[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-42":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,42,50,2641,[13,34,46,58,70,82,94,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,427,439,451,463,475,483,495,507,519,531,543,555,563,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1109456,1,"单选题","编制按时间进度的资金使用计划，通常可以利用控制项目进度的（ ）进一步扩充而得。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","投资总概算",false,{"key":24,"text":25,"correct":26},"B","网络图",true,{"key":28,"text":29,"correct":22},"C","施工组织设计",{"key":31,"text":32,"correct":22},"D","横道图","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1109459,"下列投资控制工作中，属于监理工程师的工作是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"确定投资目标",{"key":24,"text":41,"correct":26},"确定资金使用计划",{"key":28,"text":43,"correct":22},"结算已完工程费用",{"key":31,"text":45,"correct":22},"提出投资目标调整建议",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1109460,"将项目总投资按单项工程及单位工程等分解编制而成的资金使用计划称为按（ ）分解的资金使用计划。",[50,52,54,56],{"key":20,"text":51,"correct":22},"投资构成",{"key":24,"text":53,"correct":26},"子项目",{"key":28,"text":55,"correct":22},"时间进度",{"key":31,"text":57,"correct":22},"专业工程",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1109461,"在不影响施工总工期的前提下，有利于业主降低资金成本的工作安排方式是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"所有工作均按最早开始时间安排",{"key":24,"text":65,"correct":26},"所有工作均按最迟开始时间安排",{"key":28,"text":67,"correct":22},"早期工作按最早时间安排，后期工作按最迟时间安排",{"key":31,"text":69,"correct":22},"早期工作按最迟时间安排，后期工作按最早时间安排",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1109462,"某工程，基础底板的设计厚度为0.9m，但承包商按1.0m施工，多做的工程量在工程计量时应( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"计量一半",{"key":24,"text":77,"correct":26},"不予计量",{"key":28,"text":79,"correct":22},"按实际发生数计量",{"key":31,"text":81,"correct":22},"由业主和承包商协商处理",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1109465,"关于单价合同中工程计算的说法，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"单价合同应予计量的工程量是承包人实际施工的工程量",{"key":24,"text":89,"correct":22},"承包人因自身原因造成返工的工程量应予计量",{"key":28,"text":91,"correct":26},"工程计量应以设计图纸为依据",{"key":31,"text":93,"correct":22},"承包人为保证工程质量超过图纸要求的工程量应予计量",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1109466,"对承包人超出设计图纸范围的工程量，监理工程师应()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"经发包人同意后计量",{"key":24,"text":101,"correct":22},"与承包人协商后计量",{"key":28,"text":103,"correct":22},"在竣工结算时计量",{"key":31,"text":77,"correct":26},{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},1109467,"根据《建设工程施工合同（示范文本）》，监理人应在收到承包人提交的工程量报告后（ ）天内，完成对工程量报表的审核并报送发包人。",[109,111,113,115],{"key":20,"text":110,"correct":26},"7",{"key":24,"text":112,"correct":22},"14",{"key":28,"text":114,"correct":22},"21",{"key":31,"text":116,"correct":22},"28",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1109468,"在FIDIC 合同条件下，保养气象记录设备和维护工地清洁等项目适宜采用()进行计量支付。",[121,123,125,127],{"key":20,"text":122,"correct":26},"均摊法",{"key":24,"text":124,"correct":22},"估价法",{"key":28,"text":126,"correct":22},"分解计量法",{"key":31,"text":128,"correct":22},"凭据法",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},1109470,"已标价工程量清单中有适用于变更工程项目的，采用该项目的单价;但当工程量增加( )以上时，其增加部分的工程量的综合单价应予( )。",[133,135,137,139],{"key":20,"text":134,"correct":22},"10%调低",{"key":24,"text":136,"correct":22},"10%调高",{"key":28,"text":138,"correct":26},"15%调低",{"key":31,"text":140,"correct":22},"15%调高",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1109474,"下列合同价款调整因素的类别中，现场签证属于（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"物价变化类",{"key":24,"text":148,"correct":22},"法规变化类",{"key":28,"text":150,"correct":22},"工程变更类",{"key":31,"text":152,"correct":26},"其他类",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":28,"analysis":33},1109475,"某混凝土结构工程，工程量清单中估计工程量为3000m3，合同规定混凝土结构工程综合单价为550元／m3，实际工程量超过估计工程量15％以上时，超过部分单价下调10％，工程结束时承包人实际完成混凝土结构工程量为3300m3，则该项工程结算款为（）万元。",[157,159,161,163],{"key":20,"text":158,"correct":22},"163.4",{"key":24,"text":160,"correct":22},"165.0",{"key":28,"text":162,"correct":26},"181.5",{"key":31,"text":164,"correct":22},"199.7",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1109477,"《建设工程工程量清单计价规范》GB50500—2013对计日工生效计价的原则做出了规定：发包人在收到承包人提交现场签证报告后的（ ）内予以确认并将其中一份返还给承包人，作为计日工计价和支付的依据。",[169,171,173,175],{"key":20,"text":170,"correct":22},"1天",{"key":24,"text":172,"correct":26},"2天",{"key":28,"text":174,"correct":22},"5天",{"key":31,"text":176,"correct":22},"7天",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1109479,"某分项工程合同单价为6万元，采用价格指数进行价格调整。可调值部分占合同总价的70%，可调值部分由 A、 B、C三项成本要素构成，分别占可调值部分的20%、40%、40%，基准日期价格指数均为100，结算依据的价格指数分别为110、95、103，则结算的价款为( )万元。",[181,183,185,187],{"key":20,"text":182,"correct":22},"4.83",{"key":24,"text":184,"correct":26},"6.05",{"key":28,"text":186,"correct":22},"6.63",{"key":31,"text":188,"correct":22},"6.90",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1109483,"根据《建设工程工程量清单计价规范》（GB50500-2013），在合同履行期间，由于招标工程量清单缺项，新增了分部分项工程量清单项目，关于其合同价款确定的说法，正确的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"新增清单项目的综合单价应当由监理工程师提出",{"key":24,"text":196,"correct":26},"新增清单项目导致新增措施项目的，承包人应将新增措施项目实施方案提交发包人批准",{"key":28,"text":198,"correct":22},"新增清单项目综合单价应由承包人提出，但相关措施项目费用不能再做调整",{"key":31,"text":200,"correct":22},"新增清单项目应由额外工程处理，承包人可选择或者不做",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1109484,"某独立土方工程，根据《建设工程工程量清单计价规范》（GB50500-2013），签订了固定单价合同，招标工程量为3000m3，承包人标书中土方工程报价为55元\u002Fm3。合同约定：当实际工程量超过估计工程量15%时，超过部分工程量单价调整为50元\u002Fm3。工程结束时实际完成并经监理确认的土方工程为4500m3，则土方工程总价为（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":26},"242250",{"key":24,"text":208,"correct":22},"240000",{"key":28,"text":210,"correct":22},"247500",{"key":31,"text":212,"correct":22},"225000",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1109486,"根据《建设工程工程量清单计价规范》，某工程定额工期为25个月，合同工期为20个月。合同实施中，发包人要求该工程提前1个月竣工，征得承包人同意后，调整了合同工期。则关于该工程工期和赶工费用的说法，正确的是（ ）",[217,219,221,223],{"key":20,"text":218,"correct":22},"发包人要求合同工期比定额工期提前6个月竣工，应承担提前竣工6个月的赶工费用",{"key":24,"text":220,"correct":26},"发包人要求合同工程提前1个月竣工，应承担提前竣工1个月的赶工费用",{"key":28,"text":222,"correct":22},"发包人要求压缩的工期天数超过定额工期的20%，应承担提前竣工5个月的赶工费用",{"key":31,"text":224,"correct":22},"发包人要求压缩的工期天数未超过定额工期的30%，不支付赶工费用",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},1109487,"2010 年3 月，实际完成的某工程基准日期的价格为1500 万元。调值公式中的固定系数为0.3，相关成本要素中，水泥的价格指数上升了20%，水泥的费用占合同调值部分的40%，其它成本要素的价格均未发生变化。2010 年3 月应调整的合同价的差额为()万元。",[229,231,233,235],{"key":20,"text":230,"correct":26},"84",{"key":24,"text":232,"correct":22},"126",{"key":28,"text":234,"correct":22},"1584",{"key":31,"text":236,"correct":22},"1626",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1109488,"对于实行招标的建设工程，因法律法规政策变化引起合同价款调整的，调价基准日期一般为()。",[241,243,245,247],{"key":20,"text":242,"correct":22},"施工合同签订前的第28天",{"key":24,"text":244,"correct":26},"提交投标文件的截止时间前的第28天",{"key":28,"text":246,"correct":22},"施工合同签订前的第56天",{"key":31,"text":248,"correct":22},"提交投标文件截止时间前的第56天",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1109489,"发包人在招标工程量清单中给定某工程设备暂估价，下列关于该工程设备价款调整的说法正确的是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"依法可不招标的项目，应由发包人组织采购，以采购价格取代暂估价",{"key":24,"text":256,"correct":26},"依法可不招标的项目，应由承包人按合同约定采购，以发包人确认后的价格取代暂估价",{"key":28,"text":258,"correct":22},"依法必须招标的项目，应由发包人招标选择供应商，以中标价格取代暂估价",{"key":31,"text":260,"correct":22},"依法必须招标的项目，应由承包人招标选择供应商，以中标价格取代暂估价",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1109490,"关于施工合同履行过程中暂估价的确定，下列说法中正确的是()。",[265,267,269,271],{"key":20,"text":266,"correct":22},"不属于依法必须招标的材料，以承包人自行采购的价格取代暂估价",{"key":24,"text":268,"correct":26},"属于依法必须招标的暂估价设备，由发承包双方以招标方式选择供应商，以中标价取代暂估价",{"key":28,"text":270,"correct":22},"不属于依法必须招标的暂估价专业工程，不应按工程变更确定价款而应另行签订补充协议确定工程价款",{"key":31,"text":272,"correct":22},"属于依法必须招标的暂估价专业工程，承包人不得参加投标",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},1109491,"某独立土方工程，招标文件中估计工程量为1 万m3,合同中约定土方工程单价为20 元\u002Fm3，当实际工程量超过估计工程量10%时，需要调整单价，单价调为18 元\u002Fm3。该工程结算时实际完成土方工程量为1.2 万m3，则土方工程款为()万元。",[277,279,281,283],{"key":20,"text":278,"correct":22},"21.6",{"key":24,"text":280,"correct":22},"23.6",{"key":28,"text":282,"correct":26},"23.8",{"key":31,"text":284,"correct":22},"24.0",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1109492,"某分项工程招标工程量清单数量为4000m2，施工中由于设计变更调减为3000m2，该项目招标控制价综合单价为600元\u002Fm2，投标报价为450元\u002Fm2。合同约定实际工程量与招标工程量偏差超过±15%时，综合单价以招标控制价为基础调整。若承包人报价浮动率为10%，该分项工程费结算价为（ ）万元。",[289,291,293,295],{"key":20,"text":290,"correct":26},"137.70",{"key":24,"text":292,"correct":22},"155.25",{"key":28,"text":294,"correct":22},"186.30",{"key":31,"text":296,"correct":22},"207.00",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1109493,"某工程采用的预拌混凝土由承包人提供，双方约定承包人承担的价格风险系数",[301,303,305,307],{"key":20,"text":302,"correct":22},"308.00",{"key":24,"text":304,"correct":26},"309.49",{"key":28,"text":306,"correct":22},"310.00",{"key":31,"text":308,"correct":22},"327.00",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},1109494,"某工程原定2013 年9 月20 日竣工，因承包人原因，致使工程延至2013 年10 月20 日竣工，但在2013 年10 月因法规的变化导致工程造价增加120 万元，则工程合同款应（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"调增60万元",{"key":24,"text":316,"correct":22},"调增90万元",{"key":28,"text":318,"correct":22},"调增120万元",{"key":31,"text":320,"correct":26},"不予调增",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},1109495,"某工程在施工过程中,因不可抗力造成损失,承包人及时向项目监理机构提出了索赔申请并附有相关证明材料要求补偿的经济损失如下:⑴在建工程损失30 万元;⑵承包人的施工机械设备损坏损失5 万元;⑶承包人受伤人员医药费和补偿金45 万元;⑷工程清理修复费用2 万元。根据《建设工程施工合同(示范文本)》，项目监理机构应批准的补偿金额为()万元。",[325,327,329,331],{"key":20,"text":326,"correct":26},"32.0",{"key":24,"text":328,"correct":22},"36.5",{"key":28,"text":330,"correct":22},"37.0",{"key":31,"text":332,"correct":22},"41.5",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1109496,"某建筑工程钢筋综合用量1000t。施工合同中约定，结算时对钢筋综合价格涨幅±5%以上部分依据造价处发布的基准价调整价格差额。承包人投标报价2400 元\u002Ft，投标期、施工期间造价管理机构发布的钢筋综合基准价格为2500 元\u002Ft、2800 元\u002Ft，则需调增钢筋材料费用为()万元。",[337,339,341,343],{"key":20,"text":338,"correct":26},"17.5",{"key":24,"text":340,"correct":22},"28.0",{"key":28,"text":342,"correct":22},"30.0",{"key":31,"text":344,"correct":22},"40.0",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},1109497,"某施工合同约定采用价格指数及价格调整公式调整价格差额，调价因素及有关数据见下表。某月完成进度款为1500万元，则该月应当支付给承包人的价格调整金额为（ ）万元。",[349,351,353,355],{"key":20,"text":350,"correct":22},"-30.3",{"key":24,"text":352,"correct":26},"36.45",{"key":28,"text":354,"correct":22},"112.5",{"key":31,"text":356,"correct":22},"130.5",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":31,"analysis":33},1109498,"某土方工程招标工程量清单中，土方开挖工程量为600m3。施工过程中，由于设计变更，减少土方开挖工程量100m3，则减少后剩余部分的工程量综合单价应()。",[361,363,365,367],{"key":20,"text":362,"correct":22},"由发包人确定",{"key":24,"text":364,"correct":22},"直接采用该项目综合单价",{"key":28,"text":366,"correct":22},"相应调低",{"key":31,"text":368,"correct":26},"相应调高",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},1109499,"某招标工程项目执行《建设工程工程量清单计价规范》（GB50500－2013），招标工程量清单中某分项工程的工程量为1500m3，施工中由于设计变更调增为1900m3，该分项工程最高投标限价综合单价为40元\u002Fm3，投标报价为47元\u002Fm3，则该分项工程的结算价为（ ）元。",[373,375,377,379],{"key":20,"text":374,"correct":22},"87400",{"key":24,"text":376,"correct":22},"88900",{"key":28,"text":378,"correct":26},"89125",{"key":31,"text":380,"correct":22},"89300",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":28,"analysis":33},1109500,"施工过程中，出现施工图纸变更导致项目特征与招标工程量清单项目特征描述不符时，综合单价的确定应以()的项目特征为准。",[385,387,389,391],{"key":20,"text":386,"correct":22},"原设计图纸所示",{"key":24,"text":388,"correct":22},"清单描述",{"key":28,"text":390,"correct":26},"变更图纸所示",{"key":31,"text":392,"correct":22},"标准图集描述",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":28,"analysis":33},1109501,"施工合同中约定，承包人承担的钢筋价格风险幅度为±5%，超出部份依据《建设工程工程量清单规范》(GB50500-2013)造价信息法调差。已知承包人投标价格、基准期发布价格分别为2400元\u002Ft、 2200元\u002Ft，2015年12月、2016年7月的造价信息发布价为2000元\u002Ft、2600元\u002Ft。则该两月钢筋的实际结算价格应分别为()元\u002Ft。",[397,399,401,403],{"key":20,"text":398,"correct":22},"2280,2520",{"key":24,"text":400,"correct":22},"2310,2690",{"key":28,"text":402,"correct":26},"2310,2480",{"key":31,"text":404,"correct":22},"2280,2480",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},1109502,"因物价波动引起的价格调整，可采用价格指数法，在确定可调因子的基本价格指数时，所选择的基准日期是指()。",[409,411,413,415],{"key":20,"text":410,"correct":26},"投标截止期前28天",{"key":24,"text":412,"correct":22},"投标截止期前42天",{"key":28,"text":414,"correct":22},"开工日期前28天",{"key":31,"text":416,"correct":22},"开工日期前42天",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":33},1109503,"招标工程以投标截止日前()天为基准日，其后相关法律法规发生变化并引起工程造价增减变化的，可以调整合同价款。",[421,422,424,425],{"key":20,"text":112,"correct":22},{"key":24,"text":423,"correct":22},"15",{"key":28,"text":116,"correct":26},{"key":31,"text":426,"correct":22},"30",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":28,"analysis":33},1109504,"已标价工程量清单中有适用于变更工程项目的，采用该项目的单价；但当工程量增加( )以上时，其增加部分的工程量的综合单价应予( )。",[431,433,435,437],{"key":20,"text":432,"correct":22},"10%，调低",{"key":24,"text":434,"correct":22},"10%，调高",{"key":28,"text":436,"correct":26},"15%，调低",{"key":31,"text":438,"correct":22},"15%，调高",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},1109506,"某招标工程发生工程变更，引起已标价工程量清单项目发生变化，若该项目没有适用也没有类似于变更工程项目，发承包双方参考报价浮动率进行工程项目调整。该项目中标价为3000万元，招标控制价为3300万元，施工图预算为3100万元，标底为3050万元。则承包人报价浮动率是（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"1.64％",{"key":24,"text":446,"correct":22},"3.22％",{"key":28,"text":448,"correct":22},"6.06％",{"key":31,"text":450,"correct":26},"9.09％",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},1109508,"负责组织审查承包人提出的工程变更申请并提出审查意见的是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":26},"总监理工程师",{"key":24,"text":458,"correct":22},"专业监理工程师",{"key":28,"text":460,"correct":22},"监理单位技术责任人",{"key":31,"text":462,"correct":22},"项目经理",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},1109510,"对某招标工程进行报价分析，在不考虑安全文明施工费的前提下，承包人中标价为1500 万元，招标控制价为1600 万元，设计院编制的施工图预算为1550 万元，承包人认为的合理报价值为1540万元，则承包人的报价浮动率是()。",[467,469,471,473],{"key":20,"text":468,"correct":22},"0.65%",{"key":24,"text":470,"correct":26},"6.25%",{"key":28,"text":472,"correct":22},"93.75%",{"key":31,"text":474,"correct":22},"96.25%",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},1109511,"根据《建设工程工程量清单计价规范》（GB 50500-2013），中标人投标报价浮动率的计算公式是（ ）。",[479,480,481,482],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":28,"analysis":33},1109512,"下列承包人因工程变更提出的调整措施项目费的事项中，需采用承包人报价浮动率计算的是()。",[487,489,491,493],{"key":20,"text":488,"correct":22},"安全文明施工费",{"key":24,"text":490,"correct":22},"按单价计算的措施项目费",{"key":28,"text":492,"correct":26},"按总价计算的措施项目费",{"key":31,"text":494,"correct":22},"实施方案未提交发包人确认的措施项目费",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},1109518,"由于发包人的原因导致承包人自有的设备窝工，该窝工费应按照（）计算。",[499,501,503,505],{"key":20,"text":500,"correct":22},"台班费",{"key":24,"text":502,"correct":26},"台班折旧费",{"key":28,"text":504,"correct":22},"实际租金和调进调出费的分摊",{"key":31,"text":506,"correct":22},"设备使用费",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},1109519,"某项目合同履行过程中，由于法规变更，导致承包人成本增加，工程匀速施工没有出现进度偏差。下列关于承包人补偿的说法中，正确的是（）。",[511,513,515,517],{"key":20,"text":512,"correct":26},"发包人应给予承包人补偿",{"key":24,"text":514,"correct":22},"发包人不给予承包人补偿",{"key":28,"text":516,"correct":22},"竣工结算时，承包人与发包人协商是否补偿",{"key":31,"text":518,"correct":22},"通过仲裁决定是否给予承包人补偿",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":31,"analysis":33},1109520,"最常用的计算索赔费用的方法是( )。",[523,525,527,529],{"key":20,"text":524,"correct":22},"总费用法",{"key":24,"text":526,"correct":22},"修正的总费用法",{"key":28,"text":528,"correct":22},"关键线路法",{"key":31,"text":530,"correct":26},"实际费用法",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},1109524,"当施工机械停工导致费用索赔成立时，台班停滞费用正确的计算方法是()。",[535,537,539,541],{"key":20,"text":536,"correct":22},"按照机械设备台班费计算",{"key":24,"text":538,"correct":22},"按照台班费中的设备使用费计算",{"key":28,"text":540,"correct":26},"自有设备按照台班折旧费计算",{"key":31,"text":542,"correct":22},"租赁设备按照台班租金计算",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},1109525,"根据FIDIC《施工合同条件》，下列索赔事项中，承包人只能申请延长工期和增加费用、不能索赔利润的是()。",[547,549,551,553],{"key":20,"text":548,"correct":22},"文件有缺陷或技术性错误",{"key":24,"text":550,"correct":26},"发现有价值文物",{"key":28,"text":552,"correct":22},"工程师放线错误",{"key":31,"text":554,"correct":22},"发包人未能提供现场",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":31,"analysis":33},1109526,"计算索赔费用最常用的方法是()。",[559,560,561,562],{"key":20,"text":524,"correct":22},{"key":24,"text":526,"correct":22},{"key":28,"text":528,"correct":22},{"key":31,"text":530,"correct":26},{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":28,"analysis":33},1109527,"某工程合同价格为5000万元，计划工期是200天，施工期间因非承包人原因导致工期延误10天，若同期该公司承揽的所有工程合同总价为2.5亿元，计划总部管理费为1250万元，则承包人可以索赔的总部管理费为（ ）万元。",[567,569,571,573],{"key":20,"text":568,"correct":22},"7.5",{"key":24,"text":570,"correct":22},"10",{"key":28,"text":572,"correct":26},"12.5",{"key":31,"text":423,"correct":22},{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},1109528,"下列事件中，需要进行现场签证的是（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"合同范围以内零星工程的确认",{"key":24,"text":581,"correct":26},"修改施工方案引起工程量增减的确认",{"key":28,"text":583,"correct":22},"承包人原因导致设备窝工损失的确认",{"key":31,"text":585,"correct":22},"合同范围以外新增工程的确认",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},1109529,"下列引起费用增加的事项中，属于现场签证范围的是()。",[590,592,594,596],{"key":20,"text":591,"correct":26},"施工合同范围以外的零星工程",{"key":24,"text":593,"correct":22},"承包人原因导致的人工、设备窝工",{"key":28,"text":595,"correct":22},"纠正施工方案错误引起的费用",{"key":31,"text":597,"correct":22},"质量问题返工的工程量",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":24,"analysis":33},1109532,"承包人应在( )向发包人提交预付款支付申请。",[602,604,606,608],{"key":20,"text":603,"correct":22},"签订合同时",{"key":24,"text":605,"correct":26},"签订合同后",{"key":28,"text":607,"correct":22},"中标后",{"key":31,"text":609,"correct":22},"开工时",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]