[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-40":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":569},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,40,50,2641,[13,34,46,58,70,82,94,104,116,128,138,148,160,172,184,193,202,211,223,231,243,251,263,275,283,295,306,318,330,338,350,359,371,381,393,401,413,425,437,449,461,471,482,490,502,511,523,535,546,557],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1109345,1,"单选题","下列不属于工程勘察设计阶段的质量控制的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","选择好勘察设计单位",false,{"key":24,"text":25,"correct":22},"B","保证工程设计符合决策阶段确定的质量要求",{"key":27,"text":28,"correct":22},"C","保证设计符合有关技术规范和标准的规定",{"key":30,"text":31,"correct":32},"D","择优选择服务质量好的监理单位",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1109346,"要严防出现系统性因素的质量变异，要把质量波动控制在偶然性因素范围内。这主要是因为工程质量本身具有（ ）的特点。",[38,40,42,44],{"key":20,"text":39,"correct":22},"影响因素多",{"key":24,"text":41,"correct":32},"质量波动大",{"key":27,"text":43,"correct":22},"检验特殊性",{"key":30,"text":45,"correct":22},"终检局限性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1109347,"工程质量控制应坚持()的原则。即工程质量应积极主动地对影响质量的各种因素加以控制，而不是消极被动地处理出现的质量问题",[50,52,54,56],{"key":20,"text":51,"correct":22},"以人为核心",{"key":24,"text":53,"correct":32},"以预防为主",{"key":27,"text":55,"correct":22},"质量第一",{"key":30,"text":57,"correct":22},"质量达到标准",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1109348,"工程质量控制中，应坚持以()为核心的原则。",[62,64,66,68],{"key":20,"text":63,"correct":32},"人员",{"key":24,"text":65,"correct":22},"机械",{"key":27,"text":67,"correct":22},"材料",{"key":30,"text":69,"correct":22},"方法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1109350,"（ ），是指工程在规定的条件下，满足规定功能要求的合理使用年限。",[74,76,78,80],{"key":20,"text":75,"correct":22},"适用性",{"key":24,"text":77,"correct":32},"耐久性",{"key":27,"text":79,"correct":22},"可靠性",{"key":30,"text":81,"correct":22},"节能性",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1109351,"工程质量控制按其实施主体不同分为自控主体和监控主体。下列单位中属于监控主体的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"设计单位",{"key":24,"text":89,"correct":22},"咨询单位",{"key":27,"text":91,"correct":32},"监理单位",{"key":30,"text":93,"correct":22},"施工单位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1109352,"工程质量控制应该是积极主动的，应事先对影响质量的各种因素加以控制，而不能是消极被动的，等出现质量问题再进行处理。这体现了质量控制坚持的（ ）原则。",[98,99,101,102],{"key":20,"text":55,"correct":22},{"key":24,"text":100,"correct":32},"预防为主",{"key":27,"text":51,"correct":22},{"key":30,"text":103,"correct":22},"质量标准",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1109354,"根据《中华人民共和国建筑法》规定，建设工程开工前，建设单位应当按照国家有关规定向（ ）以上人民政府建设行政主管部门申请领取施工许可证；但是，国务院建设行政主管部门确定的限额以下的小型工程除外。",[108,110,112,114],{"key":20,"text":109,"correct":22},"建设单位所在地县级",{"key":24,"text":111,"correct":32},"工程所在地县级",{"key":27,"text":113,"correct":22},"建设单位所在地市级",{"key":30,"text":115,"correct":22},"工程所在地市级",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1109355,"根据我国投资建设项目管理体制，建设工程管理的行为主体可分为( )类。",[120,122,124,126],{"key":20,"text":121,"correct":22},"二",{"key":24,"text":123,"correct":32},"三",{"key":27,"text":125,"correct":22},"四",{"key":30,"text":127,"correct":22},"五",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1109357,"建设单位收到建设工程竣工报告后，( )应当组织设计、施工、工程监理等有关单位进行竣工验收。",[132,133,135,137],{"key":20,"text":91,"correct":22},{"key":24,"text":134,"correct":32},"建设单位",{"key":27,"text":136,"correct":22},"质量监督机构",{"key":30,"text":93,"correct":22},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},1109359,"我国建设工程质量监督管理的具体实施者是（ ）。",[142,144,146,147],{"key":20,"text":143,"correct":22},"建设行政主管部门",{"key":24,"text":145,"correct":32},"工程质量监督机构",{"key":27,"text":91,"correct":22},{"key":30,"text":134,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":27,"analysis":33},1109360,"下列关于办理施工许可证应满足条件的说法中，叙述错误的是（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"已经确定施工企业",{"key":24,"text":155,"correct":22},"已经办理该建设工程用地批准手续",{"key":27,"text":157,"correct":32},"有全套的施工图纸及技术资料",{"key":30,"text":159,"correct":22},"需要拆迁的，其拆迁进度符合施工要求",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":20,"analysis":33},1109361,"下列最低保修期限为5年的是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":32},"有防水要求的卫生间",{"key":24,"text":167,"correct":22},"供热系统",{"key":27,"text":169,"correct":22},"电气管线",{"key":30,"text":171,"correct":22},"给排水管道",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},1109364,"根据《建筑法》，关于施工许可的说法，正确的是()。",[176,178,180,182],{"key":20,"text":177,"correct":22},"建设单位申领施工许可证时，应提交施工合同和监理合同",{"key":24,"text":179,"correct":32},"建设单位申领施工许可证时，应有保证工程质量和安全的具体措施",{"key":27,"text":181,"correct":22},"因故不能按施工许可如期开工的，可申请延期2次，每次不超过6个月",{"key":30,"text":183,"correct":22},"建筑工程因故中止施工的，建设单位应在3个月内向发证机关报告",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},1109365,"发生涉及结构安全的质量缺陷，应当立即向当地建设行政主管部门报告，由（ ）提出保修方案，施工单位实施保修。",[188,190,191,192],{"key":20,"text":189,"correct":32},"原设计单位",{"key":24,"text":91,"correct":22},{"key":27,"text":93,"correct":22},{"key":30,"text":134,"correct":22},{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":30,"analysis":33},1109366,"（ ）应当将施工图送审查机构审查。",[197,198,199,201],{"key":20,"text":87,"correct":22},{"key":24,"text":93,"correct":22},{"key":27,"text":200,"correct":22},"勘察单位",{"key":30,"text":134,"correct":32},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1109367,"（ ）的主要责任是对建设工程的全过程、全方位实施有效管理，保证建设工程总体目标的实现。",[206,208,209,210],{"key":20,"text":207,"correct":22},"政府部门",{"key":24,"text":134,"correct":32},{"key":27,"text":91,"correct":22},{"key":30,"text":93,"correct":22},{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1109368,"根据《建设工程施工合同（示范文本）》（GF—2017—0201），工程质量保修期自（ ）起计算。",[215,217,219,221],{"key":20,"text":216,"correct":22},"合同签订日期",{"key":24,"text":218,"correct":32},"竣工验收合格之日",{"key":27,"text":220,"correct":22},"实际竣工日期",{"key":30,"text":222,"correct":22},"颁发工程接收证书之日",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1109369,"工程质量检验机构出具的检验报告需经（ ）确认后，方可按规定归档。",[227,228,229,230],{"key":20,"text":134,"correct":32},{"key":24,"text":93,"correct":22},{"key":27,"text":87,"correct":22},{"key":30,"text":145,"correct":22},{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":24,"analysis":33},1109370,"施工图设计文件审核合格，审查机构应当在（ ）内将审查情况报工程所在地县级以上地方人民政府建设主管部门备案。",[235,237,239,241],{"key":20,"text":236,"correct":22},"5日",{"key":24,"text":238,"correct":32},"5个工作日",{"key":27,"text":240,"correct":22},"15日",{"key":30,"text":242,"correct":22},"15个工作日",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":24,"analysis":33},1109371,"在建设工程管理中，（ ）自始至终是建设工程管理的主导者和责任人。",[247,248,249,250],{"key":20,"text":207,"correct":22},{"key":24,"text":134,"correct":32},{"key":27,"text":91,"correct":22},{"key":30,"text":93,"correct":22},{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":30,"analysis":33},1109374,"建设单位应当自领取施工许可证之日起（ ）个月内开工，因故不能按期开工的，应当向发证机关延期申请；延期以（ ）次为限，每次不超过（ ）个月。",[255,257,259,261],{"key":20,"text":256,"correct":22},"1,1,1",{"key":24,"text":258,"correct":22},"2,2,2",{"key":27,"text":260,"correct":22},"3,3,3",{"key":30,"text":262,"correct":32},"3,2,3",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":24,"analysis":33},1109375,"根据《建设工程质量管理条例》，设计文件中选用的材料、构配件和设备，应当注明（ ）。",[267,269,271,273],{"key":20,"text":268,"correct":22},"生产厂",{"key":24,"text":270,"correct":32},"规格和型号",{"key":27,"text":272,"correct":22},"供应商",{"key":30,"text":274,"correct":22},"使用年限",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":27,"analysis":33},1109376,"工程质量检测中，检测机构完成检测业务后，应当及时出具检测报告，检测报告经建设单位或者工程监理单位确认后，由（ ）归档。",[279,280,281,282],{"key":20,"text":134,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":93,"correct":32},{"key":30,"text":87,"correct":22},{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":27,"analysis":33},1109378,"某住宅楼工程，总承包单位将装饰装修工程分包。工程竣工验收后发现一些问题： 主体工程混凝土出现部分渗漏、一些房间墙面瓷砖脱落等问题。关于该责任承担的说法， 正确的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"由总承包单位承担全部责任",{"key":24,"text":290,"correct":22},"由总承包单位与分包单位承担连带责任",{"key":27,"text":292,"correct":32},"总承包单位对主体混凝土质量承担责任，总承包单位与分包单位对墙面瓷砖质量承担连带责任",{"key":30,"text":294,"correct":22},"总承包单位对主体混凝土质量承担责任，分包单位对墙面瓷砖质量承担责任",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":30,"analysis":33},1109379,"设计单位在设计文件中，不可以注明选用的建筑材料、建筑构配件和设备的（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"规格",{"key":24,"text":302,"correct":22},"型号",{"key":27,"text":304,"correct":22},"性能",{"key":30,"text":272,"correct":32},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},1109380,"下列不属于建设单位的质量责任和义务的是（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"应当将工程发包给具有相应资质等级的单位，不得将建设工程肢解发包",{"key":24,"text":313,"correct":22},"施工图设计文件未经审查批准的，不得使用",{"key":27,"text":315,"correct":32},"对施工中出现质量问题的建设工程或者竣工验收不合格的建设工程，应当负责返修",{"key":30,"text":317,"correct":22},"应当严格按照国家有关档案管理的规定，及时收集、整理建设项目各环节的文件资料，建立、健全建设项目档案",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":30,"analysis":33},1109381,"下列关于建设单位的质量责任，叙述错误的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"建设单位不得迫使承包方以低于成本的价格竞标",{"key":24,"text":325,"correct":22},"建设单位不得任意压缩合理工期",{"key":27,"text":327,"correct":22},"建设单位不得明示或者暗示施工单位违反工程建设强制性标准，降低建设工程质量",{"key":30,"text":329,"correct":32},"建设单位可以根据工程的具体情况决定是否采取招标",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1109382,"工程质量检验机构出具的检验报告需经确认后，由()归档",[334,335,336,337],{"key":20,"text":91,"correct":22},{"key":24,"text":93,"correct":32},{"key":27,"text":87,"correct":22},{"key":30,"text":145,"correct":22},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":30,"analysis":33},1109383,"根据《建设工程质量管理条例》，设计文件应符合国家规定的设计深度要求并注明工程（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"材料生产厂家",{"key":24,"text":345,"correct":22},"保修期限",{"key":27,"text":347,"correct":22},"材料供应单位",{"key":30,"text":349,"correct":32},"合理使用年限",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":30,"analysis":33},1109384,"涉及建筑承重结构变动的装修工程设计方案，应经（ ）审批后方可实施。",[354,355,356,357],{"key":20,"text":134,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":87,"correct":22},{"key":30,"text":358,"correct":32},"原施工图审查机构",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},1109385,"（ ）是根据建设项目总体需求和地质勘察报告，对工程的外形和内在的实体进行筹划、研究、构思、设计和描绘，形成设计说明书和图纸等相关文件，使得质量目标和水平具体化，为施工提供直接依据。",[363,365,367,369],{"key":20,"text":364,"correct":32},"工程设计",{"key":24,"text":366,"correct":22},"工程决策",{"key":27,"text":368,"correct":22},"工程监理",{"key":30,"text":370,"correct":22},"工程施工",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},1109386,"工程承发包管理包括规定工程招标投标承发包的范围、类型、条件，对招标投标承发包活动的依法监督和工程合同内容的规范性管理。工程承发包管理属于（ ）的管理职能。",[375,377,379,380],{"key":20,"text":376,"correct":22},"业主",{"key":24,"text":378,"correct":32},"政府",{"key":27,"text":91,"correct":22},{"key":30,"text":93,"correct":22},{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},1109387,"工程建设的不同阶段，对工程项目质量的形成起着不同的作用和影响。其中项目决策阶段是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"将项目质量目标和水平具体化",{"key":24,"text":388,"correct":32},"确定项目应达到的质量目标与水平",{"key":27,"text":390,"correct":22},"将项目质量目标和制度具体化",{"key":30,"text":392,"correct":22},"确定项目应达到的质量目标与制度",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},1109388,"工程质量控制按其实施主体不同分为自控主体和监控主体。下列单位中属于自控主体的是（ ）。",[397,398,399,400],{"key":20,"text":87,"correct":32},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":30,"text":134,"correct":22},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":30,"analysis":33},1109389,"工程质量控制应该是积极主动的，要重点做好质量的（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"事前控制",{"key":24,"text":408,"correct":22},"事中控制",{"key":27,"text":410,"correct":22},"事后控制",{"key":30,"text":412,"correct":32},"事前控制和事中控制",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1109390,"工程质量形成过程中，直接影响项目决策和设计质量的是（ ）阶段。",[417,419,421,423],{"key":20,"text":418,"correct":22},"勘察设计",{"key":24,"text":420,"correct":32},"可行性研究",{"key":27,"text":422,"correct":22},"竣工验收",{"key":30,"text":424,"correct":22},"施工安装",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":27,"analysis":33},1109391,"关于工程质量检测机构职责的说法，不正确的是（ ）",[429,431,433,435],{"key":20,"text":430,"correct":22},"检测报告经检测人员签字、检测机构法定代表人或者其授权的签字人签署，并加盖检测机构公章或者检测专用章后方可生效",{"key":24,"text":432,"correct":22},"检测机构对涉及结构安全检测结果的不合格情况，及时报告工程所在地建设主管部门",{"key":27,"text":434,"correct":32},"检测人员可以同时受聘于两个或者两个以上的检测机构",{"key":30,"text":436,"correct":22},"检测机构应当建立档案管理制度，应当单独建立检测结果不合格项目台账",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":27,"analysis":33},1109392,"建设工程质量保修书应由（ ）出具。",[441,443,445,447],{"key":20,"text":442,"correct":22},"建设单位向建设行政主管部门",{"key":24,"text":444,"correct":22},"建设单位向用户",{"key":27,"text":446,"correct":32},"承包单位向建设单位",{"key":30,"text":448,"correct":22},"承包单位向监理单位",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1109393,"下列关于工程项目建设各阶段对质量形成的影响的说法，错误的是（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"项目的可行性研究直接影响项目的决策质量和设计质量",{"key":24,"text":456,"correct":32},"工程施工阶段是影响工程项目质量的主要阶段",{"key":27,"text":458,"correct":22},"项目决策阶段对工程质量的影响主要是确定工程项目应达到的质量目标和水平",{"key":30,"text":460,"correct":22},"工程竣工验收对质量的影响是保证最终产品的质量",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":30,"analysis":33},1109394,"下列选项中，不属于建设工程质量特性的是（ ）。",[465,466,467,469],{"key":20,"text":75,"correct":22},{"key":24,"text":81,"correct":22},{"key":27,"text":468,"correct":22},"与环境的协调性",{"key":30,"text":470,"correct":32},"隐蔽性",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},1109395,"在工程建设的（ ）阶段，需要确定工程项目的质量要求，并与投资目标相协调。",[475,477,478,480],{"key":20,"text":476,"correct":22},"项目建议书",{"key":24,"text":420,"correct":32},{"key":27,"text":479,"correct":22},"项目决策",{"key":30,"text":481,"correct":22},"勘察、设计",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1109396,"在建设工程管理中，（ ）是建设工程管理的主导者和责任人。",[486,487,488,489],{"key":20,"text":207,"correct":22},{"key":24,"text":134,"correct":32},{"key":27,"text":91,"correct":22},{"key":30,"text":93,"correct":22},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1109397,"在正常使用下，房屋建筑主体结构工程的最低保修期为( )。",[494,496,498,500],{"key":20,"text":495,"correct":22},"建设单位要求的使用年限",{"key":24,"text":497,"correct":32},"设计文件规定的合理使用年限",{"key":27,"text":499,"correct":22},"30年",{"key":30,"text":501,"correct":22},"50年",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},1109398,"工程满足使用目的的各种性能，被称为（ ）。",[506,508,509,510],{"key":20,"text":507,"correct":22},"安全性",{"key":24,"text":79,"correct":22},{"key":27,"text":75,"correct":32},{"key":30,"text":468,"correct":22},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":30,"analysis":33},1109399,"（）的质量控制，主要是通过项目的可行性研究，选择最佳建设方案，使项目的质量要求符合业主的意图，并与投资目标相协调，与所在地区环境相协调。",[515,517,519,521],{"key":20,"text":516,"correct":22},"工程设计阶段",{"key":24,"text":518,"correct":22},"施工控制阶段",{"key":27,"text":520,"correct":22},"工程勘察阶段",{"key":30,"text":522,"correct":32},"决策阶段",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1109400,"建设工程质量是指建设工程满足相关标准规定和（ ）要求的程度。",[527,529,531,533],{"key":20,"text":528,"correct":22},"顾客特殊",{"key":24,"text":530,"correct":32},"合同约定",{"key":27,"text":532,"correct":22},"行业默认规则",{"key":30,"text":534,"correct":22},"全部业主意愿",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":27,"analysis":33},1109401,"（ ）是通过项目可行性研究和项目评估，对项目的建设方案做出决策，使项目建设充分反映业主对质量的要求和意愿。",[539,540,542,544],{"key":20,"text":516,"correct":22},{"key":24,"text":541,"correct":22},"工程施工阶段",{"key":27,"text":543,"correct":32},"项目决策阶段",{"key":30,"text":545,"correct":22},"项目可行性研究阶段",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":30,"analysis":33},1109402,"存工程质量保修期限内，因勘察、设计、施工、材料等原因造成的质量问题，要由（ ）单位负责维修、更换，由责任单位负责赔偿损失。",[550,551,553,555],{"key":20,"text":378,"correct":22},{"key":24,"text":552,"correct":22},"监理",{"key":27,"text":554,"correct":22},"设计",{"key":30,"text":556,"correct":32},"施工",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1109403,"工程项目建设的各阶段对工程项目最终质量的形成都产生重要影响，其中项目决策阶段是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"确定项目质量目标与水平的依据",{"key":24,"text":564,"correct":32},"确定项目质量目标与水平",{"key":27,"text":566,"correct":22},"将项目质量与水平具体化",{"key":30,"text":568,"correct":22},"确定项目质量目标与水平达到的程度",[570,573,576,579,582,585],{"id":15,"name":571,"category":7,"favorite":572},"领导干部任职前廉政法规知识测试题",92,{"id":574,"name":575,"category":7,"favorite":15},595,"建筑结构与设备",{"id":577,"name":578,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":580,"name":581,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":583,"name":584,"category":7,"favorite":8},534,"BIM工程师",{"id":586,"name":584,"category":7,"favorite":8},535]