[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":565},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,36,50,2641,[13,34,46,55,67,79,91,103,115,127,138,150,159,171,182,194,204,216,226,238,250,262,274,286,296,308,320,332,344,353,362,374,386,398,410,421,430,441,449,461,473,481,490,498,506,516,528,536,547,557],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1109115,1,"单选题","设备的质量证明资料，属于（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","施工现场质量管理检查记录资料",false,{"key":24,"text":25,"correct":22},"B","施工单位资质资料",{"key":27,"text":28,"correct":22},"C","施工过程作业活动质量记录资料",{"key":30,"text":31,"correct":32},"D","工程材料质量记录",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1109116,"工程材料、构配件、设备报审表中的附件，不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"工程材料、构配件、设备清单",{"key":24,"text":41,"correct":22},"质量证明文件",{"key":27,"text":43,"correct":22},"自检结果",{"key":30,"text":45,"correct":32},"检验制度",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1109117,"施工单位质量记录资料包括三方面的内容，下列内容不属于质量记录资料的是（ ）。",[50,51,52,54],{"key":20,"text":21,"correct":22},{"key":24,"text":31,"correct":22},{"key":27,"text":53,"correct":32},"工程设备价款记录",{"key":30,"text":28,"correct":22},{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":30,"analysis":33},1109118,"由建设单位采购的主要设备由（ ）进行开箱检查，并由三方在开箱检查记录上签字。",[59,61,63,65],{"key":20,"text":60,"correct":22},"勘察单位、设计单位、建设单位",{"key":24,"text":62,"correct":22},"设计单位、建设单位、施工单位",{"key":27,"text":64,"correct":22},"施工单位、供货单位、项目监理机构",{"key":30,"text":66,"correct":32},"建设单位、施工单位、项目监理机构",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":24,"analysis":33},1109119,"在旁站监督中，监理机构发现施工单位有违反工程建设强制性标准行为的，应责令施工单位（ ）。",[71,73,75,77],{"key":20,"text":72,"correct":22},"立即停工",{"key":24,"text":74,"correct":32},"立即整改",{"key":27,"text":76,"correct":22},"立即退场",{"key":30,"text":78,"correct":22},"立即返工",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":30,"analysis":33},1109120,"一般情况下，施工单位提出工程变更的情形不包括（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"图纸出现缺陷无法施工",{"key":24,"text":86,"correct":22},"图纸不便施工，变更后更经济、方便",{"key":27,"text":88,"correct":22},"采用“四新”的需要",{"key":30,"text":90,"correct":32},"方案阶段考虑不周",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":20,"analysis":33},1109121,"总监理工程师组织监理人员熟悉工程设计文件是项目监理机构实施（ ）的一项重要工作。",[95,97,99,101],{"key":20,"text":96,"correct":32},"事前质量控制",{"key":24,"text":98,"correct":22},"事中质量控制",{"key":27,"text":100,"correct":22},"事后质量控制",{"key":30,"text":102,"correct":22},"施工质量控制",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},1109122,"项目监理机构对工程的关键部位或关键工序的施工质量进行的监督活动是指（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":22},"巡视",{"key":24,"text":110,"correct":32},"旁站",{"key":27,"text":112,"correct":22},"见证",{"key":30,"text":114,"correct":22},"检验",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},1109123,"需要施工单位修改施工组织设计时，由（ ）在报审表上签署意见，发回施工单位修改。",[119,121,123,125],{"key":20,"text":120,"correct":22},"专业监理工程师",{"key":24,"text":122,"correct":32},"总监理工程师",{"key":27,"text":124,"correct":22},"建设单位技术负责人",{"key":30,"text":126,"correct":22},"建设单位质量负责人",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":27,"analysis":33},1109124,"施工过程中，进场材料需要见证取样的，见证由（）负责。",[131,133,135,136],{"key":20,"text":132,"correct":22},"业主代表",{"key":24,"text":134,"correct":22},"政府质量监督员",{"key":27,"text":120,"correct":32},{"key":30,"text":137,"correct":22},"施工项目经理",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":30,"analysis":33},1109125,"图纸会审的内容一般不包括（）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"设计地震烈度是否符合当地要求",{"key":24,"text":145,"correct":22},"防火、消防是否满足要求",{"key":27,"text":147,"correct":22},"建筑材料来源有无保证",{"key":30,"text":149,"correct":32},"图纸是否已经通过设计交底",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1109126,"施工组织设计是指导施工单位进行施工的实施性文件，应经（ ）审核签认后方可实施。",[154,155,156,157],{"key":20,"text":137,"correct":22},{"key":24,"text":122,"correct":32},{"key":27,"text":120,"correct":22},{"key":30,"text":158,"correct":22},"建设单位代表",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":27,"analysis":33},1109127,"项目监理机构发现施工单位未按审查通过的工程设计文件施工的，总监理工程师应（ ）。",[163,165,167,169],{"key":20,"text":164,"correct":22},"签发监理通知单",{"key":24,"text":166,"correct":22},"签发工作联系单",{"key":27,"text":168,"correct":32},"签发工程暂停令",{"key":30,"text":170,"correct":22},"提交监理报告",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":33},1109128,"项目监理机构收到施工单位报送的工程材料、构配件、设备报审表后，应重点审查工程材料、构配件、设备的( )。",[175,176,178,180],{"key":20,"text":41,"correct":32},{"key":24,"text":177,"correct":22},"采购合同",{"key":27,"text":179,"correct":22},"设计要求文件",{"key":30,"text":181,"correct":22},"考查报告",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":27,"analysis":33},1109129,"在单位工程的质量验收中，对于涉及结构安全和使用功能的分部工程应进行( )。",[186,188,190,192],{"key":20,"text":187,"correct":22},"见证取样检测",{"key":24,"text":189,"correct":22},"主控项目的复查",{"key":27,"text":191,"correct":32},"抽样检测",{"key":30,"text":193,"correct":22},"检验资料的抽查",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},1109130,"项目监理机构收到施工单位报送的试验室报审表及有关资料后，应由()进行审查，并提出具体审查意见。",[198,199,200,202],{"key":20,"text":122,"correct":22},{"key":24,"text":120,"correct":32},{"key":27,"text":201,"correct":22},"监理员",{"key":30,"text":203,"correct":22},"总监理工程师代表",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":24,"analysis":33},1109131,"在建设工程监理活动中的施工质量控制，（ ）是实施监理的重要依据。",[208,210,212,214],{"key":20,"text":209,"correct":22},"工程合同文件",{"key":24,"text":211,"correct":32},"工程勘察设计文件",{"key":27,"text":213,"correct":22},"有关质量管理方面的法律法规文件",{"key":30,"text":215,"correct":22},"质量标准与技术规范",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":27,"analysis":33},1109132,"承包单位提出的技术修改要求，经相关各方同意签字后，由( )组织实施。",[220,222,224,225],{"key":20,"text":221,"correct":22},"设计代表",{"key":24,"text":223,"correct":22},"承包单位技术负责人",{"key":27,"text":122,"correct":32},{"key":30,"text":120,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},1109133,"通常情况下，施工方案应由（ ）组织编制，并经（ ）审批签字后提交项目监理机构。",[230,232,234,236],{"key":20,"text":231,"correct":22},"项目经理；项目技术负责人",{"key":24,"text":233,"correct":22},"项目经理；施工单位技术负责人",{"key":27,"text":235,"correct":32},"项目技术负责人；施工单位技术负责人",{"key":30,"text":237,"correct":22},"项目技术负责人；施工单位项目负责人",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1109134,"总监理工程师组织专业监理工程师审查施工单位报送的工程开工报审表及相关资料时，不属于审查内容的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"设计交底和图纸会审是否已完成",{"key":24,"text":245,"correct":32},"施工许可证是否已办理",{"key":27,"text":247,"correct":22},"施工组织设计是否已由总监理工程师签认",{"key":30,"text":249,"correct":22},"进场道路及水、电、通信等是否已满足开工要求",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":30,"analysis":33},1109135,"关于巡视的主要内容，下列不包括的是（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"检查施工单位是否按工程设计文件施工",{"key":24,"text":257,"correct":22},"检查施工单位使用的工程材料是否合格",{"key":27,"text":259,"correct":22},"检查施工单位特种作业人员是否持证上岗",{"key":30,"text":261,"correct":32},"检查施工单位关键工序的施工方案和强制性标准的执行情况",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":30,"analysis":33},1109136,"施工方案内容性审查中，下列不属于基础工程土方开挖质量安全方面要点的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"基坑边坡土不应超过设计荷载以防边坡塌方",{"key":24,"text":269,"correct":22},"挖方时不应碰撞或损伤支护结构、降水设施",{"key":27,"text":271,"correct":22},"开挖到设计标高后，应对坑底进行保护，验槽合格后，尽快施工垫层",{"key":30,"text":273,"correct":32},"基坑开挖过程中，安全保护措施资金的落实情况",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":30,"analysis":33},1109137,"施工过程中见证取样的试验室应是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"施工单位的试验室",{"key":24,"text":281,"correct":22},"建设单位指定的试验室",{"key":27,"text":283,"correct":22},"监理单位指定的试验室",{"key":30,"text":285,"correct":32},"与承包单位没有行政隶属关系的第三方试验室",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1109138,"在现场施工准备的质量控制中，项目监理机构对工程施工测量放线的复核控制工作应由（）负责。",[290,292,294,295],{"key":20,"text":291,"correct":22},"监理单位技术负责人",{"key":24,"text":293,"correct":22},"现场监理员",{"key":27,"text":120,"correct":32},{"key":30,"text":122,"correct":22},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":30,"analysis":33},1109139,"根据部门规范性文件，房屋建筑工程中，不属于基础工程的旁站的关键部位和工序是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"土方回填",{"key":24,"text":303,"correct":22},"卷材防水层细部构造处理",{"key":27,"text":305,"correct":22},"地下连续墙",{"key":30,"text":307,"correct":32},"梁柱节点钢筋隐蔽工程",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},1109140,"施工图设计文件审查合格后，（）应及时主持召开图纸会审会议，与会各方会签会议纪要。",[312,314,316,318],{"key":20,"text":313,"correct":32},"建设单位",{"key":24,"text":315,"correct":22},"施工单位",{"key":27,"text":317,"correct":22},"项目监理机构",{"key":30,"text":319,"correct":22},"设计单位",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},1109141,"施工承包单位要求变更或修改设计图纸的某些内容时，按现行规范的规定，应向项目监理机构提交（ ）请求批准。",[324,326,328,330],{"key":20,"text":325,"correct":22},"设计变更单",{"key":24,"text":327,"correct":22},"技术修改单",{"key":27,"text":329,"correct":32},"工程变更单",{"key":30,"text":331,"correct":22},"技术核定单",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},1109142,"在国内工程中，（）是必须执行与遵守的最低要求。",[336,338,340,342],{"key":20,"text":337,"correct":32},"国家标准",{"key":24,"text":339,"correct":22},"行业标准",{"key":27,"text":341,"correct":22},"地方标准",{"key":30,"text":343,"correct":22},"企业标准",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":30,"analysis":33},1109143,"对于施工单位提出的工程变更，（）组织建设单位、施工单位等共同协商确定工程变更费用及工期变化，会签工程变更单。",[348,350,351,352],{"key":20,"text":349,"correct":22},"建设单位负责人",{"key":24,"text":124,"correct":22},{"key":27,"text":120,"correct":22},{"key":30,"text":122,"correct":32},{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1109144,"PC构件吊装前，项目（ ）应对吊装准备工作进行检查，并形成书面记录。",[357,358,359,360],{"key":20,"text":201,"correct":22},{"key":24,"text":120,"correct":32},{"key":27,"text":122,"correct":22},{"key":30,"text":361,"correct":22},"生产质检员",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},1109145,"施工高度( )及以上的建筑幕墙安装工程，属于“超过一定规模的危险性较大的分部分项工程”，应由施工单位组织，召开专家论证会。",[366,368,370,372],{"key":20,"text":367,"correct":32},"50m",{"key":24,"text":369,"correct":22},"100m",{"key":27,"text":371,"correct":22},"150m",{"key":30,"text":373,"correct":22},"200m",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":30,"analysis":33},1109146,"下列专项施工方案中，需要组织专家论证的是( )。",[378,380,382,384],{"key":20,"text":379,"correct":22},"施工高度48m的建筑幕墙安装工程",{"key":24,"text":381,"correct":22},"跨度35m的钢结构安装工程",{"key":27,"text":383,"correct":22},"跨度50m的网架结构安装工程",{"key":30,"text":385,"correct":32},"开挖深度18m的人工挖孔桩工程",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},1109147,"项目监理机构安全生产的监理行为应满足的要求说法错误的是（）。",[390,392,394,396],{"key":20,"text":391,"correct":32},"按规定编制监理大纲和监理规划",{"key":24,"text":393,"correct":22},"按规定审查施工组织设计中的安全技术措施或者专项施工方案",{"key":27,"text":395,"correct":22},"按规定审核各相关单位资质、安全生产许可证、\"安管人员\"安全生产考核合格证书和特种作业人员操作资格证书并做好记录",{"key":30,"text":397,"correct":22},"按规定对现场实施安全监理",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":27,"analysis":33},1109148,"用于钢结构安装等满堂支撑体系，承受单点集中荷载（ ）及以上，属于超过一定规模的危险性较大的分部分项工程。",[402,404,406,408],{"key":20,"text":403,"correct":22},"3KN",{"key":24,"text":405,"correct":22},"5KN",{"key":27,"text":407,"correct":32},"7KN",{"key":30,"text":409,"correct":22},"9KN",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},1109149,"制作各个作业环节的统计由（）签字确认，报驻厂监理认可。",[414,416,417,419],{"key":20,"text":415,"correct":22},"施工员",{"key":24,"text":361,"correct":32},{"key":27,"text":418,"correct":22},"项目技术负责人",{"key":30,"text":420,"correct":22},"项目负责人",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},1109150,"分包工程开工前，项目监理机构审核施工单位报送的分包单位资格报审表，（ ）进行审核并提出审查意见。",[425,427,428,429],{"key":20,"text":426,"correct":22},"项目经理",{"key":24,"text":120,"correct":32},{"key":27,"text":313,"correct":22},{"key":30,"text":122,"correct":22},{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1109151,"新材料不符合强制性标准规定，应当由（ ）提请建设单位组织专题技术论证。",[434,436,438,440],{"key":20,"text":435,"correct":22},"建设行政主管部门",{"key":24,"text":437,"correct":32},"拟采用单位",{"key":27,"text":439,"correct":22},"监理单位",{"key":30,"text":319,"correct":22},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":30,"analysis":33},1109152,"图纸会审通常由（ ）来主持。",[445,446,447,448],{"key":20,"text":319,"correct":22},{"key":24,"text":439,"correct":22},{"key":27,"text":315,"correct":22},{"key":30,"text":313,"correct":32},{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1109153,"高强度大六角头螺栓连接副终拧完成（ ）后、（ ）内应进行终拧扭矩检查，检验结果符合规程规定。",[453,455,457,459],{"key":20,"text":454,"correct":22},"1h，24h",{"key":24,"text":456,"correct":32},"1h，48h",{"key":27,"text":458,"correct":22},"2h，24h",{"key":30,"text":460,"correct":22},"2h，48h",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1109154,"在工程施工准备阶段的质量控制中，项目监理机构对施工方案的审查，应包括的基本内容是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":32},"工程质量保证措施应符合有关标准",{"key":24,"text":468,"correct":22},"施工总平面布置应科学合理",{"key":27,"text":470,"correct":22},"安全技术措施应符合工程建设强制性标准",{"key":30,"text":472,"correct":22},"资金满足工程施工需要",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},1109155,"在工程施工准备阶段的质量控制中，施工组织设计报审表的审查意见由（ ）负责签字。",[477,478,479,480],{"key":20,"text":426,"correct":22},{"key":24,"text":120,"correct":32},{"key":27,"text":122,"correct":22},{"key":30,"text":158,"correct":22},{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},1109156,"在现场施工准备质量控制中，对于进口材料、构配件和设备，联合检查由（ ）提出申请。",[485,486,487,488],{"key":20,"text":315,"correct":32},{"key":24,"text":439,"correct":22},{"key":27,"text":313,"correct":22},{"key":30,"text":489,"correct":22},"供货单位",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},1109157,"项目监理机构收到施工单位报送的试验室报审表及有关资料后，应由（ ）进行审查，并提出具体审查意见。",[494,495,496,497],{"key":20,"text":120,"correct":32},{"key":24,"text":122,"correct":22},{"key":27,"text":201,"correct":22},{"key":30,"text":203,"correct":22},{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},1109158,"工程开工前，（ ）应检查、复核施工单位报送的施工控制测量成果及保护措施，签署意见。",[502,503,504,505],{"key":20,"text":203,"correct":22},{"key":24,"text":120,"correct":32},{"key":27,"text":313,"correct":22},{"key":30,"text":122,"correct":22},{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":30,"analysis":33},1109159,"（2015年真题）涉及工程设计文件修改的工程变更，应由（ ）转交原设计单位修改工程设计文件。",[510,511,513,515],{"key":20,"text":317,"correct":22},{"key":24,"text":512,"correct":22},"施工单位技术负责人",{"key":27,"text":514,"correct":22},"施工单位项目负责人",{"key":30,"text":313,"correct":32},{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":27,"analysis":33},1109160,"（2015年真题）项目监理机构根据有关规定和（ ），可对施工质量进行平行检验。",[520,522,524,526],{"key":20,"text":521,"correct":22},"施工组织设计的要求",{"key":24,"text":523,"correct":22},"设计图纸的要求",{"key":27,"text":525,"correct":32},"监理合同的约定",{"key":30,"text":527,"correct":22},"施工合同的约定",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":27,"analysis":33},1109161,"（2016年真题）根据《建设工程监理规范》，工程施工采用新技术、新工艺时，应由（ ）组织必要的专题论证。",[532,533,534,535],{"key":20,"text":315,"correct":22},{"key":24,"text":439,"correct":22},{"key":27,"text":313,"correct":32},{"key":30,"text":319,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":27,"analysis":33},1109162,"（2016年真题）建设单位负责采购的主要设备进场后，应由（ ）三方共同进行开箱检查。",[540,542,544,545],{"key":20,"text":541,"correct":22},"建设单位、供货单位、施工单位",{"key":24,"text":543,"correct":22},"供货单位、施工单位、项目监理机构",{"key":27,"text":66,"correct":32},{"key":30,"text":546,"correct":22},"供货单位、设计单位、施工单位",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},1109163,"（2016年真题）施工单位编制的施工组织设计应经施工单位（ ）审核签认后，方可报送项目监理机构审查。",[551,553,555,556],{"key":20,"text":552,"correct":22},"法定代表人",{"key":24,"text":554,"correct":32},"技术负责人",{"key":27,"text":420,"correct":22},{"key":30,"text":418,"correct":22},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":33},1109164,"（2016年真题）图纸会审的会议纪要应由（ ）负责整理，与会各方会签。",[561,562,563,564],{"key":20,"text":439,"correct":22},{"key":24,"text":313,"correct":22},{"key":27,"text":315,"correct":32},{"key":30,"text":319,"correct":22},[566,569,572,575,578,581],{"id":15,"name":567,"category":7,"favorite":568},"领导干部任职前廉政法规知识测试题",92,{"id":570,"name":571,"category":7,"favorite":15},595,"建筑结构与设备",{"id":573,"name":574,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":576,"name":577,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":579,"name":580,"category":7,"favorite":8},534,"BIM工程师",{"id":582,"name":580,"category":7,"favorite":8},535]