[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-43":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,43,50,2641,[13,34,46,58,70,82,92,101,113,125,137,145,157,169,181,189,201,213,225,237,249,261,272,284,296,306,318,330,342,354,366,378,390,402,414,426,435,447,459,471,483,495,507,519,531,543,555,567,579,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1109534,1,"单选题","发包人应在收到承包人进度款支付申请后的（ ）天内，根据计量结果和合同约定对申请内容予以核实，确认后向承包人出具进度款支付证书。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","7",false,{"key":24,"text":25,"correct":26},"B","14",true,{"key":28,"text":29,"correct":22},"C","28",{"key":31,"text":32,"correct":22},"D","30","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1109535,"某包工包料工程合同总金额为1000万元，工程预付款的比例为20％，主要材料、构件所占比重为50％，按起扣点基本计算公式，则工程累计完成至（ ）万元时应开始扣回工程预付款。",[38,40,42,44],{"key":20,"text":39,"correct":26},"600",{"key":24,"text":41,"correct":22},"640",{"key":28,"text":43,"correct":22},"500",{"key":31,"text":45,"correct":22},"540",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1109536,"某工程项目预付款120万元，合同约定：每月进度款按结算价的80%支付；每月支付安全文明施工费20万元；预付款从开工的第4个月起分3个月等额扣回，开工后前6个月结算价如下表，则第5个月应支付的款项为（ ）万元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"136",{"key":24,"text":53,"correct":22},"160",{"key":28,"text":55,"correct":26},"156",{"key":31,"text":57,"correct":22},"152",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1109537,"关于安全文明施工费的支付，下列说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"按施工工期平均分摊安全文明施工费，与进度款同期支付",{"key":24,"text":65,"correct":22},"按合同建筑安装工程费分摊安全文明施工费，与进度款同期支付",{"key":28,"text":67,"correct":26},"在开工后28天内预付不低于当年施工进度计划的安全文明施工费总额的60%，其余部分与进度款同期支付",{"key":31,"text":69,"correct":22},"在正式开工前预付不低于当年施工进度计划的安全文明施工费总额的60%。其余部分与进度款同期支付",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1109538,"已知某建筑工程施工合同总额为8000万元，工程预付款按合同金额的20%计取，主要材料及构件造价占合同额50%。预付款起扣点为（ ）万元。",[74,76,78,80],{"key":20,"text":75,"correct":22},"1600",{"key":24,"text":77,"correct":22},"4000",{"key":28,"text":79,"correct":26},"4800",{"key":31,"text":81,"correct":22},"6400",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1109539,"发包人在竣工结算支付证书签发后（ ）天内仍不支付工程竣工结算价款的，承包人可以与发包人协议将该工程折价变卖。",[86,88,89,90],{"key":20,"text":87,"correct":26},"56",{"key":24,"text":29,"correct":22},{"key":28,"text":25,"correct":22},{"key":31,"text":91,"correct":22},"35",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1109540,"发包人应在签发竣工结算支付证书后的( )天内，按照竣工结算支付证书列明的金额向承包人支付结算款。",[96,97,98,100],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":99,"correct":22},"21",{"key":31,"text":29,"correct":22},{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":24,"analysis":33},1109541,"根据《建设工程施工合同（示范文本）》（GF－2017－0201），工程未经竣工验收，发包人擅自使用的，保修期的起算时间为（ ）。",[105,107,109,111],{"key":20,"text":106,"correct":22},"承包人提交竣工验收申请报告之日",{"key":24,"text":108,"correct":26},"转移占有工程之日",{"key":28,"text":110,"correct":22},"监理人组织竣工初验之日",{"key":31,"text":112,"correct":22},"竣工验收合格之日",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":28,"analysis":33},1109542,"根据《建设工程质量保证金管理办法》（建质[2017]138号），质量保证金总预留比例不得高于工程价款结算总额的（ ）。",[117,119,121,123],{"key":20,"text":118,"correct":22},"1%",{"key":24,"text":120,"correct":22},"2%",{"key":28,"text":122,"correct":26},"3%",{"key":31,"text":124,"correct":22},"5%",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":31,"analysis":33},1109543,"关于工程量清单计价方式下竣工结算的编制原则，下列说法中正确的是（ ）。",[129,131,133,135],{"key":20,"text":130,"correct":22},"措施项目费按双方确认的工程量乘以已标价工程量清单的综合单价计算",{"key":24,"text":132,"correct":22},"总承包服务费按已标价工程量清单的金额计算，不应调整",{"key":28,"text":134,"correct":22},"暂列金额应减去工程价款调整的金额，余额归承包人",{"key":31,"text":136,"correct":26},"工程实施过程中发承包双方已经确认的工程计量结果和合同价款，应直接进入结算",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":24,"analysis":33},1109544,"在竣工结算阶段，除专用合同条款另有约定外，发包人应在签发竣工付款证书后的（ ）天内，完成对承包人的竣工付款。",[141,142,143,144],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":99,"correct":22},{"key":31,"text":29,"correct":22},{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},1109546,"某工程施工至2018 年3 月底，经统计分析:已完工作预算投资580 万元,已完工作实际投资570 万元,计划工作预算投资600 万元，该工程此时的进度偏差为()万元。",[149,151,153,155],{"key":20,"text":150,"correct":22},"-30",{"key":24,"text":152,"correct":26},"-20",{"key":28,"text":154,"correct":22},"-10",{"key":31,"text":156,"correct":22},"10",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":24,"analysis":33},1109547,"某工程施工至2017 年12 月底,经统计分析:已完工作作预算投资480 万元,已完工作实际投资510 万元,计划工作预算投资450 万元,该工程此时的投资绩效指数为()。",[161,163,165,167],{"key":20,"text":162,"correct":22},"0.88",{"key":24,"text":164,"correct":26},"0.94",{"key":28,"text":166,"correct":22},"1.06",{"key":31,"text":168,"correct":22},"1.07",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":28,"analysis":33},1109548,"某承包人承包某工程项目，甲乙双方签订的关于工程价款的合同内容有：⑴建筑安装工程造价660 万元，建筑材料及设备费占施工产值的比重60％；⑵工程预付款为建筑安装工程造价的20％。工程实施后，工程预付款从未施工工程尚需的主要材料及设备费相当于工程预付款数额时起扣，从每次结算工程价款中按材料和设备占施工产值的比重扣抵工程预付款，竣工前全部扣清。则该工程的预付款起扣点是（）万元。",[173,175,177,179],{"key":20,"text":174,"correct":22},"132",{"key":24,"text":176,"correct":22},"220",{"key":28,"text":178,"correct":26},"440",{"key":31,"text":180,"correct":22},"480",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":31,"analysis":33},1109549,"发包人应当开始支付不低于当年施工进度计划的安全文明施工费总额60%的期限是工程开工后的()天内。",[185,186,187,188],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":99,"correct":22},{"key":31,"text":29,"correct":26},{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":31,"analysis":33},1109550,"根据《建设工程工程量清单计价规范》，发包人应在工程开工后的28 天内预付不低于当年施工进度计划的安全文明施工费总额的()。",[193,195,197,199],{"key":20,"text":194,"correct":22},"30%",{"key":24,"text":196,"correct":22},"40%",{"key":28,"text":198,"correct":22},"50%",{"key":31,"text":200,"correct":26},"60%",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},1109553,"下列有关赢得值法的评价指标，描述正确的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"投资偏差(SV)，SV 0，投资节支",{"key":24,"text":208,"correct":22},"进度偏差(CV)，CV 0，进度提前",{"key":28,"text":210,"correct":26},"投资绩效指标(CPI)，CPI 1，投资节支",{"key":31,"text":212,"correct":22},"进度绩效指标(SPI)，SPI 1，进度延误",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1109559,"某分项工程月计划完成工程量为3200m2，计划单价为15元\u002Fm2，月底承包商实际完成工程量为2800m2，实际单价为20元\u002Fm2，则该工程当月的计划工作预算投资（BCWS）为（ ）元。",[217,219,221,223],{"key":20,"text":218,"correct":22},"42000",{"key":24,"text":220,"correct":26},"48000",{"key":28,"text":222,"correct":22},"56000",{"key":31,"text":224,"correct":22},"64000",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},1109560,"某施工企业进行土方开挖工程，按合同约定3月份的计划工作量为2400ｍ3，计划单价是12元\u002Fｍ3；到月底检查时，确认承包商完成的工程量为2000ｍ3，实际单价为15元\u002Fｍ3 。则该工程的进度偏差（SV）和进度绩效指数（SPI）分别为（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"0.6万元；0.80",{"key":24,"text":232,"correct":22},"-0.6万元；0.83",{"key":28,"text":234,"correct":26},"-0.48万元；0.83",{"key":31,"text":236,"correct":22},"0.48万元；0.80",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},1109561,"投资偏差结果为正，进度偏差为负表示( )。",[241,243,245,247],{"key":20,"text":242,"correct":26},"投资节约，进度延误",{"key":24,"text":244,"correct":22},"投资节约，进度提前",{"key":28,"text":246,"correct":22},"投资超支，进度延误",{"key":31,"text":248,"correct":22},"投资超支，进度提前",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},1109562,"根据《标准施工招标文件》的条款，下列索赔事件中，可以索赔利润的是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"承包人遇到不利物质条件",{"key":24,"text":256,"correct":22},"承包人遇到异常恶劣的气候条件",{"key":28,"text":258,"correct":26},"发包人原因导致的工程缺陷和损失",{"key":31,"text":260,"correct":22},"承包人遇到不可抗力",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1109563,"某包工包料工程合同总金额为1000万元，工程预付款的比例为20%，主要材料构件所占比重为50%，按起扣点基本计算工程，则工程累计完成至( )万元时应开始扣回工程预付款。",[265,267,268,270],{"key":20,"text":266,"correct":22},"200",{"key":24,"text":39,"correct":26},{"key":28,"text":269,"correct":22},"400",{"key":31,"text":271,"correct":22},"800",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":28,"analysis":33},1109564,"某工程由于承包人原因未在约定的工期内竣工。若该工程在原约定竣工日期后继续施工，则采用价格指数调整其价格差额时，现行价格指数应采用( )。",[276,278,280,282],{"key":20,"text":277,"correct":22},"原约定竣工日期的价格指数",{"key":24,"text":279,"correct":22},"实际竣工日期的价格指数",{"key":28,"text":281,"correct":26},"原约定竣工日期和实际竣工日期价格指数中较低的一个",{"key":31,"text":283,"correct":22},"实际竣工日期前42天的价格指数",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},1109565,"在投资偏差分析中，可把进度偏差表示为（ ）与已完工作预算投资的差异。",[288,290,292,294],{"key":20,"text":289,"correct":22},"已完工作实际投资",{"key":24,"text":291,"correct":22},"计划工作实际投资",{"key":28,"text":293,"correct":22},"未完工作预算投资",{"key":31,"text":295,"correct":26},"计划工作预算投资",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},1109566,"某钢筋混凝土结构工程分项，某月份的计划单价和计划工程量分别为350元／m3和3000m3，该月份的实际单价和实际完成工程量分别为360元／m3和3200m3。利用赢得值法计算出的该月份混凝土工程的投资绩效指数(CPI)为（）。",[300,302,304,305],{"key":20,"text":301,"correct":26},"0.97",{"key":24,"text":303,"correct":22},"1.03",{"key":28,"text":166,"correct":22},{"key":31,"text":164,"correct":22},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":28,"analysis":33},1109567,"某工程基础施工中，施工人员发现大型文物古迹，因此工程暂停，承包人做了相应的保护措施，根据《标准施工招标文件》的条款，承包商有权索赔（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"费用，但不包括工期和利润",{"key":24,"text":313,"correct":22},"费用和利润，但不包括工期",{"key":28,"text":315,"correct":26},"工期和费用，但不包括利润",{"key":31,"text":317,"correct":22},"工期、费用和利润",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":28,"analysis":33},1109568,"《建设工程工程量清单计价规范》GB50500—2013对工程量清单缺项的规定叙述不正确的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"新增分部分项工程量清单项目后，引起措施项目发生变化的，应按照规范中工程变更相关规定，在承包人提交的实施方案被发包人批准后调整合同价款",{"key":24,"text":325,"correct":22},"合同履行期间，由于招标工程量清单中缺项，新增分部分项工程量清单项目的，应按照规范中工程变更相关条款确定单价，并调整合同价款",{"key":28,"text":327,"correct":26},"由于招标工程量清单中措施项目缺项，承包人应编写新增措施项目实施方案，并按此调整合同价款",{"key":31,"text":329,"correct":22},"新增分部分项工程量清单项目后，引起措施项目发生变化的，可以调整合同价款",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},1109569,"对于因异常恶劣的气候造成施工单位的施工机械损坏和人员窝工以及相应的费用索赔，监理工程师应当（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"批准相应的施工机械损坏和人员窝工费用",{"key":24,"text":337,"correct":22},"批准相应的直接工程费",{"key":28,"text":339,"correct":22},"批准相应的措施项目费",{"key":31,"text":341,"correct":26},"不予批准",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},1109570,"挣值等于( )",[346,348,350,352],{"key":20,"text":347,"correct":22},"计划工作量×实际单价",{"key":24,"text":349,"correct":22},"已完工作量×实际单价",{"key":28,"text":351,"correct":22},"计划工作量×预算单价",{"key":31,"text":353,"correct":26},"已完工作量×预算单价",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},1109571,"某施工合同约定，人员窝工补贴为15元／工日。在基础工程施工期间，因罕见暴雨导致基坑淹水而停工2天，人员窝工20个工日；在主体工程施工期间，因重大公共活动、政府通知停工2天，人员窝工30个工日。为此，承包人可向业主索赔工期和费用分别为（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"4天，750元",{"key":24,"text":361,"correct":22},"4天，450元",{"key":28,"text":363,"correct":26},"4天，0元",{"key":31,"text":365,"correct":22},"2天，0元",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},1109572,"2014年7月，某工程按基准日期价格完成的7月份工程款为1500万元。由于发生物价变化，发承包双方协议采用价格指数进行价格调整，其中工程款的定值权重为0．2，相关成本要素中，水泥的价格指数上升了20％，水泥的费用占合同调值部分的40％，其他成本要素的价格均未发生变化。2014年7月应调整的合同价的差额为（ ）万元。",[370,372,374,376],{"key":20,"text":371,"correct":26},"96",{"key":24,"text":373,"correct":22},"126",{"key":28,"text":375,"correct":22},"1596",{"key":31,"text":377,"correct":22},"1626",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":28,"analysis":33},1109573,"某分项工程招标工程量清单位数量为1000㎡，施工中由于设计变更调整为1200㎡，该分项工程招标控制价单价为300元\u002F㎡。投标报价单价为360元\u002F㎡，根据《建设工程工程量清单计价规定》，该分项工程的结算款为( )元。",[382,384,386,388],{"key":20,"text":383,"correct":22},"420000",{"key":24,"text":385,"correct":22},"429000",{"key":28,"text":387,"correct":26},"431250",{"key":31,"text":389,"correct":22},"432000",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":31,"analysis":33},1109574,"下列不属于发包人向承包人索赔的是（）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"对超额利润的索赔",{"key":24,"text":397,"correct":22},"承包人不履行的保险费用索赔",{"key":28,"text":399,"correct":22},"发包人合理终止合同或承包人不正当地放弃工程的索赔",{"key":31,"text":401,"correct":26},"加速施工费用的索赔",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":31,"analysis":33},1109575,"编制资金使用计划过程中最重要的步骤，就是项目投资( )。",[406,408,410,412],{"key":20,"text":407,"correct":22},"目标的整合",{"key":24,"text":409,"correct":22},"目标的合成",{"key":28,"text":411,"correct":22},"目标的确定",{"key":31,"text":413,"correct":26},"目标的分解",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":33},1109576,"某工程在施工过程中，因不可抗力造成在建工程损失16万元，承包方受伤人员医药费4万元，施工机具损失6万元，施工人员窝工费2万元，工程清理修复费4万元。承包人及时向项目监理机构提出索赔申请，并附有相关证明材料，则项目监理机构应批准的补偿金额为( )万元。",[418,420,422,424],{"key":20,"text":419,"correct":26},"20",{"key":24,"text":421,"correct":22},"22",{"key":28,"text":423,"correct":22},"24",{"key":31,"text":425,"correct":22},"32",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},1109577,"赢得值是指( )。",[430,431,432,434],{"key":20,"text":295,"correct":22},{"key":24,"text":289,"correct":22},{"key":28,"text":433,"correct":26},"已完工作预算投资",{"key":31,"text":291,"correct":22},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":28,"analysis":33},1109578,"某建设工程项目，承包商在施工过程中发生如下人工费：完成业主要求的合同外工作花费3万元;由于业主原因导致工效降低，使人工费增加2万元;施工机械故障造成人员窝工损失0.5万元。则承包商可索赔的人工费为( )万元。",[439,441,443,445],{"key":20,"text":440,"correct":22},"2.0",{"key":24,"text":442,"correct":22},"3.0",{"key":28,"text":444,"correct":26},"5.0",{"key":31,"text":446,"correct":22},"5.5",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},1109579,"某承包人承包某项工程项目，发承包双方的合同中约定，建安工程造价为2000万元，建筑材料及设备费占施工产值的比重60％，工程预付款为建安工程造价的20％。则该项工程的预付款和起扣点分别是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"400万元；1200万元",{"key":24,"text":454,"correct":26},"400万元；1333万元",{"key":28,"text":456,"correct":22},"400万元；800万元",{"key":31,"text":458,"correct":22},"1200万元；0万元",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":24,"analysis":33},1109580,"某工程的招标控制价为800万元，中标人的投标报价为780万元，施工图预算造价为790万元，则承包人的报价浮动率为（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":22},"0.04％",{"key":24,"text":466,"correct":26},"2.50％",{"key":28,"text":468,"correct":22},"2.88％",{"key":31,"text":470,"correct":22},"2.96％",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":28,"analysis":33},1109581,"某混凝土工程，9月份计划工作量为5000m3，预算单价为400元\u002Fm3；而9月份实际完成工作量为4000m3，实际单价为450元\u002Fm3，则该工程9月份的进度绩效指数为( )万元。",[475,477,479,481],{"key":20,"text":476,"correct":22},"1.125",{"key":24,"text":478,"correct":22},"0.89",{"key":28,"text":480,"correct":26},"0.8",{"key":31,"text":482,"correct":22},"1.25",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},1109582,"为了解决一些包干项目或较大工程项目的支付时间过长、影响承包商的资金流动等问题，在工程计量时可以采用（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"估价法",{"key":24,"text":490,"correct":26},"分解计量法",{"key":28,"text":492,"correct":22},"均摊法",{"key":31,"text":494,"correct":22},"图纸法",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},1109583,"一般而言，在不影响施工总工期的前提下，有利于节约发包人的建设资金贷款利息的工作安排方式是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"所有工作均按最早开始时间安排",{"key":24,"text":502,"correct":26},"所有工作均按最迟开始时间安排",{"key":28,"text":504,"correct":22},"早期工作按最早时间安排，后期工作按最迟时间安排",{"key":31,"text":506,"correct":22},"早期工作按最迟时间安排，后期工作按最早时间安排",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":28,"analysis":33},1109584,"单价合同计量中，监理人应在收到承包人提交的工程量报告后（）内完成对承包人提交的工程量报表的审核并报送发包人，以确定当月实际完成的工程量。",[511,513,515,517],{"key":20,"text":512,"correct":22},"24h",{"key":24,"text":514,"correct":22},"3天",{"key":28,"text":516,"correct":26},"7天",{"key":31,"text":518,"correct":22},"14天",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":28,"analysis":33},1109585,"根据《建设工程工程量清单计价规范》，当承包人投标报价中材料单价低于基准单价时，施工期间材料单价涨幅以( )为基础，超过合同规定的风险幅度值的，其超过部分按实调整。",[523,525,527,529],{"key":20,"text":524,"correct":22},"投标报价",{"key":24,"text":526,"correct":22},"招标控制价",{"key":28,"text":528,"correct":26},"基准单价",{"key":31,"text":530,"correct":22},"实际单价",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":20,"analysis":33},1109586,"某工程在施工过程中，因不可抗力造成损失。承包人及时向项目监理机构提出了索赔申请，并附有相关证明材料，其中在建工程损失30万元，承包人施工机械损失10万元，承包人施工人员窝工损失3．5万元，故监理机构应批准的补偿金额是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":26},"30万元",{"key":24,"text":538,"correct":22},"33.5万元",{"key":28,"text":540,"correct":22},"40万元",{"key":31,"text":542,"correct":22},"43.5万元",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":28,"analysis":33},1109587,"工程预付款是建设工程施工合同订立后由发包人按照合同约定，在正式开工前预先支付给承包人的（）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"措施费",{"key":24,"text":550,"correct":22},"垫付资金",{"key":28,"text":552,"correct":26},"工程款",{"key":31,"text":554,"correct":22},"定金",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},1109588,"某混凝土结构工程，工程量清单中估计工程量为50000m3，合同规定混凝土结构工程综合单价为600元／m3，并且当实际工程量超过估计工程量15％时，超过部分应调整单价，单价调为550元／m3。工程结束时承包人实际完成混凝土结构工程量为65000 m3，则该项工程结算款为（）万元。",[559,561,563,565],{"key":20,"text":560,"correct":26},"3862.5",{"key":24,"text":562,"correct":22},"3850",{"key":28,"text":564,"correct":22},"3737.5",{"key":31,"text":566,"correct":22},"3575",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},1109589,"施工过程中，工程量清单项目的增减变化必然带来合同价款的增减变化，下列不属于工程量清单缺项原因的是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"施工条件改变",{"key":24,"text":574,"correct":26},"施工组织设计编写错误",{"key":28,"text":576,"correct":22},"工程量清单编制错误",{"key":31,"text":578,"correct":22},"设计变更",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},1109590,"对涉及工程设计文件修改的工程变更，应由（ ）转交原设计单位修改工程设计文件。",[583,585,587,589],{"key":20,"text":584,"correct":22},"承包人",{"key":24,"text":586,"correct":26},"发包人",{"key":28,"text":588,"correct":22},"质量监督机构",{"key":31,"text":590,"correct":22},"监理工程师",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":28,"analysis":33},1109591,"某工程受异常大雪影响，导致承包商工期延长，根据《标准施工招标文件》的条款，承包商有权要求的索赔是（ ）。",[595,597,599,601],{"key":20,"text":596,"correct":22},"费用，但不包括工期",{"key":24,"text":598,"correct":22},"工期、费用，但不包括利润",{"key":28,"text":600,"correct":26},"工期，但不包括费用",{"key":31,"text":317,"correct":22},[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]