key":30,"text":201,"correct":22},"由发包人与承包人协商处理",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1109607,"（2015年真题）由于发包人责任造成承包人自有机械设备窝工，其索赔费按（ ）计算。",[206,208,210,212],{"key":20,"text":207,"correct":22},"台班单价",{"key":24,"text":209,"correct":32},"台班折旧费",{"key":27,"text":211,"correct":22},"台班租赁费",{"key":30,"text":213,"correct":22},"折算租金",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},1109608,"（2016年真题）关于赢得值法及其应用的说法，正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"赢得值法有四个基本参数和三个评价指标",{"key":24,"text":221,"correct":22},"投资（进度）绩效指数反映的是绝对偏差",{"key":27,"text":223,"correct":32},"投资（进度）偏差仅适合对同一项目作偏差分析",{"key":30,"text":225,"correct":22},"进度偏差为正值，表示进度延误",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1109609,"（2016年真题）将项目总投资按单项工程及单位工程等分解编制而成的资金使用计划称为按（ ）分解的资金使用计划。",[230,232,234,236],{"key":20,"text":231,"correct":22},"投资构成",{"key":24,"text":233,"correct":32},"子项目",{"key":27,"text":235,"correct":22},"时间进度",{"key":30,"text":237,"correct":22},"专业工程",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1109610,"（2016年真题）某工程采用的预拌混凝土由承包人提供，双方约定承包人承担的价格风险系数≤5%，承包人投标时对预拌混凝土的投标报价为308元\u002Fm3，招标人的基准价格为310元\u002Fm3，实际采购价为327元\u002Fm3，发包人在结算时确认的单价应为（ ）元\u002Fm3。",[242,244,246,248],{"key":20,"text":243,"correct":22},"308.00",{"key":24,"text":245,"correct":32},"309.50",{"key":27,"text":247,"correct":22},"310.00",{"key":30,"text":249,"correct":22},"327.00",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":30,"analysis":33},1109611,"（2016年真题）下列事件中，需要进行现场签证的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"合同范围以内零星工程的确认",{"key":24,"text":257,"correct":22},"修改施工方案引起工程量增减的确认",{"key":27,"text":259,"correct":22},"承包人原因导致设备窝工损失的确认",{"key":30,"text":261,"correct":32},"合同范围以外新增工程的确认",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1109612,"（2018年真题）建筑工程险保险费项目一般按（ ）进行计量支付。",[266,267,268,269],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":32},{"key":27,"text":189,"correct":22},{"key":30,"text":270,"correct":22},"分解计量法",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},1109613,"（2018年真题）某工程施工至2018年3月底，经统计分析：已完工作预算投资580万元，已完工作实际投资570万元，计划工作预算投资600万元，该工程此时的进度偏差为（ ）万元。",[275,277,279,281],{"key":20,"text":276,"correct":22},"-30",{"key":24,"text":278,"correct":32},"-20",{"key":27,"text":280,"correct":22},"-10",{"key":30,"text":31,"correct":22},{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":27,"analysis":33},1109614,"（2018年真题）某混凝土工程招标工程量为900m3，综合单价为350元\u002Fm3。在施工过程中由于设计变更导致实际完成工程量为1150m3。合同约定：当实际完成工程量增加超过15%时，超出部分的综合单价要调低，调价系数为0.9。该混凝土工程实际结算工程款为（ ）万元。",[286,288,290,292],{"key":20,"text":287,"correct":22},"36.2250",{"key":24,"text":289,"correct":22},"39.3750",{"key":27,"text":291,"correct":32},"39.8475",{"key":30,"text":293,"correct":22},"40.2500",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":30,"analysis":33},1109615,"（2019年真题）承包人在施工中遇到了一个有经验的承包人也难以预测的不利物质条件，导致承包人成本增加和工期延误，则承包人可索赔（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"增加的成本、延误的工期和相应利润",{"key":24,"text":301,"correct":22},"延误的工期，不能索赔增加的成本和相应利润",{"key":27,"text":303,"correct":22},"增加的成本，不能索赔延误的工期和相应利润",{"key":30,"text":305,"correct":32},"增加的成本和延误的工期，不能索赔相应利润",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},1109616,"（2019年真题）根据《建设工程工程量清单计价规范》，当承包人投标报价中材料单价低于基准单价时，施工期间材料单价跌幅以（ ）为基础，超过合同约定的风险幅度值时，其超过部分按实调整。",[310,312,314,316],{"key":20,"text":311,"correct":22},"基准单价",{"key":24,"text":313,"correct":32},"投标报价",{"key":27,"text":315,"correct":22},"定额单价",{"key":30,"text":317,"correct":22},"投标控制价",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1109617,"（2019年真题）根据《建设工程施工合同（示范文本）》，监理人应在收到承包人提交的工程量报告后（ ）天内完成对承包人提交的工程量报表的审核并报送发包人。",[322,324,326,328],{"key":20,"text":323,"correct":32},"7",{"key":24,"text":325,"correct":22},"14",{"key":27,"text":327,"correct":22},"21",{"key":30,"text":329,"correct":22},"28",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1109618,"（2019年真题）某工程在施工过程中，因不可抗力造成如下损失：（1）在建工程损失10万元；（2）承包人受伤人员医药费和补偿金2万元；（3）施工机具损坏损失1万元；（4）工程清理和修复费用0.5万元。承包人及时向项目监理机构提出了索赔申请，共索赔13.5万元。根据《建设工程工程量清单计价规范》，项目监理机构应批准的索赔金额为（ ）万元。",[334,336,338,340],{"key":20,"text":335,"correct":22},"10.0",{"key":24,"text":337,"correct":32},"10.5",{"key":27,"text":339,"correct":22},"12.5",{"key":30,"text":341,"correct":22},"13.5",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":30,"analysis":33},1109619,"（2019年真题）已签约合同价中的暂列金额由（ ）负责掌握使用。",[346,348,350,352],{"key":20,"text":347,"correct":22},"承包人",{"key":24,"text":349,"correct":22},"监理人",{"key":27,"text":351,"correct":22},"贷款人",{"key":30,"text":353,"correct":32},"发包人",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},1109620,"（2020年真题）常用的索赔费用计算方法是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":32},"实际费用法",{"key":24,"text":361,"correct":22},"单价定额法",{"key":27,"text":363,"correct":22},"总费用法",{"key":30,"text":365,"correct":22},"修正的总费用法",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":27,"analysis":33},1109621,"（2020年真题）根据《建设工程施工合同（示范文本）》，除专用合同条款另有约定外，承包人向监理人报送上月20日至当月19日已完成工程量的时间为每月（ ）日。",[370,371,372,374],{"key":20,"text":171,"correct":22},{"key":24,"text":327,"correct":22},{"key":27,"text":373,"correct":32},"25",{"key":30,"text":329,"correct":22},{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},1109622,"（2020年真题）某工程施工至2020年6月底，经统计分析：已完工作预算投资2500万元，已完工作实际投资2800万元，计划工作预算投资2600万元。该工程此时的投资绩效指数为（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":32},"0.89",{"key":24,"text":382,"correct":22},"0.96",{"key":27,"text":384,"correct":22},"1.04",{"key":30,"text":386,"correct":22},"1.12",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},1109623,"（2020年真题）某工程约定采用价格指数法调整合同价款，承包人根据约定提供的数据如下表。本期完成合同价款为45万元，其中已按现行价格计算的计日工价款为5万元。本期应调整的合同价款差额为（ ）万元。",[391,393,395,397],{"key":20,"text":392,"correct":22},"-2.85",{"key":24,"text":394,"correct":22},"-2.54",{"key":27,"text":396,"correct":32},"2.77",{"key":30,"text":398,"correct":22},"3.12",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":27,"analysis":33},1109624,"（2020年真题）某土方工程，合同工程量为1万m3，合同综合单价为60元\u002Fm3，合同约定：当实际工程量增加15%以上时，超出部分的工程量综合单价应予调低，施工过程中由于发包人设计变更，实际完成工程量1.3万m3，监理人与承包人依据合同约定协商后，确定的土方工程变更单价为56元\u002Fm3。该土方工程实际结算价款为（ ）万元。",[403,405,407,409],{"key":20,"text":404,"correct":22},"72.80",{"key":24,"text":406,"correct":22},"76.80",{"key":27,"text":408,"correct":32},"77.40",{"key":30,"text":410,"correct":22},"78.00",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":30,"analysis":33},1109625,"（2020年真题）在施工过程中发现文物，导致费用增加和工期延误，承包人提出索赔，监理人处理该索赔的正确做法是（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":22},"可批复增加的费用、延误的工期和相应利润",{"key":24,"text":418,"correct":22},"可批复延误的工期，不批复增加的费用和利润",{"key":27,"text":420,"correct":22},"可批复增加的费用，不批复延误的工期和利润",{"key":30,"text":422,"correct":32},"可批复增加的费用和延误的工期，不批复利润",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":20,"analysis":33},1109632,"（）是招标人根据国家或省级、行业建设主管部门颁发的有关计价依据和办法，以及拟定的招标文件和招标工程量清单，结合工程具体情况编制的招标工程的最高投标限价。",[427,429,431,433],{"key":20,"text":428,"correct":32},"招标控制价",{"key":24,"text":430,"correct":22},"项目预算价格",{"key":27,"text":432,"correct":22},"工程标底价格",{"key":30,"text":434,"correct":22},"中标价",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},1109642,"根据《建筑工程工程量清单计价规范》（GB50500-2013），关于分部分项工程量清单中项目名称的说法，正确的是（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"《计量规范》中的项目名称是分项工程名称，以工程主要材料命名",{"key":24,"text":442,"correct":32},"编制清单时，项目名称应根据《计量规范》的项目名称综合拟建工程实际确定",{"key":27,"text":444,"correct":22},"《计量工程》中的项目名称是分部工程名称，以工程实体命名",{"key":30,"text":446,"correct":22},"编制清单时，《计量工程》中的项目名称不能变化，但应补充项目规格、材质",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},1109643,"招标人编制工程量清单时，对各专业工程现行《计量规范》中未包括的项目应作补充，则关于该补充项目及其编码的说法，正确的是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"该项目编码应由对应计量规范的代码和三位阿拉伯数字组成",{"key":24,"text":454,"correct":32},"清单编制人应将补充项目报省级或行业工程造价管理机构备案",{"key":27,"text":456,"correct":22},"清单编制人在最后一个清单项目后面自行补充该项目，不需编码",{"key":30,"text":458,"correct":22},"该项目按《计量规范》中相近或相似的清单项目编码",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":30,"analysis":33},1109644,"根据《建设工程工程量清单计价规范》，招标人委托工程造价咨询机构编制的招标工程量清单，其封面应有招标人和（ ）盖章确认。",[463,465,467,469],{"key":20,"text":464,"correct":22},"编制清单的造价员",{"key":24,"text":466,"correct":22},"造价咨询人的造价工程师",{"key":27,"text":468,"correct":22},"工程造价咨询人的法人代表",{"key":30,"text":470,"correct":32},"工程造价咨询人",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":30,"analysis":33},1109645,"关于编制招标控制价的说法，正确的是（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":22},"综合单价应包括由招标人承担的费用及风险",{"key":24,"text":478,"correct":22},"安全文明施工费按投标人的施工组织设计确定",{"key":27,"text":480,"correct":22},"措施项目费应为包括规费、税金在内的全部费用",{"key":30,"text":482,"correct":32},"暂估价中的材料单价，应按招标工程量清单的单价计入综合单价",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":27,"analysis":33},1109646,"采用工程量清单方式招标时，工程量清单的准确性和完整性应由()负责。",[487,489,491,493],{"key":20,"text":488,"correct":22},"编制清单的造价工程师",{"key":24,"text":490,"correct":22},"审核清单的造价工程师",{"key":27,"text":492,"correct":32},"工程招标人",{"key":30,"text":470,"correct":22},{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},1109647,"对招标文件提供的清单，投标人必须逐一计价且对所列内容不允许有任何更改变动的是()。",[498,500,502,504],{"key":20,"text":499,"correct":32},"分部分项工程量清单",{"key":24,"text":501,"correct":22},"措施项目清单",{"key":27,"text":503,"correct":22},"其他项目清单",{"key":30,"text":505,"correct":22},"零星工作项目表",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":30,"analysis":33},1109648,"分部分项工程量清单项目设置五级编码。其中第五级编码为()顺序码。",[510,511,513,515],{"key":20,"text":237,"correct":22},{"key":24,"text":512,"correct":22},"分部工程",{"key":27,"text":514,"correct":22},"分项工程",{"key":30,"text":516,"correct":32},"工程量清单项目",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1109649,"根据现行计量规范明确的工程量计算规则，清单项目工程量是以()为准，并以完成的净值来计算的。",[521,523,525,527],{"key":20,"text":522,"correct":22},"实际施工工程量",{"key":24,"text":524,"correct":32},"形成工程实体",{"key":27,"text":526,"correct":22},"返工工程量及其损耗",{"key":30,"text":528,"correct":22},"工程施工方案",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":30,"analysis":33},1109650,"下列关于分部分项工程量清单的说法中，正确的是()。",[533,535,537,539],{"key":20,"text":534,"correct":22},"清单为可调整的开口清单",{"key":24,"text":536,"correct":22},"投标人可以根据具体情况对清单的列项进行变更或增减",{"key":27,"text":538,"correct":22},"投标人不必对清单项目逐一计价",{"key":30,"text":540,"correct":32},"投标人不得对清单中内容不妥或遗漏的部分进行修改",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1109655,"关于投标报价与招标控制价的说法，正确的是()。",[545,547,549,551],{"key":20,"text":546,"correct":22},"两者均为期望价格",{"key":24,"text":548,"correct":32},"投标报价高于招标控制价的为废标",{"key":27,"text":550,"correct":22},"招标控制价是投标报价的成本价",{"key":30,"text":552,"correct":22},"开标时招标控制价可根据投标报价上下浮动",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},1109656,"某挖沟槽土方项目招标，工程量清单中的土方开挖工程量为200m3，投标人按施工方案计算得到的预算工程量为300m3，按企业定额该项目基价为100 元\u002Fm3，则该土方开挖的单位报价应为（)元\u002Fm3。",[557,559,560,562],{"key":20,"text":558,"correct":22},"300",{"key":24,"text":63,"correct":22},{"key":27,"text":561,"correct":32},"150",{"key":30,"text":177,"correct":22},{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},1109657,"不能促使承包商降低工程成本，甚至还可能“鼓励”承包商增大工程成本的合同形式是( )。",[567,569,571,573],{"key":20,"text":568,"correct":22},"成本加固定金额酬金合同",{"key":24,"text":570,"correct":32},"成本加固定百分比酬金合同",{"key":27,"text":572,"correct":22},"成本加奖罚合同",{"key":30,"text":574,"correct":22},"最高限额成本加固定最大酬金合同",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":30,"analysis":33},1109658,"关于建设项目单价合同特点的说法，正确的是( )。",[579,581,583,585],{"key":20,"text":580,"correct":22},"实施项目的工程性质和工程量应在事先确定",{"key":24,"text":582,"correct":22},"实际总价按工程量清单工程量与合同单价确定",{"key":27,"text":584,"correct":22},"承包方在投标报价中不需要考虑风险费用",{"key":30,"text":586,"correct":32},"实际工程价格可能大于也可能小于合同价格",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":24,"analysis":33},1109661,"下列有关合同价款的约定，描述正确的是（）。",[591,593,595,597],{"key":20,"text":592,"correct":22},"当采用估算工程量单价合同时，实际完成的工程量与原估计的工程量可以有实质性的变更",{"key":24,"text":594,"correct":32},"当采用固定总价合同时，发包人不承担工程单价变化的风险",{"key":27,"text":596,"correct":22},"当采用纯单价合同时，发包方要给出承包人有关工程量的规定",{"key":30,"text":598,"correct":22},"当采用成本加酬金合同时，可极大的鼓励承包商关心和降低成本",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":30,"analysis":33},1109664,"实行招标的工程合同价款应在中标通知书发出之日起（）内，由发承包双方依据招标文件和中标人的投标文件在书面合同中约定。",[603,605,607,609],{"key":20,"text":604,"correct":22},"5日",{"key":24,"text":606,"correct":22},"15日",{"key":27,"text":608,"correct":22},"28日",{"key":30,"text":610,"correct":32},"30日",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]