[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":559},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,38,50,2641,[13,34,46,58,70,82,92,104,116,128,138,150,162,172,184,194,206,218,230,241,253,265,275,287,296,308,320,329,337,349,361,369,377,385,397,409,421,430,439,451,459,470,480,489,498,506,516,527,535,547],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1109220,1,"单选题","（2020年真题）关于设计阶段划分的说法，正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","民用建筑项目，应分为方案设计、施工图设计和施工设计三个阶段",false,{"key":24,"text":25,"correct":22},"B","能源建设项目，按合同约定可以不做初步设计，直接进行施工图设计",{"key":27,"text":28,"correct":29},"C","工业建设项目，一般分为初步设计和施工图设计两个阶段",true,{"key":31,"text":32,"correct":22},"D","简单的民用建筑项目，初步设计之后应增加单项技术设计阶段","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1109221,"（2020年真题）在工程勘察阶段，监理单位可进行的工作是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"协助建设单位编制勘察任务书",{"key":24,"text":41,"correct":22},"编写《勘察方案》",{"key":27,"text":43,"correct":22},"参与建设工程质量事故分析",{"key":31,"text":45,"correct":22},"编写《勘察细则》",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1109222,"在工程施工质量验收中，为了更加科学地评价工程施工质量，按（ ）原则可将单位工程划分为若干个分部工程。",[50,52,54,56],{"key":20,"text":51,"correct":22},"设计图纸",{"key":24,"text":53,"correct":22},"重要程度",{"key":27,"text":55,"correct":22},"投资估算",{"key":31,"text":57,"correct":29},"结构分解",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1109223,"根据《建筑工程施工质量验收统一标准》GB 50300--2013，安装工程的检验批一般按（ ）划分。",[62,64,66,68],{"key":20,"text":63,"correct":22},"专业性质",{"key":24,"text":65,"correct":29},"设备组别",{"key":27,"text":67,"correct":22},"专业系统",{"key":31,"text":69,"correct":22},"主要工种",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1109226,"根据《建筑工程施工质量验收统一标准》，具备独立施工条件并能形成独立使用功能的建筑物或构筑物可划分为一个( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"单项工程",{"key":24,"text":77,"correct":22},"分部工程",{"key":27,"text":79,"correct":29},"单位工程",{"key":31,"text":81,"correct":22},"子分部工程",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1109227,"从工程施工质量验收划分角度讲，一所学校中的一栋教学楼是一个（ ）。",[86,87,88,90],{"key":20,"text":79,"correct":29},{"key":24,"text":77,"correct":22},{"key":27,"text":89,"correct":22},"分项工程",{"key":31,"text":91,"correct":22},"检验批",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1109228,"建设工程质量验收时，室外工程可根据专业类别和工程规模划分子单位工程，下列不属于室外工程子单位工程的是（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":22},"附属建筑工程",{"key":24,"text":99,"correct":29},"室外供电系统",{"key":27,"text":101,"correct":22},"边坡",{"key":31,"text":103,"correct":22},"室外环境",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},1109230,"一般项目中，错判概率a和漏判概率β的概率范围是（）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"α、β均不宜超过5％",{"key":24,"text":111,"correct":22},"α、β均不宜超过10％",{"key":27,"text":113,"correct":29},"α不宜超过5％、β不宜超过10％",{"key":31,"text":115,"correct":22},"α不宜超过10％、β不宜超过5％",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":27,"analysis":33},1109233,"隐蔽工程验收合格时，签认隐蔽工程报审、报验表及质量验收记录的是（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"施工单位质检员",{"key":24,"text":123,"correct":22},"施工单位技术负责人",{"key":27,"text":125,"correct":29},"专业监理工程师",{"key":31,"text":127,"correct":22},"总监理工程师",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1109234,"分部工程应由（ ）组织相关人员进行验收。",[132,133,134,136],{"key":20,"text":127,"correct":29},{"key":24,"text":125,"correct":22},{"key":27,"text":135,"correct":22},"建设单位代表",{"key":31,"text":137,"correct":22},"施工项目经理",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1109236,"关于钢筋连接的一般项目，下列说法正确的是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"钢筋的接头宜设置在受力较大处",{"key":24,"text":145,"correct":22},"不同纵向受力钢筋不宜设置两个或两个以上接头",{"key":27,"text":147,"correct":29},"接头末端至钢筋弯起点的距离不应小于钢筋直径的10倍",{"key":31,"text":149,"correct":22},"接头首端至钢筋弯起点的距离应大于钢筋直径的10倍",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":27,"analysis":33},1109237,"对钢筋隐蔽工程进行验收，其内容不包括（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"钢筋的连接方式、接头位置等",{"key":24,"text":157,"correct":22},"纵向受力钢筋的品种、规格、数量和位置",{"key":27,"text":159,"correct":29},"钢筋隐蔽工程质量验收记录",{"key":31,"text":161,"correct":22},"预埋件的规格、数量、位置等",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":20,"analysis":33},1109239,"单位工程的验收应由（ ）组织。",[166,168,169,170],{"key":20,"text":167,"correct":29},"建设单位项目负责人",{"key":24,"text":127,"correct":22},{"key":27,"text":125,"correct":22},{"key":31,"text":171,"correct":22},"项目负责人",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":31,"analysis":33},1109240,"关于分部工程观感质量验收的说法中，错误的是（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":22},"只能以观察、触摸或简单量测的方式结合人的主观判断",{"key":24,"text":179,"correct":22},"综合评价“好”是指在观感质量符合验收规范的基础上，能到达精致、细部处理到位等要求",{"key":27,"text":181,"correct":22},"综合评价“一般”是指观感质量能符合验收规范的要求",{"key":31,"text":183,"correct":29},"综合评价“差”是指观感质量勉强达到验收规范要求，但影响安全或使用功能",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":27,"analysis":33},1109241,"当隐蔽工程为检验批时，隐蔽工程应由（ ）组织施工单位项目专业质量检查员、专业工长等进行验收。",[188,190,191,192],{"key":20,"text":189,"correct":22},"建设单位负责人",{"key":24,"text":127,"correct":22},{"key":27,"text":125,"correct":29},{"key":31,"text":193,"correct":22},"项目经理",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},1109242,"在单位工程质量验收合格的规定中，（）是客观评价工程质量的主要依据。",[198,200,202,204],{"key":20,"text":199,"correct":22},"所含分部工程的质量均验收合格",{"key":24,"text":201,"correct":29},"质量控制资料完整",{"key":27,"text":203,"correct":22},"观感质量符合要求",{"key":31,"text":205,"correct":22},"所含分部工程中有关安全、节能、环境保护和主要使用功能的检验资料完整",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":20,"analysis":33},1109243,"在《建筑工程施工质量验收统一标准》中，（ ）是指建筑工程中对安全、节能、环境保护和主要使用功能起决定性作用的检验项目。",[210,212,214,216],{"key":20,"text":211,"correct":29},"主控项目",{"key":24,"text":213,"correct":22},"一般项目",{"key":27,"text":215,"correct":22},"重点项目",{"key":31,"text":217,"correct":22},"基本项目",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":20,"analysis":33},1109247,"施工质量不合格经加固补强的分项、分部工程，通过改变外形尺寸但能满足安全使用要求的，可按( )和协商文件进行验收。",[222,224,226,228],{"key":20,"text":223,"correct":29},"技术处理方案",{"key":24,"text":225,"correct":22},"设计单位意见",{"key":27,"text":227,"correct":22},"设计变更处理",{"key":31,"text":229,"correct":22},"质量事故责任",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":24,"analysis":33},1109248,"经返修或加固的分项、分部工程，虽然改变了外形尺寸但仍能满足安全使用的要求，可以按技术处理方案和（ ）进行验收。",[234,235,237,239],{"key":20,"text":225,"correct":22},{"key":24,"text":236,"correct":29},"协商文件",{"key":27,"text":238,"correct":22},"建设单位意见",{"key":31,"text":240,"correct":22},"质量监督部门意见",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":31,"analysis":33},1109249,"下列关于工程施工质量验收不符合要求的处理，说法正确的是（）。",[245,247,249,251],{"key":20,"text":246,"correct":22},"经返工或返修的检验批，应协商后进行验收",{"key":24,"text":248,"correct":22},"有资质的检测机构和建设单位鉴定能够到达设计要求的检验批，予以验收",{"key":27,"text":250,"correct":22},"有资质的检测机构鉴定达不到设计要求，但经建设单位核算认可能够满足安全和使用功能的检验批，予以验收",{"key":31,"text":252,"correct":29},"工程质量控制资料应齐全完整",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":20,"analysis":33},1109252,"在建筑工程施工质量验收时，对涉及结构安全和使用功能的重要分部工程应进行（ ）检测。",[257,259,261,263],{"key":20,"text":258,"correct":29},"抽样",{"key":24,"text":260,"correct":22},"全数",{"key":27,"text":262,"correct":22},"无损",{"key":31,"text":264,"correct":22},"见证取样",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":24,"analysis":33},1109253,"根据《建设工程监理规范》，单位工程完工后，工程竣工验收应由()组织相关人员进行。",[269,270,271,273],{"key":20,"text":127,"correct":22},{"key":24,"text":167,"correct":29},{"key":27,"text":272,"correct":22},"总监理工程师代表",{"key":31,"text":274,"correct":22},"施工单位项目负责人",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":20,"analysis":33},1109254,"根据《建筑工程施工质量验收统一标准》，单位工程质量竣工验收记录表中的综合验收结论由()填写。",[279,281,283,285],{"key":20,"text":280,"correct":29},"建设单位",{"key":24,"text":282,"correct":22},"监理单位",{"key":27,"text":284,"correct":22},"施工单位",{"key":31,"text":286,"correct":22},"设计单位",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":24,"analysis":33},1109255,"根据《建筑工程施工质量验收统一标准》，电梯工程质量验收应由()组织。",[291,293,294,295],{"key":20,"text":292,"correct":22},"安装单位技术负责人",{"key":24,"text":127,"correct":29},{"key":27,"text":274,"correct":22},{"key":31,"text":125,"correct":22},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},1109256,"根据《建筑工程施工质量验收统一标准》，对于采用计数抽样的检验批一般项目的验收，合格点率应符合()的规定。",[300,302,304,306],{"key":20,"text":301,"correct":22},"质量验收统一标准",{"key":24,"text":303,"correct":22},"工程技术规程",{"key":27,"text":305,"correct":22},"建设工程监理规范",{"key":31,"text":307,"correct":29},"专业验收规范",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":24,"analysis":33},1109257,"根据《建筑工程施工质量验收统一标准》，分项工程应按()划分。",[312,314,316,318],{"key":20,"text":313,"correct":22},"工程量、施工程序",{"key":24,"text":315,"correct":29},"主要工种、施工工艺",{"key":27,"text":317,"correct":22},"工程部位、施工特点",{"key":31,"text":319,"correct":22},"专业性质、楼层",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},1109258,"根据《建筑工程施工质量验收统一标准》，符合专业验收规范规定适当调整试验数量的实施方案，需报()审核确认。",[324,325,326,328],{"key":20,"text":280,"correct":22},{"key":24,"text":284,"correct":22},{"key":27,"text":327,"correct":29},"项目监理机构",{"key":31,"text":286,"correct":22},{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},1109259,"根据《建筑工程施工质量验收统一标准》，验收规范对工程验收项目未作出相应规定的，应由()组织相关单位制定专项验收要求。",[333,334,335,336],{"key":20,"text":280,"correct":29},{"key":24,"text":282,"correct":22},{"key":27,"text":284,"correct":22},{"key":31,"text":286,"correct":22},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},1109260,"工程竣工预验收合格后，项目监理机构应向建设单位提交()。",[341,343,345,347],{"key":20,"text":342,"correct":22},"工程预验收合格报告",{"key":24,"text":344,"correct":22},"工程竣工报告",{"key":27,"text":346,"correct":22},"工程竣工验收报告",{"key":31,"text":348,"correct":29},"工程质量评估报告",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},1109261,"工程施工过程中，采用计数抽样检验时，检验批容量为20 时的最小抽样数量是()。",[353,355,357,359],{"key":20,"text":354,"correct":22},"2",{"key":24,"text":356,"correct":29},"3",{"key":27,"text":358,"correct":22},"5",{"key":31,"text":360,"correct":22},"8",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":31,"analysis":33},1109262,"工程施工过程中，同一项目重复利用同一抽样对象已有检验成果的实施方案时，应事先报()认可。",[365,366,367,368],{"key":20,"text":280,"correct":22},{"key":24,"text":286,"correct":22},{"key":27,"text":284,"correct":22},{"key":31,"text":327,"correct":29},{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":27,"analysis":33},1109263,"工程施工前，检验批的划分方案应由()审核。",[373,374,375,376],{"key":20,"text":284,"correct":22},{"key":24,"text":280,"correct":22},{"key":27,"text":327,"correct":29},{"key":31,"text":286,"correct":22},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},1109264,"工程施工质量验收的最小单位是()。",[381,382,383,384],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":29},{"key":27,"text":75,"correct":22},{"key":31,"text":77,"correct":22},{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},1109265,"在单位工程的质量验收中，对于涉及结构安全和使用功能的分部工程应进行()。",[389,391,393,395],{"key":20,"text":390,"correct":22},"见证取样检测",{"key":24,"text":392,"correct":22},"主控项目的复查",{"key":27,"text":394,"correct":22},"抽样检测",{"key":31,"text":396,"correct":29},"检验资料检查",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},1109266,"建设单位应当在竣工验收（ ）前，将验收的时间、地点及验收方案书面报送工程质量监督机构。",[401,403,405,407],{"key":20,"text":402,"correct":29},"7个工作日",{"key":24,"text":404,"correct":22},"7日",{"key":27,"text":406,"correct":22},"15个工作日",{"key":31,"text":408,"correct":22},"15日",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1109267,"下列城市轨道交通建设工程竣工验收的内容和程序中，说法正确的是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"施工单位应在竣工验收合格15日后，签订工程质量保修书",{"key":24,"text":416,"correct":29},"建设单位应在竣工验收合格之日起15个工作日内，将竣工验收报告和相关文件，报城市建设主管部门备案",{"key":27,"text":418,"correct":22},"施工单位汇报试运行情况",{"key":31,"text":420,"correct":22},"建设单位代表进行专项验收工作总结",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":31,"analysis":33},1109269,"施工单位对于质量缺陷的维修过程，（）应予监督，合格后应予以签认。",[425,426,427,429],{"key":20,"text":280,"correct":22},{"key":24,"text":286,"correct":22},{"key":27,"text":428,"correct":22},"质量监督机构",{"key":31,"text":282,"correct":29},{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},1109271,"在工程保修阶段，（）应对工程质量缺陷原因进行调查，组织相关单位对于质量缺陷责任归属进行界定。",[434,435,436,437],{"key":20,"text":282,"correct":29},{"key":24,"text":284,"correct":22},{"key":27,"text":280,"correct":22},{"key":31,"text":438,"correct":22},"建设主管部门",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},1109272,"关于工程质量保证金，下列说法中正确的是（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"质量保证金总预留比例不得高于签约合同价的3%",{"key":24,"text":446,"correct":29},"已经缴纳履约保证金的，不得同时预留质量保证金",{"key":27,"text":448,"correct":22},"采用工程质量保证担保的，预留质保金不得高于合同价的2%",{"key":31,"text":450,"correct":22},"质量保证金的返还期限一般为2年",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":24,"analysis":33},1109273,"按《建筑工程施工质量验收统一标准》的规定，依专业性质、工程部位来划分的工程属于（ ）。",[455,456,457,458],{"key":20,"text":79,"correct":22},{"key":24,"text":77,"correct":29},{"key":27,"text":89,"correct":22},{"key":31,"text":91,"correct":22},{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":24,"analysis":33},1109274,"在工程施工质量验收层次中，检验批的划分依据不包括（ ）。",[463,465,466,468],{"key":20,"text":464,"correct":22},"工程量",{"key":24,"text":69,"correct":29},{"key":27,"text":467,"correct":22},"施工段",{"key":31,"text":469,"correct":22},"变形缝",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},1109275,"根据施工质量验收的规定，施工现场质量管理检查记录表应由施工单位填写，然后由（ ）做出检查结论。",[474,475,476,478],{"key":20,"text":127,"correct":29},{"key":24,"text":125,"correct":22},{"key":27,"text":477,"correct":22},"现场监理员",{"key":31,"text":479,"correct":22},"施工单位质量负责人",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1109276,"单位工程质量竣工综合验收结论由（ ）填写，并对工程质量作出评价。",[484,486,487,488],{"key":20,"text":485,"correct":22},"参加验收各方共同",{"key":24,"text":280,"correct":29},{"key":27,"text":284,"correct":22},{"key":31,"text":282,"correct":22},{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":27,"analysis":33},1109277,"对验收合格的检验批，（ ）应签认检验批报审、报验表及质量验收记录，准许进行下道工序施工。",[493,494,495,496],{"key":20,"text":280,"correct":22},{"key":24,"text":127,"correct":22},{"key":27,"text":125,"correct":29},{"key":31,"text":497,"correct":22},"项目专业技术负责人",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},1109278,"分项工程应由（ ）组织施工单位项目专业技术负责人等进行验收。",[502,503,504,505],{"key":20,"text":127,"correct":22},{"key":24,"text":125,"correct":29},{"key":27,"text":193,"correct":22},{"key":31,"text":189,"correct":22},{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":27,"analysis":33},1109279,"在分部工程质量验收时，对于观感质量评价结论为“差”的( )，应通过返修处理进行补救。",[510,511,512,514],{"key":20,"text":91,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":513,"correct":29},"检查点",{"key":31,"text":515,"correct":22},"控制点",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},1109280,"单位工程验收时，对主要使用功能进行抽查是在（ ）的基础上由参加验收的各方人员商定的。",[520,522,524,525],{"key":20,"text":521,"correct":22},"分部工程验收合格",{"key":24,"text":523,"correct":29},"检查资料文件",{"key":27,"text":203,"correct":22},{"key":31,"text":526,"correct":22},"建设单位签署意见",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":20,"analysis":33},1109281,"对验收合格的分部工程，（ ）签认分部工程报验表及验收记录。",[531,532,533,534],{"key":20,"text":127,"correct":29},{"key":24,"text":125,"correct":22},{"key":27,"text":193,"correct":22},{"key":31,"text":497,"correct":22},{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},1109282,"建筑工程施工质量验收中，经返工或返修的检验批，应（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"予以验收",{"key":24,"text":542,"correct":29},"重新进行验收",{"key":27,"text":544,"correct":22},"鉴定验收",{"key":31,"text":546,"correct":22},"协商验收",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1109283,"检验批质量验收时，对于一般的质量缺陷可通过返修或更换予以解决，施工单位采取相应措施整改完后，该检验批应( )进行验收。",[551,553,555,557],{"key":20,"text":552,"correct":29},"重新",{"key":24,"text":554,"correct":22},"协商后",{"key":27,"text":556,"correct":22},"经检测鉴定后",{"key":31,"text":558,"correct":22},"在设计单位到场后",[560,563,566,569,572,575],{"id":15,"name":561,"category":7,"favorite":562},"领导干部任职前廉政法规知识测试题",92,{"id":564,"name":565,"category":7,"favorite":15},595,"建筑结构与设备",{"id":567,"name":568,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":570,"name":571,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":573,"name":574,"category":7,"favorite":8},534,"BIM工程师",{"id":576,"name":574,"category":7,"favorite":8},535]