[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":556},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,35,50,2641,[13,34,46,56,68,80,92,104,114,124,136,146,155,164,173,185,194,203,215,224,236,246,258,270,282,291,299,311,323,335,346,358,365,377,389,398,407,418,430,442,451,461,471,483,492,502,514,526,538,548],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1109029,1,"单选题","在施工过程中，（）应督促施工单位加强内部质量管理，严格质量控制。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","质量监督机构",false,{"key":24,"text":25,"correct":22},"B","建设单位",{"key":27,"text":28,"correct":22},"C","咨询单位",{"key":30,"text":31,"correct":32},"D","项目监理机构",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1109030,"工程中采用新工艺、新材料的，应有()及有关质量数据。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工单位组织的专家论证意见",{"key":24,"text":41,"correct":32},"权威性技术部门的技术鉴定书",{"key":27,"text":43,"correct":22},"设计单位组织的专家论证意见",{"key":30,"text":45,"correct":22},"建设单位组织的专家论证意见",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1109048,"经审查批准的施工组织设计，不得擅自任意改动。若需进行实质性的调整、补充或变动，应报（ ）审查同意。",[50,52,54,55],{"key":20,"text":51,"correct":22},"施工单位工程技术负责人",{"key":24,"text":53,"correct":22},"项目经理",{"key":27,"text":31,"correct":32},{"key":30,"text":25,"correct":22},{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":30,"analysis":33},1109049,"施工方案的审查包括程序性审查和内容性审查，下列关于程序性审查的描述中，正确的是（）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"重点核对审批人是否为项目技术负责人",{"key":24,"text":63,"correct":22},"施工方案应由项目经理组织编制",{"key":27,"text":65,"correct":22},"应重点审查施工方案的校对人是否符合有关权限规定的要求",{"key":30,"text":67,"correct":32},"施工方案应由施工单位技术负责人审批签字后提交项目监理机构",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":27,"analysis":33},1109050,"施工单位应按有关规定定期对计量设备进行检查、检定，确保计量设备的（）。",[72,74,76,78],{"key":20,"text":73,"correct":22},"优越性和技术性",{"key":24,"text":75,"correct":22},"优越性和可靠性",{"key":27,"text":77,"correct":32},"精确性和可靠性",{"key":30,"text":79,"correct":22},"精确性和经济性",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":27,"analysis":33},1109051,"项目监理机构收到施工单位报送的试验室报审表及有关资料后，（ ）在熟悉本工程的试验项目及其要求后对施工试验室进行审查。",[84,86,88,90],{"key":20,"text":85,"correct":22},"总监理工程师",{"key":24,"text":87,"correct":22},"监理单位技术负责人",{"key":27,"text":89,"correct":32},"专业监理工程师",{"key":30,"text":91,"correct":22},"专业工程师",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1109052,"平行检验的项目、数量、频率和费用等应符合建设工程监理合同的约定。对平行检验不合格的施工质量，项目监理机构应( )。",[96,98,100,102],{"key":20,"text":97,"correct":22},"签发监理通知单，要求施工单位限期将其撤出施工现场",{"key":24,"text":99,"correct":32},"签发监理通知单，要求施工单位在指定的时间内整改并重新报验",{"key":27,"text":101,"correct":22},"签发工程暂停令，责令施工单位暂停下一工序施工",{"key":30,"text":103,"correct":22},"签发工程暂停令，责令施工单位按设计处理文件进行修复",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},1109053,"工程开工前，施工图纸会审会议应由()主持召开。",[108,109,111,112],{"key":20,"text":31,"correct":22},{"key":24,"text":110,"correct":22},"施工单位",{"key":27,"text":25,"correct":32},{"key":30,"text":113,"correct":22},"设计单位",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":24,"analysis":33},1109054,"经项目监理机构审查合格的工程项目施工组织设计，应由()签认。",[118,119,120,122],{"key":20,"text":87,"correct":22},{"key":24,"text":85,"correct":32},{"key":27,"text":121,"correct":22},"建设单位项目负责人",{"key":30,"text":123,"correct":22},"总监理工程师代表",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":24,"analysis":33},1109055,"施工单位编制的施工组织设计应经施工单位()审核签认后，方可报送项目监理机构审查。",[128,130,132,134],{"key":20,"text":129,"correct":22},"法定代表人",{"key":24,"text":131,"correct":32},"技术负责人",{"key":27,"text":133,"correct":22},"项目负责人",{"key":30,"text":135,"correct":22},"项目技术负责人",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},1109056,"根据相关规定，通常情况下，施工方案应由( )组织编制。",[140,141,142,144],{"key":20,"text":133,"correct":22},{"key":24,"text":135,"correct":32},{"key":27,"text":143,"correct":22},"施工单位负责人",{"key":30,"text":145,"correct":22},"施工单位技术负责人",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":30,"analysis":33},1109057,"分包单位资格报审表中的审核意见应由()签署。",[150,151,153,154],{"key":20,"text":121,"correct":22},{"key":24,"text":152,"correct":22},"施工单位项目负责人",{"key":27,"text":89,"correct":22},{"key":30,"text":85,"correct":32},{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":27,"analysis":33},1109058,"项目监理机构收到施工单位报送的施工控制测量成果报验表后，应由()签署审核意见。",[159,160,161,162],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":22},{"key":27,"text":89,"correct":32},{"key":30,"text":163,"correct":22},"监理员",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1109059,"用于工程的进口材料、构配件和设备，按合同约定需要进行联合检查验收的，应由()提出联合检查验收申请。",[168,169,170,172],{"key":20,"text":110,"correct":32},{"key":24,"text":31,"correct":22},{"key":27,"text":171,"correct":22},"供货单位",{"key":30,"text":25,"correct":22},{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":27,"analysis":33},1109060,"建设单位负责采购的主要设备进场后，应由()三方共同进行开箱检查。",[177,179,181,183],{"key":20,"text":178,"correct":22},"建设单位、供货单位、施工单位",{"key":24,"text":180,"correct":22},"供货单位、施工单位、项目监理机构",{"key":27,"text":182,"correct":32},"建设单位、施工单位、项目监理机构",{"key":30,"text":184,"correct":22},"供货单位、设计单位、施工单位",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":27,"analysis":33},1109061,"图纸会审的会议纪要应由()负责整理，与会各方会签。",[189,191,192,193],{"key":20,"text":190,"correct":22},"监理单位",{"key":24,"text":25,"correct":22},{"key":27,"text":110,"correct":32},{"key":30,"text":113,"correct":22},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},1109062,"设计交底是保证工程质量的重要环节，设计交底应由()主持。",[198,199,200,201],{"key":20,"text":190,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":113,"correct":22},{"key":30,"text":202,"correct":22},"施工图审查单位",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":30,"analysis":33},1109063,"施工图设计交底的目的是设计单位向施工单位和监理单位进行()和说明。",[207,209,211,213],{"key":20,"text":208,"correct":22},"设计图纸的交接",{"key":24,"text":210,"correct":22},"施工和监理任务的部署",{"key":27,"text":212,"correct":22},"质量目标的分解落实",{"key":30,"text":214,"correct":32},"设计意图的传达",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":24,"analysis":33},1109064,"用于工程的进口设备进场后，应有()组织相关单位进行联合检查验收。",[219,220,221,222],{"key":20,"text":25,"correct":22},{"key":24,"text":31,"correct":32},{"key":27,"text":110,"correct":22},{"key":30,"text":223,"correct":22},"设备供应单位",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":30,"analysis":33},1109065,"对同一水泥广的同期出厂的同品种、同标号的散装水泥，以一次进场的同一出厂编号的水泥为一批，但一批的总量不得超过（）t。",[228,230,232,234],{"key":20,"text":229,"correct":22},"100",{"key":24,"text":231,"correct":22},"200",{"key":27,"text":233,"correct":22},"300",{"key":30,"text":235,"correct":32},"500",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1109066,"项目监理机构要将选定的试验室报送负责本项目的质量监督机构备案，同时要将项目监理机构中负责见证取样的( )在该质量监督机构备案。",[240,241,243,245],{"key":20,"text":163,"correct":22},{"key":24,"text":242,"correct":32},"监理人员",{"key":27,"text":244,"correct":22},"见证人员",{"key":30,"text":89,"correct":22},{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1109081,"商品构件运入现场后，应按规定的批量和频率进行试验，不合格商品构件不得用于工程的试验方法是（）。",[250,252,254,256],{"key":20,"text":251,"correct":32},"验证试验",{"key":24,"text":253,"correct":22},"标准试验",{"key":27,"text":255,"correct":22},"抽样试验",{"key":30,"text":257,"correct":22},"复核试验",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":30,"analysis":33},1109082,"下列有关工程暂停令的签发，叙述错误的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"施工单位未经批准擅自施工的，总监理工程师应当及时签发工程暂停令",{"key":24,"text":265,"correct":22},"施工单位未按审查通过的工程设计文件施工的，总监理工程师应当及时签发工程暂停令",{"key":27,"text":267,"correct":22},"施工单位违反工程建设强制性标准的，总监理工程师应当及时签发工程暂停令",{"key":30,"text":269,"correct":32},"建设单位要求暂停施工的，总监理工程师应立即签发工程暂停令",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":30,"analysis":33},1109084,"对有抗震设防专门要求的结构构件，箍筋弯钩的弯折角度不应小于( )。",[274,276,278,280],{"key":20,"text":275,"correct":22},"90°",{"key":24,"text":277,"correct":22},"95°",{"key":27,"text":279,"correct":22},"105°",{"key":30,"text":281,"correct":32},"135°",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":27,"analysis":33},1109085,"装配式建筑PC 构件生产阶段的质量控制中，对钢筋制作、钢筋安装、预埋件安装等环节，必须检验合格并经( )完成隐蔽工程验收，才能进行下一道工序。",[286,287,288,290],{"key":20,"text":85,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":289,"correct":32},"驻厂监理工程师",{"key":30,"text":163,"correct":22},{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":33},1109086,"装配式建筑PC 构件施工质量控制中，项目监理机构应审核施工单位编制的吊装方案，提出审查意见，经( )签认后实施。",[295,296,297,298],{"key":20,"text":85,"correct":32},{"key":24,"text":89,"correct":22},{"key":27,"text":289,"correct":22},{"key":30,"text":163,"correct":22},{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":24,"analysis":33},1109087,"在工程质量控制方面，项目监理机构发现( )，应及时签发监理通知单，要求施工单位整改。",[303,305,307,309],{"key":20,"text":304,"correct":22},"施工存在重大质量隐患的",{"key":24,"text":306,"correct":32},"施工单位采用不适当的施工工艺的",{"key":27,"text":308,"correct":22},"施工单位未按审查通过的工程设计文件施工的",{"key":30,"text":310,"correct":22},"施工单位拒绝项目监理机构管理的",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":20,"analysis":33},1109088,"工程监理实施过程中，总监理工程师应签发工程暂停令的情形是()。",[315,317,319,321],{"key":20,"text":316,"correct":32},"施工单位未经批准擅自施工",{"key":24,"text":318,"correct":22},"施工存在质量事故隐患",{"key":27,"text":320,"correct":22},"施工单位采用不适当施工工艺",{"key":30,"text":322,"correct":22},"施工单位未按施工方案施工",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":30,"analysis":33},1109089,"下列报审、报验表中，需要建设单位签署审批意见的是()。",[327,329,331,333],{"key":20,"text":328,"correct":22},"分包单位资格报审表",{"key":24,"text":330,"correct":22},"施工进度计划报审表",{"key":27,"text":332,"correct":22},"分项工程报验表",{"key":30,"text":334,"correct":32},"工程复工报审表",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":27,"analysis":33},1109090,"涉及主体结构及安全的工程变更，要按有关规定报送()审批，否则变更不能实施。",[339,341,342,344],{"key":20,"text":340,"correct":22},"当地建设行政主管部门",{"key":24,"text":21,"correct":22},{"key":27,"text":343,"correct":32},"施工图原审查单位",{"key":30,"text":345,"correct":22},"建设单位主管部门",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1109091,"根据《建设工程监理规范》，项目监理机构应根据工程特点和()确定需要旁站的关键部位、关键工序。",[350,352,354,356],{"key":20,"text":351,"correct":22},"监理实施细则",{"key":24,"text":353,"correct":32},"施工组织设计",{"key":27,"text":355,"correct":22},"监理规划",{"key":30,"text":357,"correct":22},"设计图纸",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":360,"answer":24,"analysis":33},1109092,[361,362,363,364],{"key":20,"text":97,"correct":22},{"key":24,"text":99,"correct":32},{"key":27,"text":101,"correct":22},{"key":30,"text":103,"correct":22},{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":24,"analysis":33},1109094,"承包单位提出的见证取样送检的试验室，专业监理工程师应（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"提出担保要求",{"key":24,"text":372,"correct":32},"进行实地考察",{"key":27,"text":374,"correct":22},"提供试验计划",{"key":30,"text":376,"correct":22},"规定试验设备",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":30,"analysis":33},1109095,"对装配式混凝土构件等有特别要求的混凝土制备，应实施（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"见证取样",{"key":24,"text":384,"correct":22},"抽样检测",{"key":27,"text":386,"correct":22},"巡视检查",{"key":30,"text":388,"correct":32},"驻厂（场）监理",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1109096,"监理人员发现可能造成质量事故的重大隐患或已发生质量事故的，（ ）应签发工程暂停令。",[393,394,395,396],{"key":20,"text":85,"correct":32},{"key":24,"text":89,"correct":22},{"key":27,"text":25,"correct":22},{"key":30,"text":397,"correct":22},"施工方项目经理",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":27,"analysis":33},1109097,"监理资料的管理应由（ ）负责，并指定专人具体实施。",[402,403,404,405],{"key":20,"text":242,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":85,"correct":32},{"key":30,"text":406,"correct":22},"总监代表",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":30,"analysis":33},1109098,"施工单位应当在施工现场显著位置公告危大工程名称、施工时间和具体责任人员，并在危险区域设置安全警示标志。项目监理机构发现施工单位未按照专项施工方案施工的，且施工单位拒不整改的，应当及时报告()。",[411,413,414,416],{"key":20,"text":412,"correct":22},"主管部门",{"key":24,"text":25,"correct":22},{"key":27,"text":415,"correct":22},"工程所在地住房城乡建设主管部门",{"key":30,"text":417,"correct":32},"建设单位和工程所在地住房城乡建设主管部门",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},1109099,"在申请办理()手续时，建设单位应当提交危大工程清单及其安全管理措施等资料。",[422,424,426,428],{"key":20,"text":423,"correct":22},"施工许可证",{"key":24,"text":425,"correct":22},"质量监督申报",{"key":27,"text":427,"correct":32},"安全监督",{"key":30,"text":429,"correct":22},"施工图设计报审",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":30,"analysis":33},1109100,"对于按照规定需要进行第三方监测的危大工程，建设单位应当委托具有相应勘察资质的单位进行监测。监测单位应当编制监测方案。监测方案由()方可实施。",[434,436,438,440],{"key":20,"text":435,"correct":22},"总监理工程师审核签字后",{"key":24,"text":437,"correct":22},"监测单位技术负责人审核签字并加盖单位公章后",{"key":27,"text":439,"correct":22},"总监理工程师审核签字，报送建设单位后",{"key":30,"text":441,"correct":32},"监测单位技术负责人审核签字并加盖单位公章，报送监理单位后",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1109101,"监测单位应当编制监测方案。监测方案由监测单位技术负责人审核签字并加盖单位公章，报送（ ）后方可实施。",[446,447,448,449],{"key":20,"text":25,"correct":22},{"key":24,"text":190,"correct":32},{"key":27,"text":21,"correct":22},{"key":30,"text":450,"correct":22},"质量检测机构",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},1109102,"对于按照规定需要验收的危大工程，施工单位、监理单位应当组织相关人员进行验收。验收合格的，经（ ）及总监理工程师签字确认后，方可进入下一道工序。",[455,457,458,460],{"key":20,"text":456,"correct":32},"施工单位项目技术负责人",{"key":24,"text":121,"correct":22},{"key":27,"text":459,"correct":22},"施工单位项目经理",{"key":30,"text":89,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1109103,"在现场安全管理工作中，监理单位应当结合危大工程专项施工方案编制（ ），并对危大工程施工实施专项巡视检查。",[465,466,467,469],{"key":20,"text":355,"correct":22},{"key":24,"text":351,"correct":32},{"key":27,"text":468,"correct":22},"监理大纲",{"key":30,"text":470,"correct":22},"监理专项施工方案",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},1109107,"旁站是指项目监理机构对工程的关键部位或关键工序的施工质量进行的监督活动。以下关于关键部位、关键工序的说法错误的是( )。",[475,477,479,481],{"key":20,"text":476,"correct":32},"开工前，项目监理机构与施工单位协商确定，并报建设单位确认",{"key":24,"text":478,"correct":22},"由项目监理机构根据工程特点和施工单位报送的施工组织设计确定",{"key":27,"text":480,"correct":22},"开工前，项目监理机构确定旁站的关键部位、关键工序，并书面通知施工单位",{"key":30,"text":482,"correct":22},"应将影响工程主体结构安全的、完工后无法检测其质量的或返工会造成较大损失的部位及其施工过程作为旁站的关键部位、关键工序",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":27,"analysis":33},1109108,"施工单位编制的施工组织设计经( )审核签认后，与施工组织设计报审表一并报送项目监理机构。",[487,488,489,490],{"key":20,"text":143,"correct":22},{"key":24,"text":152,"correct":22},{"key":27,"text":145,"correct":32},{"key":30,"text":491,"correct":22},"施工单位主要负责人",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":27,"analysis":33},1109109,"收到施工单位报送的单位工程竣工验收报审表及相关资料后，（ ）应组织监理人员进行工程质量竣工预验收。",[496,498,500,501],{"key":20,"text":497,"correct":22},"建设单位法人代表",{"key":24,"text":499,"correct":22},"建设单位现场代表",{"key":27,"text":85,"correct":32},{"key":30,"text":89,"correct":22},{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},1109110,"对需要返工处理的质量事故，项目监理机构应要求施工单位报送（ ）和经设计等相关单位认可的处理方案，并对质量事故的处理过程进行跟踪检查。",[506,508,510,512],{"key":20,"text":507,"correct":32},"质量事故调查报告",{"key":24,"text":509,"correct":22},"质量事故书面报告",{"key":27,"text":511,"correct":22},"质量事故状况观测记录",{"key":30,"text":513,"correct":22},"质量事故处理依据",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},1109111,"总监理工程师应在开工日期（ ）天前发出工程开工令。",[518,520,522,524],{"key":20,"text":519,"correct":22},"1",{"key":24,"text":521,"correct":22},"5",{"key":27,"text":523,"correct":32},"7",{"key":30,"text":525,"correct":22},"14",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":30,"analysis":33},1109112,"工程变更如果涉及结构主体安全时，该工程变更还要按有关规定报送（ ）及管理部门进行审查与批准。",[530,532,534,536],{"key":20,"text":531,"correct":22},"建设单位上级主管部门",{"key":24,"text":533,"correct":22},"当地质检部门",{"key":27,"text":535,"correct":22},"建设行政主管部门",{"key":30,"text":537,"correct":32},"施工图原审查机构",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":30,"analysis":33},1109113,"质量合格的材料、构配件进场后，到其使用或安装时通常要经过一定的时间间隔。在此时间里，（ ）应对施工单位在材料、半成品、构配件的存放、保管及使用期限实行监控。",[542,544,546,547],{"key":20,"text":543,"correct":22},"施工单位质量负责人",{"key":24,"text":545,"correct":22},"施工单位保管人员",{"key":27,"text":163,"correct":22},{"key":30,"text":89,"correct":32},{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},1109114,"（ ）应按照相应测量标准的要求对施工平面控制网、高程控制网和临时水准点的测量成果及控制桩的保护措施进行检查、复核。",[552,553,554,555],{"key":20,"text":89,"correct":32},{"key":24,"text":85,"correct":22},{"key":27,"text":87,"correct":22},{"key":30,"text":163,"correct":22},[557,560,563,566,569,572],{"id":15,"name":558,"category":7,"favorite":559},"领导干部任职前廉政法规知识测试题",92,{"id":561,"name":562,"category":7,"favorite":15},595,"建筑结构与设备",{"id":564,"name":565,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":567,"name":568,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":570,"name":571,"category":7,"favorite":8},534,"BIM工程师",{"id":573,"name":571,"category":7,"favorite":8},535]