[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-37":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":554},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,37,50,2641,[13,34,46,58,70,80,92,104,113,125,134,146,156,166,174,186,198,207,217,228,239,247,259,267,278,288,296,308,320,329,341,353,365,375,387,399,411,423,435,447,456,465,474,482,494,506,518,526,534,546],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1109165,1,"单选题","（2016年真题）下列报审、报验表中，需要建设单位签署审批意见的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","分包单位资格报审表",false,{"key":24,"text":25,"correct":22},"B","施工进度计划报审表",{"key":27,"text":28,"correct":22},"C","分项工程报验表",{"key":30,"text":31,"correct":32},"D","工程复工报审表",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1109166,"（2016年真题）项目监理机构审查施工单位报送的工程材料、构配件、设备报审表时，应重点审查（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"采购合同",{"key":24,"text":41,"correct":22},"技术标准",{"key":27,"text":43,"correct":32},"质量证明文件",{"key":30,"text":45,"correct":22},"设计文件要求",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1109167,"（2016年真题）项目监理机构收到施工单位报送的施工控制测量成果报验表后，应由（ ）签署审查意见。",[50,52,54,56],{"key":20,"text":51,"correct":22},"总监理工程师",{"key":24,"text":53,"correct":22},"监理单位技术负责人",{"key":27,"text":55,"correct":32},"专业监理工程师",{"key":30,"text":57,"correct":22},"监理员",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1109168,"（2016年真题）用于工程的进口材料、构配件和设备，按合同约定需要进行联合检查验收的，应由（ ）提出联合检查验收申 请。",[62,64,66,68],{"key":20,"text":63,"correct":32},"施工单位",{"key":24,"text":65,"correct":22},"项目监理机构",{"key":27,"text":67,"correct":22},"供货单位",{"key":30,"text":69,"correct":22},"建设单位",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1109169,"（2017年真题）分包单位资格报审表中的审核意见应由（ ）签署。",[74,76,78,79],{"key":20,"text":75,"correct":22},"建设单位项目负责人",{"key":24,"text":77,"correct":22},"施工单位项目负责人",{"key":27,"text":55,"correct":22},{"key":30,"text":51,"correct":32},{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},1109170,"（2017年真题）根据《建设工程监理规范》GB\u002FT 50319—2013，项目监理机构应根据工程特点和（ ）确定需要旁站的关键部位、关键工序。",[84,86,88,90],{"key":20,"text":85,"correct":22},"监理实施细则",{"key":24,"text":87,"correct":32},"施工组织设计",{"key":27,"text":89,"correct":22},"监理规划",{"key":30,"text":91,"correct":22},"设计图纸",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1109171,"（2017年真题）工程监理实施过程中，总监理工程师应签发工程暂停令的情形是（ ）",[96,98,100,102],{"key":20,"text":97,"correct":32},"施工单位未经批准擅自施工",{"key":24,"text":99,"correct":22},"施工存在质量事故隐患",{"key":27,"text":101,"correct":22},"施工单位采用不适当的施工工艺",{"key":30,"text":103,"correct":22},"施工单位未按施工方案施工",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},1109172,"（2017年真题）工程开工前，施工图纸会审会议应由（ ）主持召开。",[108,109,110,111],{"key":20,"text":65,"correct":22},{"key":24,"text":63,"correct":22},{"key":27,"text":69,"correct":32},{"key":30,"text":112,"correct":22},"设计单位",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":24,"analysis":33},1109173,"（2017年真题）工程中采用新工艺、新材料的，应有（ ）及有关质量数据。",[117,119,121,123],{"key":20,"text":118,"correct":22},"施工单位组织的专家论证意见",{"key":24,"text":120,"correct":32},"权威性技术部门的技术鉴定书",{"key":27,"text":122,"correct":22},"设计单位组织的专家论证意见",{"key":30,"text":124,"correct":22},"建设单位组织的专家论证意见",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":30,"analysis":33},1109174,"（2017年真题）经项目监理机构审查合格的工程项目施工组织设计，应由（ ）签认。",[129,130,131,132],{"key":20,"text":53,"correct":22},{"key":24,"text":51,"correct":22},{"key":27,"text":75,"correct":22},{"key":30,"text":133,"correct":32},"总监理工程师代表",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":24,"analysis":33},1109175,"（2017年真题）总监理工程师应在工程开工日期（ ）天前向施工单位发出工程开工令。",[138,140,142,144],{"key":20,"text":139,"correct":22},"5",{"key":24,"text":141,"correct":32},"7",{"key":27,"text":143,"correct":22},"10",{"key":30,"text":145,"correct":22},"14",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":27,"analysis":33},1109176,"（2018年真题）根据《建设工程监理规范》GB\u002FT 50319—2013，总监理工程师应签发工程暂停令的情形是（ ）。",[150,151,152,154],{"key":20,"text":99,"correct":22},{"key":24,"text":103,"correct":22},{"key":27,"text":153,"correct":32},"施工单位未按审查通过的工程设计文件施工",{"key":30,"text":155,"correct":22},"施工不当造成工程质量缺陷",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":24,"analysis":33},1109177,"（2018年真题）工程开工报审表及相关资料经总监理工程师签认并报送（ ）批准后，总监理工程师方可签发工程开工令。",[160,162,163,164],{"key":20,"text":161,"correct":22},"监理单位",{"key":24,"text":69,"correct":32},{"key":27,"text":63,"correct":22},{"key":30,"text":165,"correct":22},"工程质量监督机构",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1109178,"（2018年真题）工程开工前，应由（ ）组织召开工程设计技术交底会议。",[170,171,172,173],{"key":20,"text":112,"correct":22},{"key":24,"text":63,"correct":22},{"key":27,"text":69,"correct":32},{"key":30,"text":161,"correct":22},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":27,"analysis":33},1109179,"（2018年真题）工程施工过程中，对已进场但检验不合格的工程材料，项目监理机构应要求施工单位（ ）",[178,180,182,184],{"key":20,"text":179,"correct":22},"停工整改并封存不合格材料",{"key":24,"text":181,"correct":22},"征求设计单位对不合格材料的使用意见",{"key":27,"text":183,"correct":32},"限期将不合格材料撤出施工现场",{"key":30,"text":185,"correct":22},"征求检测机构对不合格材料的使用意见",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},1109180,"（2018年真题）下列文件，不能作为项目监理机构施工质量控制依据的是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"部门规章与规范性文件",{"key":24,"text":193,"correct":32},"会议纪要",{"key":27,"text":195,"correct":22},"工程合同文件",{"key":30,"text":197,"correct":22},"技术规程",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},1109181,"（2018年真题）用于工程的进口设备进场后，应由（ ）组织相关单位进行联合检查验收。",[202,203,204,205],{"key":20,"text":69,"correct":22},{"key":24,"text":65,"correct":32},{"key":27,"text":63,"correct":22},{"key":30,"text":206,"correct":22},"设备供应单位",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":24,"analysis":33},1109182,"（2019年真题）根据《建设工程监理规范》，下列工程资料中，需要建设单位签署审批意见的是（ ）。",[211,212,213,215],{"key":20,"text":89,"correct":22},{"key":24,"text":87,"correct":32},{"key":27,"text":214,"correct":22},"工程暂停令",{"key":30,"text":216,"correct":22},"超过一定规模的危险性较大的分部分项工程专项施工方案",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":24,"analysis":33},1109183,"（2019年真题）根据《建设工程监理规范》，下列施工单位报审表中，需要总监理工程师签字并加盖执业印章的是（ ）。",[221,223,225,227],{"key":20,"text":222,"correct":22},"监理通知回复单",{"key":24,"text":224,"correct":32},"施工组织设计报审表",{"key":27,"text":226,"correct":22},"分部工程报验表",{"key":30,"text":31,"correct":22},{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":27,"analysis":33},1109184,"（2019年真题）根据《建设工程监理规范》，项目监理机构应根据工程特点和（ ），确定旁站的关键部位和关键工序。",[232,233,235,237],{"key":20,"text":89,"correct":22},{"key":24,"text":234,"correct":22},"监理细则",{"key":27,"text":236,"correct":32},"施工单位报送的施工组织设计",{"key":30,"text":238,"correct":22},"监理合同",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":24,"analysis":33},1109185,"（2019年真题）根据《建设工程监理规范》GB\u002FT 50319—2013，下列施工单位报审表中，需要总监理工程师签字并加盖执业印章的是（ ）。",[243,244,245,246],{"key":20,"text":222,"correct":22},{"key":24,"text":224,"correct":32},{"key":27,"text":226,"correct":22},{"key":30,"text":31,"correct":22},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},1109186,"（2019年真题）根据《建设工程监理规范》GB\u002FT 50319—2013，下列施工控制测量成果及保护措施中，项目监理机构复核的内容不包括（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"施工单位测量人员的资格证书",{"key":24,"text":254,"correct":22},"施工平面控制网的测量成果",{"key":27,"text":256,"correct":32},"测量设备的养护记录",{"key":30,"text":258,"correct":22},"控制桩的保护措施",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},1109187,"（2019年真题）根据《建设工程监理规范》GB／T 50319—2013，项目监理机构应将已审核签认的施工组织设计报送（ ）。",[263,264,265,266],{"key":20,"text":165,"correct":22},{"key":24,"text":69,"correct":32},{"key":27,"text":161,"correct":22},{"key":30,"text":63,"correct":22},{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":30,"analysis":33},1109188,"（2019年真题）工程施工工期应自（ ）中载明的开工日期起计算。",[271,273,274,276],{"key":20,"text":272,"correct":22},"工程开工报审表",{"key":24,"text":224,"correct":22},{"key":27,"text":275,"correct":22},"施工控制测量成果报验表",{"key":30,"text":277,"correct":32},"工程开工令",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},1109189,"（2019年真题）在施工单位提交的下列报审表、报验表中，专业监理工程师签署意见后，总监理工程师还应签署审核意见的是（ ）。",[282,283,284,286],{"key":20,"text":21,"correct":32},{"key":24,"text":275,"correct":22},{"key":27,"text":285,"correct":22},"分项工程质量报验表",{"key":30,"text":287,"correct":22},"工程材料、构配件、设备报审表",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},1109190,"（2020年真题）根据《危险性较大的分部分项工程安全管理规定》，针对超过一定规模的危险性较大的分部分项工程专项施工方案，负责组织召开专家论证会的单位是（ ）。",[292,293,294,295],{"key":20,"text":69,"correct":22},{"key":24,"text":63,"correct":32},{"key":27,"text":161,"correct":22},{"key":30,"text":165,"correct":22},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":30,"analysis":33},1109191,"（2020年真题）关于钢筋混凝土工程施工的说法，正确的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"施工缝浇筑混凝土时，不应清除表面的浮浆",{"key":24,"text":303,"correct":22},"焊接连接接头试件应从试焊试验件中截取",{"key":27,"text":305,"correct":22},"圆形箍筋两端均应做成不大于45°的弯钩",{"key":30,"text":307,"correct":32},"受力钢筋保护层厚度的合格点率应达到90%及以上",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":30,"analysis":33},1109193,"工程勘察工作的阶段划分不包括（）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"选址勘察",{"key":24,"text":315,"correct":22},"初步勘察",{"key":27,"text":317,"correct":22},"详细勘察",{"key":30,"text":319,"correct":32},"决策性勘察",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},1109194,"工程勘察工作中，通过搜集、分析已有资料，进行现场踏勘的阶段是（）。",[324,325,326,327],{"key":20,"text":313,"correct":32},{"key":24,"text":315,"correct":22},{"key":27,"text":317,"correct":22},{"key":30,"text":328,"correct":22},"现场勘察",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},1109196,"承担勘察阶段相关服务的监理单位，应协助建设单位编制( )和选择工程勘察单位。",[333,335,337,339],{"key":20,"text":334,"correct":32},"工程勘察任务书",{"key":24,"text":336,"correct":22},"工程勘察工作计划",{"key":27,"text":338,"correct":22},"工程勘察方案",{"key":30,"text":340,"correct":22},"工程勘察成果评估报告",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":30,"analysis":33},1109197,"项目监理机构对勘察成果的审查是勘察阶段质量控制最重要的工作，下列属于技术性审查内容的是（）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"工程勘察成果应齐全、可靠",{"key":24,"text":348,"correct":22},"工程勘察资料、图表、报告等文件要依据工程类别按有关规定执行各级审核、审批程序，并由负责人签字",{"key":27,"text":350,"correct":22},"工程勘察成果必须严格按照质量管理有关程序进行检查和验收",{"key":30,"text":352,"correct":32},"针对不同勘察阶段，对工程勘察报告的深度和内容进行检查",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1109198,"工程勘察过程中，项目监理机构在勘察阶段质量控制最重要的工作是（）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"协助建设单位优选勘察单位",{"key":24,"text":360,"correct":32},"勘察成果的审查",{"key":27,"text":362,"correct":22},"审核勘察单位提交的勘察工作方案",{"key":30,"text":364,"correct":22},"控制勘察现场作业",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":30,"analysis":33},1109199,"目的是要通过搜集、分析已有资料，进行现场踏勘的是()。",[369,370,371,373],{"key":20,"text":317,"correct":22},{"key":24,"text":315,"correct":22},{"key":27,"text":372,"correct":22},"试验",{"key":30,"text":374,"correct":32},"可行性研究勘察",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},1109201,"详细勘察应对地基基础处理与加固、不良地质现象的防治工程进行岩士工程计算与评价,满足()的要求。",[379,381,383,385],{"key":20,"text":380,"correct":22},"初步设计",{"key":24,"text":382,"correct":32},"施工图设计",{"key":27,"text":384,"correct":22},"场地方案确定",{"key":30,"text":386,"correct":22},"扩大初步设计",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},1109202,"要结合投资概算资料进行技术经济比选和多方案论证，确保工程质量、投资和进度目标的实现，属于设计方案评审中的（ ）。",[391,393,395,397],{"key":20,"text":392,"correct":22},"总体方案评审",{"key":24,"text":394,"correct":22},"专业设计方案评审",{"key":27,"text":396,"correct":32},"设计方案审核",{"key":30,"text":398,"correct":22},"施工图设计评审",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},1109203,"工程监理单位协助建设单位组织设计方案评审时，对总体方案评审的重点是()。",[403,405,407,409],{"key":20,"text":404,"correct":32},"设计规模",{"key":24,"text":406,"correct":22},"施工进度",{"key":27,"text":408,"correct":22},"设计深度",{"key":30,"text":410,"correct":22},"材料选型",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},1109204,"评审工程初步设计成果时，重点评审的是()。",[415,417,419,421],{"key":20,"text":416,"correct":32},"总平面布置是否充分考虑方向、风向、采光等要素",{"key":24,"text":418,"correct":22},"设计参数、设计标准、功能和使用价值",{"key":27,"text":420,"correct":22},"新材料、新技术在相关部门的备案情况",{"key":30,"text":422,"correct":22},"使用功能是否满足质量目标和标准",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":30,"analysis":33},1109205,"下列不属于施工图设计评审内容的是（）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"总体审核",{"key":24,"text":430,"correct":22},"设计总说明审查",{"key":27,"text":432,"correct":22},"施工设计图审查",{"key":30,"text":434,"correct":32},"施工图概算和总投资概算审查",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},1109206,"施工图设计评审的总体审核中，首先应审核（）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"工艺合理性",{"key":24,"text":442,"correct":32},"施工图纸的完整性及各级的签字盖章",{"key":27,"text":444,"correct":22},"总图在平面和空间布置上是否有交叉和矛盾",{"key":30,"text":446,"correct":22},"工艺流程及装置是否满足规范",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},1109207,"工程设计阶段，通常对专业性较强或有行业专门资质要求的项目，应委托专业设计单位出具深化设计图纸，并经()会签确认后方可实施。",[451,452,453,455],{"key":20,"text":69,"correct":22},{"key":24,"text":161,"correct":22},{"key":27,"text":454,"correct":32},"总体设计单位",{"key":30,"text":63,"correct":22},{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":27,"analysis":33},1109209,"对工程地质条件复杂或有特殊施工要求的重要工程，除一般勘察外，还应进行（）。",[460,461,462,464],{"key":20,"text":313,"correct":22},{"key":24,"text":315,"correct":22},{"key":27,"text":463,"correct":32},"施工勘察",{"key":30,"text":317,"correct":22},{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1109210,"（）阶段应对基础设计、地基基础处理与加固、不良地质现象的防治工程等具体方案作出岩土工程计算与评价，以满足施工图设计的要求。",[469,470,471,472],{"key":20,"text":374,"correct":22},{"key":24,"text":317,"correct":32},{"key":27,"text":315,"correct":22},{"key":30,"text":473,"correct":22},"深入勘察",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":30,"analysis":33},1109211,"评审工程施工图设计评审成果时，重点评审的是()。",[478,479,480,481],{"key":20,"text":416,"correct":22},{"key":24,"text":418,"correct":22},{"key":27,"text":420,"correct":22},{"key":30,"text":422,"correct":32},{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":30,"analysis":33},1109212,"工程监理单位在工程勘察阶段控制质量，最重要的工作是审查()。",[486,488,490,492],{"key":20,"text":487,"correct":22},"勘察方案",{"key":24,"text":489,"correct":22},"勘察任务书",{"key":27,"text":491,"correct":22},"勘察合同",{"key":30,"text":493,"correct":32},"勘察成果",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":27,"analysis":33},1109213,"为设计提供的外部协作条件，随建设项目情况有所不同，一般不包括以下( )方面。",[498,500,502,504],{"key":20,"text":499,"correct":22},"集散条件",{"key":24,"text":501,"correct":22},"原料、材料、燃料等供应",{"key":27,"text":503,"correct":32},"现场工作和生活用房",{"key":30,"text":505,"correct":22},"动力供应",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},1109214,"项目总概算应控制在可行性研究报告估算投资额的（ ）以内。",[510,512,514,516],{"key":20,"text":511,"correct":22},"±5%",{"key":24,"text":513,"correct":32},"±10%",{"key":27,"text":515,"correct":22},"±15%",{"key":30,"text":517,"correct":22},"±20%",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":27,"analysis":33},1109215,"结合投资概算资料进行技术经济比较和多方案论证，确保工程质量、投资、进度目标的实现，属于设计方案评审的（ ）。",[522,523,524,525],{"key":20,"text":392,"correct":22},{"key":24,"text":394,"correct":22},{"key":27,"text":396,"correct":32},{"key":30,"text":398,"correct":22},{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1109216,"重点审核设计方案的设计参数、设计标准、设备选型和结构造型、功能和使用价值，属于设计方案评审的（ ）。",[530,531,532,533],{"key":20,"text":392,"correct":22},{"key":24,"text":394,"correct":32},{"key":27,"text":396,"correct":22},{"key":30,"text":398,"correct":22},{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},1109218,"（2018年真题）工程监理单位协助建设单位组织设计方案评审时，对专业设计方案评审的重点是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":32},"设计参数和设计标准",{"key":24,"text":541,"correct":22},"施工进度和工艺流程",{"key":27,"text":543,"correct":22},"设计深度是否符合规定",{"key":30,"text":545,"correct":22},"设备配套和占地面积",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":30,"analysis":33},1109219,"（2019年真题）项目监理机构在工程勘察阶段控制质量，最重要的工作是审查（ ）。",[550,551,552,553],{"key":20,"text":487,"correct":22},{"key":24,"text":489,"correct":22},{"key":27,"text":491,"correct":22},{"key":30,"text":493,"correct":32},[555,558,561,564,567,570],{"id":15,"name":556,"category":7,"favorite":557},"领导干部任职前廉政法规知识测试题",92,{"id":559,"name":560,"category":7,"favorite":15},595,"建筑结构与设备",{"id":562,"name":563,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":565,"name":566,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":568,"name":569,"category":7,"favorite":8},534,"BIM工程师",{"id":571,"name":569,"category":7,"favorite":8},535]