[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,28,50,2641,[13,34,46,58,70,82,92,104,116,128,140,152,164,176,188,200,212,224,236,247,255,267,279,291,303,315,323,335,347,359,368,380,392,404,412,424,436,447,459,471,479,488,500,512,520,532,544,556,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1108611,1,"单选题","在某工程双代号网络计划中，如果以某关键节点为完成节点的工作共有3项，则该3项工作（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","全部为关键工作",false,{"key":24,"text":25,"correct":26},"B","至少有一项为关键工作",true,{"key":28,"text":29,"correct":22},"C","自由时差相等",{"key":31,"text":32,"correct":22},"D","总时差相等","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1108612,"在双代号网络计划中，当计划工期等于计算工期时，如果某项工作的开始节点和完成节点均为关键节点，则该工作（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"总时差和自由时差必然相等",{"key":24,"text":41,"correct":22},"自由时差必然为零",{"key":28,"text":43,"correct":22},"总时差必然为零",{"key":31,"text":45,"correct":22},"一定为关键工作",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1108613,"计划工期等于计算工期的双代号网络计划中，关于关键节点特点的说法正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"开始节点和完成节点均为关键节点的工作一定是关键工作",{"key":24,"text":53,"correct":26},"以关键节点为完成节点的工作总时差和自由时差相等",{"key":28,"text":55,"correct":22},"两个关键节点之间的多项工作总时差均相等",{"key":31,"text":57,"correct":22},"两个关键节点之间的多项工作自由时差均相等",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1108614,"关于双代号网络计划中关键工作的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"关键工作的最迟开始时间与最早开始时间的差值最小",{"key":24,"text":65,"correct":22},"以关键节点为开始节点和完成节点的工作必为关键工作",{"key":28,"text":67,"correct":22},"关键工作与其紧后工作之间的时间间隔必定为零",{"key":31,"text":69,"correct":22},"自始至终由关键工作组成的线路总持续时间最短",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1108615,"某双代号网络计划中（以天为时间单位），工作K的最早开始时间为6天，工作持续时间为4天；工作M的最迟完成时间为22天，工作持续时间为10天；工作N的最迟完成时间为20天，工作持续时间为5天。己知工作K只有M、N两项紧后工作，则工作K的总时差为（ ）天。",[74,76,78,80],{"key":20,"text":75,"correct":26},"2",{"key":24,"text":77,"correct":22},"3",{"key":28,"text":79,"correct":22},"5",{"key":31,"text":81,"correct":22},"6",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1108616,"工程网络计划中，某工作持续时间为5天，其3项紧后工作的最迟开始时间分别为第7、8和10天，则该工作的最迟开始时间是第（ ）天。",[86,88,89,91],{"key":20,"text":87,"correct":22},"1",{"key":24,"text":75,"correct":26},{"key":28,"text":90,"correct":22},"4",{"key":31,"text":79,"correct":22},{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1108617,"网络计划中，工作总时差是本工作可以利用的机动时间，但其前提是（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":26},"不影响紧后工作最迟开始",{"key":24,"text":99,"correct":22},"不影响紧后工作最早开始",{"key":28,"text":101,"correct":22},"不影响紧后工作最早完成",{"key":31,"text":103,"correct":22},"不影响后续工作最早完成",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1108618,"在工程网络计划中，工作的最迟开始时间等于本工作的（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"最迟完成时间与其时间间隔之差",{"key":24,"text":111,"correct":26},"最迟完成时间与其持续时间之差",{"key":28,"text":113,"correct":22},"最早开始时间与其持续时间之和",{"key":31,"text":115,"correct":22},"最早开始时间与其时间间隔之和",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1108619,"（ ）是指在双代号网络计划中，以该节点为开始节点的各项工作的最早开始时间。",[120,122,124,126],{"key":20,"text":121,"correct":26},"节点最早时间",{"key":24,"text":123,"correct":22},"节点开始时间",{"key":28,"text":125,"correct":22},"最早开始时间",{"key":31,"text":127,"correct":22},"节点最迟时间",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1108620,"在工程网络计划中，某项工作的最早完成时间与其紧后工作的最早开始时间之间的差值称为这两项工作之间的（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":26},"时间间隔",{"key":24,"text":135,"correct":22},"间歇时间",{"key":28,"text":137,"correct":22},"时差",{"key":31,"text":139,"correct":22},"时距",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":28,"analysis":33},1108621,"工作的总时差是指在不影响（ ）的前提下，本工作所具有的机动时间。",[144,146,148,150],{"key":20,"text":145,"correct":22},"本工作最早完成时间",{"key":24,"text":147,"correct":22},"紧后工作最早完成时间",{"key":28,"text":149,"correct":26},"网络计划总工期",{"key":31,"text":151,"correct":22},"紧后工作最早开始时间",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":31,"analysis":33},1108622,"单代号网络图的基本符号中“箭线”表示（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"一项工作",{"key":24,"text":159,"correct":22},"工作名称",{"key":28,"text":161,"correct":22},"工作持续时间",{"key":31,"text":163,"correct":26},"紧邻工作之间的逻辑关系",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1108623,"相对于某工作而言，从网络图的第一个节点（起点节点）开始，顺箭头方向经过一系列箭线与节点到达该工作为止的各条通路上的所有工作，都称为该工作的（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":26},"先行工作",{"key":24,"text":171,"correct":22},"先做工作",{"key":28,"text":173,"correct":22},"后续工作",{"key":31,"text":175,"correct":22},"后做工作",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},1108624,"网络计划的资源优化分为两种，其中“工期固定、资源均衡”是指（ ）的优化。",[180,182,184,186],{"key":20,"text":181,"correct":22},"在工期不变的条件下，使资源投入最少",{"key":24,"text":183,"correct":22},"在满足资源限制条件下，使工期延长最少",{"key":28,"text":185,"correct":22},"在工期不变的条件下，使工程总费用最低",{"key":31,"text":187,"correct":26},"在工期不变的条件下，使资源需用量尽可能均衡",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1108625,"关于多级网络计划系统的特点，叙述正确的是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"多级网络计划系统的编制过程是一个从底层到顶层.由细到粗的过程",{"key":24,"text":195,"correct":26},"多级网络计划系统中的层级与建设工程规模.复杂程度及进度控制的需要有关",{"key":28,"text":197,"correct":22},"在多级网络计划系统中，不同层级的网络计划，应该由同层级的进度控制人员编制",{"key":31,"text":199,"correct":22},"多级网络计划系统不可以随时进行分解和综合",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1108626,"关于建设工程多级网络计划系统的说法，错误的有（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"计划系统由不同层级网络计划组成",{"key":24,"text":207,"correct":26},"能够使用一个网络图来表达工程的所有工作内容",{"key":28,"text":209,"correct":22},"进度计划通常采用自顶向下，分级编制的方法",{"key":31,"text":211,"correct":22},"能够保证建设工程所需资源的连续性",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1108627,"在单代号搭接网络计划中，关键线路是指（ ）的线路。",[216,218,220,222],{"key":20,"text":217,"correct":22},"持续时间总和最长",{"key":24,"text":219,"correct":26},"时间间隔均为零",{"key":28,"text":221,"correct":22},"时距总和最长",{"key":31,"text":223,"correct":22},"由关键节点组成",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":31,"analysis":33},1108628,"工程网络计划“资源有限，工期最短”优化的目的是为了寻求（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"资源均衡使用时的最短工期安排",{"key":24,"text":231,"correct":22},"最短工期条件下的资源均衡安排",{"key":28,"text":233,"correct":22},"最低成本时的最短工期安排",{"key":31,"text":235,"correct":26},"资源有限条件下的最短工期安排",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},1108629,"工程网络计划资源优化的目的之一是为了寻求（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"工程总成本最低条件下的资源均衡安排",{"key":24,"text":243,"correct":22},"资源均衡使用条件下的最短工期安排",{"key":28,"text":245,"correct":22},"资源使用最少条件下的合理工期安排",{"key":31,"text":235,"correct":26},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1108630,"已知某网络计划如下图所示，箭杆上方括号外为工作名称，括号内为优先压缩顺序。箭杆下方括号外为正常持续时间，括号内为最短持续时间，若对其工期进行压缩，应首先压缩工作（ ）。",[251,252,253,254],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":20,"analysis":33},1108631,"网络计划优化时，工期优化应优先选择（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":26},"压缩关键工作且优选系数最小的",{"key":24,"text":262,"correct":22},"压缩关键工作且优选系数最大的",{"key":28,"text":264,"correct":22},"压缩非关键工作且优选系数最小的",{"key":31,"text":266,"correct":22},"压缩非关键工作且优选系数最大的",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":28,"analysis":33},1108632,"为缩短工期而采取的进度计划调整方法中，不需要改变网络计划中工作间逻辑关系的是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"将顺序进行的工作改为平行作业",{"key":24,"text":274,"correct":22},"重新划分施工段组织流水施工",{"key":28,"text":276,"correct":26},"采取措施压缩关键工作持续时间",{"key":31,"text":278,"correct":22},"将顺序进行的工作改为搭接作业",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},1108633,"时标网络计划的坐标体系不包括（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"计算坐标体系",{"key":24,"text":286,"correct":22},"工作日坐标体系",{"key":28,"text":288,"correct":22},"日历坐标体系",{"key":31,"text":290,"correct":26},"时间坐标体系",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},1108634,"某工程双代号时标网络计划如下图所示，其中工作E的总时差和自由时差为（ ）周。",[295,297,299,301],{"key":20,"text":296,"correct":22},"均为0",{"key":24,"text":298,"correct":22},"均为2",{"key":28,"text":300,"correct":26},"分别为2和0",{"key":31,"text":302,"correct":22},"分别为2和1",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1108635,"在工程网络计划中，关键线路是指（ ）的线路。",[307,309,311,313],{"key":20,"text":308,"correct":26},"双代号时标网络计划中无波形线",{"key":24,"text":310,"correct":22},"单代号搭接网络计划中时距总和最大",{"key":28,"text":312,"correct":22},"双代号网络计划中由关键节点组成",{"key":31,"text":314,"correct":22},"单代号网络计划中由关键工作组成",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},1108636,"某工程单代号网络计划如下图所示，其关键线路有（ ）条。",[319,320,321,322],{"key":20,"text":87,"correct":22},{"key":24,"text":75,"correct":26},{"key":28,"text":77,"correct":22},{"key":31,"text":90,"correct":22},{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":28,"analysis":33},1108637,"在单代号网络计划中，关键线路是指（ ）的线路。",[327,329,331,333],{"key":20,"text":328,"correct":22},"各项工作持续时间之和最小",{"key":24,"text":330,"correct":22},"由关键工作组成",{"key":28,"text":332,"correct":26},"相邻两项工作之间时间间隔均为零",{"key":31,"text":334,"correct":22},"各项工作自由时差均为零",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},1108638,"下列关于时标网络计划的编制方法，说法错误的是（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":26},"时标网络计划宜按各项工作的最迟开始时间编制",{"key":24,"text":342,"correct":22},"在编制时标网络计划时应使每一个节点和每一项工作尽量向左靠",{"key":28,"text":344,"correct":22},"在编制时标网络计划之前，应先按已经确定的时间单位绘制时标网络计划表",{"key":31,"text":346,"correct":22},"必要时，还可以在顶部时间坐标之上或底部时间坐标之下同时加注日历时间",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":20,"analysis":33},1108639,"采用标号法时，网络计划的（ ）就是网络计划终点节点的标号值。",[351,353,355,357],{"key":20,"text":352,"correct":26},"计算工期",{"key":24,"text":354,"correct":22},"要求工期",{"key":28,"text":356,"correct":22},"计划工期",{"key":31,"text":358,"correct":22},"实际工期",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},1108640,"双代号网络计划中，当计划工期等于计算工期时，以关键节点为完成节点的工作的特点是（ ）。",[363,364,366,367],{"key":20,"text":41,"correct":22},{"key":24,"text":365,"correct":22},"总时差必然大于自由时差",{"key":28,"text":43,"correct":22},{"key":31,"text":39,"correct":26},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},1108641,"当双代号网络计划的计算工期等于计划工期时，下列关于关键工作的说法错误的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"关键工作的自由时差为零",{"key":24,"text":375,"correct":22},"相邻两项关键工作之间的时间间隔为零",{"key":28,"text":377,"correct":26},"关键工作的持续时间最长",{"key":31,"text":379,"correct":22},"关键工作的最早开始时间与最迟开始时间相等",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},1108642,"某分部工程双代号网络计划如下图所示，其关键线路是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"①→③→⑤→⑥",{"key":24,"text":387,"correct":26},"①→③→④→⑤→⑥",{"key":28,"text":389,"correct":22},"①→②→③→④→⑤→⑥",{"key":31,"text":391,"correct":22},"①→②→③→⑤→⑥",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1108643,"下列关于工程网络计划关键工作的表述中，正确的是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"双代号网络计划中关键工作两端的节点必为关键节点",{"key":24,"text":399,"correct":22},"双代号网络计划中两端为关键节点的工作必为关键工作",{"key":28,"text":401,"correct":22},"工程网络计划中关键工作的自由时差与总时差全部为零",{"key":31,"text":403,"correct":22},"关键线路上各项工作的持续时间总和应等于网络计划的计划工期",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},1108644,"有 A，B两项连续工作其最早开始时间分别为4天和10天，持续时间分别为4天和5天，则A工作的自由时差是（ ）天。",[408,409,410,411],{"key":20,"text":75,"correct":26},{"key":24,"text":77,"correct":22},{"key":28,"text":90,"correct":22},{"key":31,"text":79,"correct":22},{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":31,"analysis":33},1108645,"当本工作有紧后工作时，其自由时差等于所有紧后工作最早开始时间与本工作（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"最早开始时间之差的最大值",{"key":24,"text":419,"correct":22},"最早开始时间之差的最小值",{"key":28,"text":421,"correct":22},"最早完成时间之差的最大值",{"key":31,"text":423,"correct":26},"最早完成时间之差的最小值",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},1108646,"在某工程网络计划中，工作H的最早开始时间为第7天，持续时间为8天；工作H有三项紧后工作，它们的最早开始时间分别为第18天、第19天和第17天，最迟开始时间分别为第20天、21天和第23天，则工作H的总时差和自由时差分别为（ ）天。",[428,430,432,434],{"key":20,"text":429,"correct":26},"5；2",{"key":24,"text":431,"correct":22},"5；5",{"key":28,"text":433,"correct":22},"4；2",{"key":31,"text":435,"correct":22},"11；8",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1108647,"在工程网络计划中，某项工作的最迟开始时间与最早开始时间的差值为该工作的（ ）。",[440,441,443,445],{"key":20,"text":133,"correct":22},{"key":24,"text":442,"correct":22},"搭接时距",{"key":28,"text":444,"correct":22},"自由时差",{"key":31,"text":446,"correct":26},"总时差",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},1108648,"在计算双代号网络计划的时间参数时，工作的最早开始时间应为其所有紧前工作（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"最早完成时间的最小值",{"key":24,"text":454,"correct":26},"最早完成时间的最大值",{"key":28,"text":456,"correct":22},"最迟完成时间的最小值",{"key":31,"text":458,"correct":22},"最迟完成时间的最大值",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},1108649,"在按工作计算法计算双代号网络计划时间参数的过程中，网络计划的计算工期应等于（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":26},"以网络计划终点节点为完成节点的工作的最早完成时间的最大值",{"key":24,"text":466,"correct":22},"紧前工作最早完成时间的最大值",{"key":28,"text":468,"correct":22},"网络计划终点节点的最早时间",{"key":31,"text":470,"correct":22},"网络计划终点节点的最迟时间",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},1108650,"在工程网络计划中，G工作的最早开始时间为第16天，其持续时间为4天，该工作有3项紧后工作，它们的最早开始时间分别为第23天、第24天，第25天，则G工作的自由时差为（ ）天。",[475,476,477,478],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":26},{"key":28,"text":90,"correct":22},{"key":31,"text":79,"correct":22},{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":28,"analysis":33},1108651,"根据网络计划时间参数计算得出的工期称为（ ）。",[483,484,485,486],{"key":20,"text":354,"correct":22},{"key":24,"text":356,"correct":22},{"key":28,"text":352,"correct":26},{"key":31,"text":487,"correct":22},"合同工期",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1108652,"某网络计划在执行中发现B工作还需作业6天，但该工作至计划最迟完成时间尚有4天，则该工作（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"正常",{"key":24,"text":495,"correct":26},"影响总工期2天",{"key":28,"text":497,"correct":22},"影响总工期4天",{"key":31,"text":499,"correct":22},"影响总工期6天",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1108653,"在工程网络计划执行过程中，如果某项工作实际进度拖延的时间超过其自由时差，则该工作（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"必定影响其紧后工作的最早开始时间",{"key":24,"text":507,"correct":22},"必定变为关键工作",{"key":28,"text":509,"correct":22},"不会影响其后续工作的正常进行",{"key":31,"text":511,"correct":22},"不会影响工程总工期",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":33},1108654,"根据要求工期和计算工期所确定的作为实施目标的工期称为（ ）。",[516,517,518,519],{"key":20,"text":354,"correct":22},{"key":24,"text":356,"correct":26},{"key":28,"text":352,"correct":22},{"key":31,"text":487,"correct":22},{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},1108655,"双代号网络图绘制时，应尽量避免网络图中工作箭线的交叉。当交叉不可避免时，可以采用（ ）处理。",[524,526,528,530],{"key":20,"text":525,"correct":22},"母线法",{"key":24,"text":527,"correct":22},"S曲线法",{"key":28,"text":529,"correct":26},"过桥法",{"key":31,"text":531,"correct":22},"搭接法",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},1108656,"双代号网络计划中虚工作的含义是指（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"相邻工作间的逻辑关系，只消耗时间",{"key":24,"text":539,"correct":22},"相邻工作间的逻辑关系，只消耗资源",{"key":28,"text":541,"correct":22},"相邻工作间的逻辑关系，消耗资源和时间",{"key":31,"text":543,"correct":26},"相邻工作间的逻辑关系，不消耗资源和时间",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},1108657,"在单代号网络图中，虚拟工作（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":26},"只能出现在网络图的起点节点或终点节点处",{"key":24,"text":551,"correct":22},"同时出现在网络图的起点节点和终点节点处",{"key":28,"text":553,"correct":22},"只能出现在网络图的起点节点处",{"key":31,"text":555,"correct":22},"只能出现在网络图的终点节点处",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},1108658,"网络图中相对于某项工作而言，可以与该工作同时进行的工作即为该工作的（ ）。",[560,561,563,565],{"key":20,"text":169,"correct":22},{"key":24,"text":562,"correct":22},"紧前工作",{"key":28,"text":564,"correct":26},"平行工作",{"key":31,"text":566,"correct":22},"紧后工作",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1108659,"某工程有3个施工过程，依次为：钢筋→模板→混凝土，划分为Ⅰ和Ⅱ施工段编制工程网络进度计划。下列工作逻辑关系中，属于正确工艺关系的是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":26},"模板Ⅰ→混凝土Ⅰ",{"key":24,"text":574,"correct":22},"模板Ⅰ→钢筋Ⅰ",{"key":28,"text":576,"correct":22},"钢筋Ⅰ→钢筋Ⅱ",{"key":31,"text":578,"correct":22},"模板Ⅰ→模板Ⅱ",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":28,"analysis":33},1108660,"在施工进度计划中，工作之间由于劳动力、施工机械、材料和构配件等资源的组织和安排需要而形成的逻辑关系，称为()。",[583,585,587,589],{"key":20,"text":584,"correct":22},"依次关系",{"key":24,"text":586,"correct":22},"搭接关系",{"key":28,"text":588,"correct":26},"组织关系",{"key":31,"text":590,"correct":22},"工艺关系",[592,595,598,601,604,607],{"id":15,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":15},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]