[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":562},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,4,50,2641,[13,34,46,58,70,79,91,103,111,123,132,144,156,166,178,186,195,207,219,230,242,252,262,270,278,290,302,310,320,330,342,354,366,378,387,399,409,421,431,439,451,463,473,484,496,505,517,529,541,550],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1107334,1,"单选题","在设备制造过程中，监造人员定期、不定期到制造现场，检查了解设备制造过程的质量状况，发现问题及时处理。这种质量监控方式称为（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","驻厂监造",false,{"key":24,"text":25,"correct":22},"B","定点监控",{"key":27,"text":28,"correct":22},"C","跟踪监控",{"key":30,"text":31,"correct":32},"D","巡回监控",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1107335,"监理工程师在对设备制造的质量控制中，（ ）不是设备制造过程中的质量控制。",[38,40,42,44],{"key":20,"text":39,"correct":22},"对加工作业条件的控制",{"key":24,"text":41,"correct":22},"对工序产品的检查与控制",{"key":27,"text":43,"correct":32},"对生产人员上岗资格的审查",{"key":30,"text":45,"correct":22},"对不合格零件的处置",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1107336,"设备制造图纸的设计交底或图纸会审，由（ ）组织。",[50,52,54,56],{"key":20,"text":51,"correct":22},"监理单位",{"key":24,"text":53,"correct":32},"建设单位",{"key":27,"text":55,"correct":22},"设计单位",{"key":30,"text":57,"correct":22},"安装单位",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1107337,"按合同规定，设备制造厂申请出厂前的试车或整机性能检测，（ ）组织（ ）参加，符合要求后予以签认。",[62,64,66,68],{"key":20,"text":63,"correct":22},"建设单位，总监理工程师",{"key":24,"text":65,"correct":32},"总监理工程师，专业监理工程师",{"key":27,"text":67,"correct":22},"建设单位，设计单位",{"key":30,"text":69,"correct":22},"专业监理工程师，监理员",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1107338,"监造人员直接进入设备制造厂的制造现场，成立相应的监造小组，编制监造规划，实施质量监控的方式是（ ）。",[74,75,76,78],{"key":20,"text":31,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":77,"correct":22},"旁站监控",{"key":30,"text":21,"correct":32},{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":24,"analysis":33},1107340,"在设备运往现场前，项目监理机构应按设计要求检查设备制造单位对待运设备采取的防护和包装措施，并应检查是否符合运输、装卸、储存、安装的要求，以及相关的随机文件、装箱单和附件是否齐全，符合要求后由（ ）签认同意后方可出厂。",[83,85,87,89],{"key":20,"text":84,"correct":22},"专业监理工程师",{"key":24,"text":86,"correct":32},"总监理工程师",{"key":27,"text":88,"correct":22},"政府质检部门",{"key":30,"text":90,"correct":22},"安装单位质检员",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},1107341,"为了防止零件锈蚀和使设备美观协调以及为满足其他方面的要求，（ ）必须对零件和设备要涂防锈油脂或涂装漆。",[95,97,99,101],{"key":20,"text":96,"correct":22},"设备采购单位",{"key":24,"text":98,"correct":32},"设备制造单位",{"key":27,"text":100,"correct":22},"设备设计单位",{"key":30,"text":102,"correct":22},"设备运输单位",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},1107342,"在设备制造过程中，大部分设备都可采用的质量监控方式为（ ）。",[107,108,109,110],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":22},{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":20,"analysis":33},1107343,"设备监造就是要督促和协调设备制造单位的工作，使制造出来的设备在（ ）方面全面符合采购的要求。",[115,117,119,121],{"key":20,"text":116,"correct":32},"技术性能和质量",{"key":24,"text":118,"correct":22},"技术性能和设备运输",{"key":27,"text":120,"correct":22},"设备运输和质量",{"key":30,"text":122,"correct":22},"设备运输和安装调试",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":20,"analysis":33},1107344,"在设备制造过程中，（ ）应组织设备制造图纸的设计交底或图纸会审。",[127,128,129,131],{"key":20,"text":53,"correct":32},{"key":24,"text":51,"correct":22},{"key":27,"text":130,"correct":22},"采购单位",{"key":30,"text":55,"correct":22},{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":20,"analysis":33},1107345,"设备制造的质量控制内容中，下列属于设备制造单位质量管理检查资料的是（ ）。",[136,138,140,142],{"key":20,"text":137,"correct":32},"质量责任制",{"key":24,"text":139,"correct":22},"制造检验技术标准",{"key":27,"text":141,"correct":22},"工序交接检查验收记录",{"key":30,"text":143,"correct":22},"设计变更记录",{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":24,"analysis":33},1107346,"（ ）的质量控制，是设备制造质量控制的重点。",[148,150,152,154],{"key":20,"text":149,"correct":22},"制造前",{"key":24,"text":151,"correct":32},"制造过程",{"key":27,"text":153,"correct":22},"制造后",{"key":30,"text":155,"correct":22},"施工中",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":20,"analysis":33},1107347,"总监理工程师应组织（ ）参加设备的调整试车和整机性能检测，记录数据，验证设备是否达到合同规定的技术质量要求。",[160,161,162,164],{"key":20,"text":84,"correct":32},{"key":24,"text":53,"correct":22},{"key":27,"text":163,"correct":22},"施工单位",{"key":30,"text":165,"correct":22},"总监理工程师代表",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1107348,"关于设备采购质量控制的说法，正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"市场采购设备，主要用于非标准设备的采购",{"key":24,"text":173,"correct":32},"向生产厂家订购设备，质量控制工作的首要环节是选择一个合格供货厂商",{"key":27,"text":175,"correct":22},"招标采购设备，一般用于标准设备的采购",{"key":30,"text":177,"correct":22},"建设单位直接采购设备的，设备采购方案由设备安装单位编制",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1107349,"在设备招标采购阶段，（ ）应协助建设单位向中标单位或设备供货厂商移交必要的技术文件。",[182,183,184,185],{"key":20,"text":51,"correct":32},{"key":24,"text":55,"correct":22},{"key":27,"text":163,"correct":22},{"key":30,"text":130,"correct":22},{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":27,"analysis":33},1107350,"项目监理机构应掌握不合格零件的情况，当发生质量失控时，由（ ）下达暂停制造指令，提出处理意见，并及时报告建设单位。",[190,191,193,194],{"key":20,"text":84,"correct":22},{"key":24,"text":192,"correct":22},"项目经理",{"key":27,"text":86,"correct":32},{"key":30,"text":165,"correct":22},{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":30,"analysis":33},1107351,"对主要设备或关键设备，项目监理机构应将设备制造厂作为工程项目（ ）实施监理，按程序和要求做好监造工作。",[199,201,203,205],{"key":20,"text":200,"correct":22},"建设单位的承包单位",{"key":24,"text":202,"correct":22},"总承包单位的平行单位",{"key":27,"text":204,"correct":22},"总承包单位的供货单位",{"key":30,"text":206,"correct":32},"总承包单位的分包单位",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},1107352,"下列有关市场采购设备质量控制的表述，正确的是（ ）。",[211,213,215,217],{"key":20,"text":212,"correct":32},"监理单位负责审查总包单位编制的采购方案",{"key":24,"text":214,"correct":22},"建设单位直接采购的，施工单位要协助编制设备采购方案",{"key":27,"text":216,"correct":22},"建设单位负责审查安装单位编制的采购方案",{"key":30,"text":218,"correct":22},"市场采购方式主要用于非标准设备的采购",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":20,"analysis":33},1107353,"由总包单位或安装单位采购的设备，其采购方案须事前提交给（ ），经其审查认可。",[223,225,227,228],{"key":20,"text":224,"correct":32},"项目监理机构",{"key":24,"text":226,"correct":22},"设备总工程师",{"key":27,"text":53,"correct":22},{"key":30,"text":229,"correct":22},"设备安装工程师",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":24,"analysis":33},1107354,"在市场采购设备质量控制中，根据设计文件，对需要采购的设备应编制（ ），以及相应的备品配件表。",[234,236,238,240],{"key":20,"text":235,"correct":22},"采购设备表",{"key":24,"text":237,"correct":32},"拟采购设备表",{"key":27,"text":239,"correct":22},"采购计划",{"key":30,"text":241,"correct":22},"设备供求调查",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":27,"analysis":33},1107355,"施工单位按照施工进度计划完成分部工程施工，由（ ）组织相关人员对分部工程进行验收，并签署验收意见。",[246,248,250,251],{"key":20,"text":247,"correct":22},"施工单位项目经理",{"key":24,"text":249,"correct":22},"质量监督机构",{"key":27,"text":86,"correct":32},{"key":30,"text":84,"correct":22},{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},1107357,"施工组织设计在实施过程中，施工单位如需做较大的变更，应经（ ）审查同意。",[256,257,258,260],{"key":20,"text":84,"correct":22},{"key":24,"text":86,"correct":32},{"key":27,"text":259,"correct":22},"施工单位技术负责人",{"key":30,"text":261,"correct":22},"建设单位负责人",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1107358,"项目监理机构应审查施工单位报审的施工组织设计，符合要求时，应由（ ）签认。",[266,267,268,269],{"key":20,"text":84,"correct":22},{"key":24,"text":86,"correct":32},{"key":27,"text":259,"correct":22},{"key":30,"text":53,"correct":22},{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":30,"analysis":33},1107359,"对于超过一定规模的危险性较大的分部分项工程专项方案，需由（ ）审批。",[274,275,276,277],{"key":20,"text":84,"correct":22},{"key":24,"text":86,"correct":22},{"key":27,"text":259,"correct":22},{"key":30,"text":53,"correct":32},{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":27,"analysis":33},1107360,"设计交底会议的程序和内容不包括（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"设计项目负责人介绍工程概况",{"key":24,"text":285,"correct":22},"各专业设计负责人进行专业设计交底",{"key":27,"text":287,"correct":32},"工程材料的来源是否有保证",{"key":30,"text":289,"correct":22},"设计方会同建设方将会议意见集中并形成会议纪要，经与会各单位负责人讨论确认后，在会上宣读",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":30,"analysis":33},1107361,"施工图设计交底的目的是设计单位向施工单位和监理单位进行（ ）和说明。",[294,296,298,300],{"key":20,"text":295,"correct":22},"设计图纸的交接",{"key":24,"text":297,"correct":22},"施工和监理任务的部署",{"key":27,"text":299,"correct":22},"质量目标的分解落实",{"key":30,"text":301,"correct":32},"设计意图的传达",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},1107362,"图纸会审的会议纪要应由（ ）负责整理，与会各方会签。",[306,307,308,309],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":163,"correct":32},{"key":30,"text":55,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},1107363,"监理单位对施工图纸的审核主要由（ ）负责组织。",[314,316,318,319],{"key":20,"text":315,"correct":22},"项目技术负责人",{"key":24,"text":317,"correct":22},"监理单位技术负责人",{"key":27,"text":86,"correct":32},{"key":30,"text":84,"correct":22},{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":30,"analysis":33},1107364,"项目监理机构在审批施工方案时，应检查施工单位内部审批是否完善、签章是否齐全，重点核对审批人是否为（ ）。",[324,325,327,329],{"key":20,"text":192,"correct":22},{"key":24,"text":326,"correct":22},"施工单位质量负责人",{"key":27,"text":328,"correct":22},"施工方案编制人",{"key":30,"text":259,"correct":32},{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1107365,"如果施工单位擅自改动审查批准施工组织设计的实质性内容，监理机构应及时发出（ ），要求按程序报审。",[334,336,338,340],{"key":20,"text":335,"correct":22},"工程暂停令",{"key":24,"text":337,"correct":32},"监理通知单",{"key":27,"text":339,"correct":22},"审查通知",{"key":30,"text":341,"correct":22},"变更通知单",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},1107366,"图纸会审的内容一般不包括（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"图纸是否已经审查机构签字、盖章",{"key":24,"text":349,"correct":22},"设计地震烈度是否符合当地要求",{"key":27,"text":351,"correct":32},"节能、环保是否满足要求",{"key":30,"text":353,"correct":22},"图纸是否满足项目立项的功能",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1107367,"图纸会审之后，设计单位在设计文件交付施工时，需按法律规定的义务进行（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"设计说明",{"key":24,"text":361,"correct":32},"设计交底",{"key":27,"text":363,"correct":22},"图纸审查",{"key":30,"text":365,"correct":22},"图纸解释",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1107369,"工程中采用新工艺、新材料的，应有（ ）及有关质量数据、指标，在此基础上制定有关的质量标准和施工工艺规程，以此作为判断与控制质量的依据。",[370,372,374,376],{"key":20,"text":371,"correct":22},"施工单位组织的专家论证意见",{"key":24,"text":373,"correct":32},"权威性技术部门的技术鉴定书",{"key":27,"text":375,"correct":22},"设计单位组织的专家论证意见",{"key":30,"text":377,"correct":22},"建设单位组织的专家论证意见",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1107370,"用于工程的由（ ）采购的主要设备应经建设单位、施工单位和项目监理机构共同进行开箱检查。并经三方在开箱检查记录上签字，合格的方可使用。",[382,383,384,385],{"key":20,"text":53,"correct":32},{"key":24,"text":163,"correct":22},{"key":27,"text":57,"correct":22},{"key":30,"text":386,"correct":22},"代理商",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":20,"analysis":33},1107371,"对于进口材料、构配件和设备，联合检查由施工单位提出申请，（ ）组织，（ ）主持。",[391,393,395,397],{"key":20,"text":392,"correct":32},"监理机构，建设单位",{"key":24,"text":394,"correct":22},"施工单位，总监理工程师",{"key":27,"text":396,"correct":22},"施工单位，建设单位",{"key":30,"text":398,"correct":22},"监理机构，施工单位",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":27,"analysis":33},1107372,"工程开工前，施工单位向监理机构报送的施工控制测量成果报验表，应经施工单位（ ）签字。",[403,404,406,407],{"key":20,"text":192,"correct":22},{"key":24,"text":405,"correct":22},"技术负责人",{"key":27,"text":315,"correct":32},{"key":30,"text":408,"correct":22},"测量负责人",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":20,"analysis":33},1107373,"项目监理机构收到施工单位报送的工程材料、构配件、设备报审表后，应重点审查工程材料、构配件、设备的（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":32},"质量证明文件",{"key":24,"text":416,"correct":22},"采购合同",{"key":27,"text":418,"correct":22},"设计要求文件",{"key":30,"text":420,"correct":22},"检查报告",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":30,"analysis":33},1107374,"质量合格的材料、构配件进场后，到其使用或安装时通常要经过一定的时间间隔。在此时间里，（ ）应对施工单位在材料、半成品、构配件的存放、保管及使用期限实行监控。",[425,426,428,430],{"key":20,"text":326,"correct":22},{"key":24,"text":427,"correct":22},"施工单位保管人员",{"key":27,"text":429,"correct":22},"监理员",{"key":30,"text":84,"correct":32},{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},1107375,"工程设备验收前，设备安装单位应提交设备验收方案，包括验收方法、质量标准、验收依据，经（ ）审查同意后实施。",[435,436,437,438],{"key":20,"text":261,"correct":22},{"key":24,"text":84,"correct":32},{"key":27,"text":259,"correct":22},{"key":30,"text":86,"correct":22},{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":30,"analysis":33},1107379,"关于工程实体质量控制，下列说法不正确的是（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"预留钢筋的位置应符合设计要求，预留钢筋的中心线位置允许偏差为5mm内",{"key":24,"text":446,"correct":22},"现浇结构模板安装的表面平整度偏差为5mm，预制构件模板安装的表面平整度偏差为3mm",{"key":27,"text":448,"correct":22},"严禁将洒落的混凝土浇筑到混凝土结构中",{"key":30,"text":450,"correct":32},"可以把模板、预制构件等集中堆放在楼层上",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":27,"analysis":33},1107380,"项目监理机构发现施工单位未按审查通过的工程设计文件施工的，总监理工程师应（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"签发监理通知单",{"key":24,"text":458,"correct":22},"签发工作联系单",{"key":27,"text":460,"correct":32},"签发工程暂停令",{"key":30,"text":462,"correct":22},"提交监理报告",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":27,"analysis":33},1107382,"监理资料的管理应由（ ）负责，并指定专人具体实施。",[467,469,470,471],{"key":20,"text":468,"correct":22},"监理人员",{"key":24,"text":84,"correct":22},{"key":27,"text":86,"correct":32},{"key":30,"text":472,"correct":22},"总监代表",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":27,"analysis":33},1107383,"涉及主体结构及安全的工程变更，要按有关规定报送（ ）审批，否则变更不能实施。",[477,479,480,482],{"key":20,"text":478,"correct":22},"当地建设行政主管部门",{"key":24,"text":249,"correct":22},{"key":27,"text":481,"correct":32},"施工图原审查机构",{"key":30,"text":483,"correct":22},"建设单位主管部门",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":30,"analysis":33},1107384,"钢筋保护层厚度符合设计和规范要求。受力钢筋保护层厚度的合格点率应达到（ ）及以上。",[488,490,492,494],{"key":20,"text":489,"correct":22},"75%",{"key":24,"text":491,"correct":22},"80%",{"key":27,"text":493,"correct":22},"85%",{"key":30,"text":495,"correct":32},"90%",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},1107385,"监理人员发现可能造成质量事故的重大隐患或已发生质量事故的，（ ）应签发工程暂停令。",[500,501,502,503],{"key":20,"text":86,"correct":32},{"key":24,"text":84,"correct":22},{"key":27,"text":53,"correct":22},{"key":30,"text":504,"correct":22},"施工方项目经理",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":30,"analysis":33},1107386,"施工过程中见证取样的试验室应是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"施工单位的试验室",{"key":24,"text":512,"correct":22},"建设单位指定的试验室",{"key":27,"text":514,"correct":22},"监理单位指定的试验室",{"key":30,"text":516,"correct":32},"与承包单位没有行政隶属关系的第三方试验室",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1107387,"（ ）是项目监理机构对施工现场进行的定期或不定期的检查活动，是项目监理机构对工程实施建设监理的方式之一。",[521,523,525,527],{"key":20,"text":522,"correct":22},"旁站",{"key":24,"text":524,"correct":32},"巡视",{"key":27,"text":526,"correct":22},"专检",{"key":30,"text":528,"correct":22},"平行检验",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":30,"analysis":33},1107388,"项目监理机构对工程质量巡视的内容不包括（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":22},"特种作业人员是否持证上岗",{"key":24,"text":536,"correct":22},"施工现场管理人员是否到位",{"key":27,"text":538,"correct":22},"使用的材料、构配件和设备是否合格",{"key":30,"text":540,"correct":32},"监督关键部位、关键工序的施工情况",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1107389,"对于设计单位要求的工程变更，应由建设单位将工程变更设计文件下发项目监理机构，由（ ）组织实施。",[545,546,547,548],{"key":20,"text":84,"correct":22},{"key":24,"text":86,"correct":32},{"key":27,"text":429,"correct":22},{"key":30,"text":549,"correct":22},"总监理工程师或专业监理工程师",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1107390,"根据住房和城乡建设部发布的《工程质量安全手册（试行）》，项目监理机构安全生产的监理行为不满足的要求是的（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":32},"按规定编制监理规划和安全监理大纲",{"key":24,"text":557,"correct":22},"按规定审查施工组织设计中的安全技术措施或者专项施工方案",{"key":27,"text":559,"correct":22},"按规定审核各相关单位资质、安全生产许可证、“安管人员”安全生产考核合格证书和特种作业人员操作资格证书并做好记录",{"key":30,"text":561,"correct":22},"发现安全事故隐患严重且施工单位拒不整改或者不停止施工的，应及时向政府主管部门报告",[563,566,569,572,575,578],{"id":15,"name":564,"category":7,"favorite":565},"领导干部任职前廉政法规知识测试题",92,{"id":567,"name":568,"category":7,"favorite":15},595,"建筑结构与设备",{"id":570,"name":571,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":573,"name":574,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":576,"name":577,"category":7,"favorite":8},534,"BIM工程师",{"id":579,"name":577,"category":7,"favorite":8},535]