[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,27,50,2641,[13,34,46,58,70,82,94,106,118,130,142,154,166,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,426,437,449,461,473,485,497,505,514,526,538,550,558,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1108559,1,"单选题","在某工程双代号网络计划中，如果以某关键节点为完成节点的工作共有3项，则该3项工作（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","全部为关键工作",false,{"key":24,"text":25,"correct":26},"B","至少有一项为关键工作",true,{"key":28,"text":29,"correct":22},"C","自由时差相等",{"key":31,"text":32,"correct":22},"D","总时差相等","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1108560,"在某工程单代号搭接网络计划中，关键线路是指（ ）的线路。",[38,40,42,44],{"key":20,"text":39,"correct":22},"相邻两项工作之间的时距之和最大",{"key":24,"text":41,"correct":26},"相邻两项工作之间时间间隔全部为零",{"key":28,"text":43,"correct":22},"工作的持续时间总和最大",{"key":31,"text":45,"correct":22},"相邻两项工作之间的时距全部为零",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1108561,"在双代号网络计划中，当计划工期等于计算工期时，如果某项工作的开始节点和完成节点均为关键节点，则该工作的（ ）相等。",[50,52,54,56],{"key":20,"text":51,"correct":26},"总时差与自由时差",{"key":24,"text":53,"correct":22},"最早开始时间与最迟开始时间",{"key":28,"text":55,"correct":22},"最早完成时间与最迟完成时间",{"key":31,"text":57,"correct":22},"时间间隔与自由时差",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1108562,"某工程单代号搭接网络计划如下图所示，其中B和D工作的最早开始时间是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"4和4",{"key":24,"text":65,"correct":22},"6和7",{"key":28,"text":67,"correct":26},"2和0",{"key":31,"text":69,"correct":22},"2和2",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1108563,"关于多级网络计划系统的编制，说法错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"自顶向下逐层编制，先总体、再局部、后细部",{"key":24,"text":77,"correct":22},"分级的多少应视工程规模、复杂程度及组织管理的需要而定",{"key":28,"text":79,"correct":22},"分级编制网络计划应与科学编码相结合，以便于利用计算机进行绘图、计算和管理",{"key":31,"text":81,"correct":26},"总体计划应由管理层编制",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1108565,"在工程网络计划中，关键工作是指（ ）的工作。",[86,88,90,92],{"key":20,"text":87,"correct":22},"双代号时标网络计划中无波形线",{"key":24,"text":89,"correct":22},"双代号网络计划中开始节点为关键节点",{"key":28,"text":91,"correct":26},"最迟完成时间与最早完成时间的差值最小",{"key":31,"text":93,"correct":22},"单代号搭接网络计划中时距最小",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1108566,"某工程单代号搭接网络计划中工作 B、 D、E之间的搭接关系和时间参数如下图所示。工作D和工作E的总时差分别为6天和2天，则工作B的总时差为（ ）天。",[98,100,102,104],{"key":20,"text":99,"correct":22},"3",{"key":24,"text":101,"correct":22},"8",{"key":28,"text":103,"correct":26},"9",{"key":31,"text":105,"correct":22},"12",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1108567,"在搭接网络计划中，工作之间的搭接关系是由（ ）决定的。",[110,112,114,116],{"key":20,"text":111,"correct":26},"相邻两项工作之间的不同时距",{"key":24,"text":113,"correct":22},"相邻两项工作之间的不同流水节拍",{"key":28,"text":115,"correct":22},"相邻两项工作之间的不同步距",{"key":31,"text":117,"correct":22},"相邻两项工作之间的最早开始时间",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1108568,"在工程网络计划执行过程中，如果某项非关键工作实际进度拖延的时间超过其总时差，则（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"网络计划的计算工期不会改变",{"key":24,"text":125,"correct":22},"该工作的总时差不变",{"key":28,"text":127,"correct":22},"该工作的自由时差不变",{"key":31,"text":129,"correct":26},"网络计划中关键线路改变",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1108569,"某工程的双代号网络计划如下图所示（单位：天），该网络计划的关键线路为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"①→③→⑤→⑥",{"key":24,"text":137,"correct":26},"①→③→④→⑤→⑥",{"key":28,"text":139,"correct":22},"①→②→③→④→⑤→⑥",{"key":31,"text":141,"correct":22},"①→②→③→⑤→⑥",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1108570,"双代号网络计划中，用来快速寻求计算工期和关键线路的方法是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"时间间隔法",{"key":24,"text":149,"correct":22},"节点计算法",{"key":28,"text":151,"correct":26},"标号法",{"key":31,"text":153,"correct":22},"工作计算法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1108571,"网络计划的计算工期就是网络计划（ ）的标号值。",[158,160,162,164],{"key":20,"text":159,"correct":22},"起始节点",{"key":24,"text":161,"correct":26},"终点节点",{"key":28,"text":163,"correct":22},"关键节点",{"key":31,"text":165,"correct":22},"关键工作",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1108572,"某工程单代号搭接网络计划中工作 B、 D、E之间的搭接关系和时间参数如下图所示。工作D和工作E的总时差分别为5天和2天，则工作B的总时差为（ ）天。",[170,171,172,173],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":22},{"key":28,"text":103,"correct":26},{"key":31,"text":105,"correct":22},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},1108573,"单代号搭接网络计划中，计算相邻两项工作之间的时间间隔，当EFj>（ESi+STFi，j）时距时，（ ），可以断定工作i和工作j存在时间间隔LAGi，j。",[178,180,182,184],{"key":20,"text":179,"correct":22},"搭接关系为FTS",{"key":24,"text":181,"correct":22},"搭接关系为STS",{"key":28,"text":183,"correct":22},"搭接关系为FTF",{"key":31,"text":185,"correct":26},"搭接关系为STF",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":28,"analysis":33},1108574,"在单代号搭接网络图中，工作G的持续时间为4天，紧前工作有 D、E工作。工作D→G之间的搭接关系为STF=12天，工作E→G之间的搭接关系为STS=6天， D、E工作的时间参数如下图所示，则G工作的最早开始时间为（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"12天",{"key":24,"text":193,"correct":22},"14天",{"key":28,"text":195,"correct":26},"16天",{"key":31,"text":197,"correct":22},"18天",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1108575,"某分部工程单代号搭接网络计划如下图所示，其中关键工作是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"工作A和工作B",{"key":24,"text":205,"correct":22},"工作B和工作D",{"key":28,"text":207,"correct":22},"工作C和工作E",{"key":31,"text":209,"correct":26},"工作C和工作D",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":28,"analysis":33},1108576,"相邻两项工作之间存在两种时距及以上的搭接关系时，应（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"分别计算出时间间隔，然后取其中的最大值",{"key":24,"text":217,"correct":22},"分别计算出时间间隔，然后取其中的最大公约数",{"key":28,"text":219,"correct":26},"分别计算出时间间隔，然后取其中的最小值",{"key":31,"text":221,"correct":22},"计算其中最大的时间间隔",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1108577,"如果在搭接网络计划中出现EFj>（EFi+FTFi，j）的情况下，说明（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":26},"工作i和工作j之间存在时间间隔LAGi，j",{"key":24,"text":229,"correct":22},"工作i和工作j之间不存在时间间隔LAGi，j",{"key":28,"text":231,"correct":22},"相邻两项工作之间不存在搭接关系",{"key":31,"text":233,"correct":22},"相邻两项工作之间存在两种时距",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1108578,"工程网络计划中，对关键线路描述正确的是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"双代号网络计划中由关键节点组成",{"key":24,"text":241,"correct":26},"单代号网络计划中时间间隔均为零",{"key":28,"text":243,"correct":22},"双代号时标网络计划中无虚工作",{"key":31,"text":245,"correct":22},"单代号网络计划中由关键工作组成",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},1108579,"某工程单代号网络计划如下图所示（时间单位：天），下列说法错误的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"工作E是非关键工作",{"key":24,"text":253,"correct":22},"工作B的自由时差为0",{"key":28,"text":255,"correct":22},"工作D的总时差为2天",{"key":31,"text":257,"correct":26},"工作F的最迟开始时间为21天",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1108580,"单代号网络计划中工作与其紧后工作之间的时间间隔应等于（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"其紧后工作的最早开始时间与该工作的最早开始时间之差",{"key":24,"text":265,"correct":26},"其紧后工作的最早开始时间与该工作的最早完成时间之差",{"key":28,"text":267,"correct":22},"其紧后工作的最迟开始时间与该工作的最迟完成时间之差",{"key":31,"text":269,"correct":22},"其紧后工作的最早完成时间与该工作的最早完成时间之差",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},1108582,"下列关于双代号网络图与单代号网络图的描述正确的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":26},"双代号网络图的虚箭线不消耗资源",{"key":24,"text":277,"correct":22},"单代号网络图的箭线不能反映工作之间的逻辑关系",{"key":28,"text":279,"correct":22},"单代号网络图中可能出现虚箭线",{"key":31,"text":281,"correct":22},"双代号网络图的箭线不消耗时间",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":28,"analysis":33},1108583,"工程网络图的绘制原则，错误的是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"单代号网络图的绘制比双代号网络图的绘制容易",{"key":24,"text":289,"correct":22},"网络图中所有节点都必须有编号",{"key":28,"text":291,"correct":26},"双代号网络图中的节点可以用矩形表示",{"key":31,"text":293,"correct":22},"单代号网络图中的节点可以用圆圈或矩形表示",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},1108584,"建设工程多级网络计划系统的编制应采用（ ）的方法。",[298,300,302,304],{"key":20,"text":299,"correct":22},"自下向上.分级编制",{"key":24,"text":301,"correct":26},"自顶向下.分级编制",{"key":28,"text":303,"correct":22},"自顶向下.整体编制",{"key":31,"text":305,"correct":22},"自下向上.整体编制",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},1108585,"关于工程网络计划费用优化的说法，正确的是（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":26},"缩短持续时间的工作不能变成非关键工作",{"key":24,"text":313,"correct":22},"缩短持续时间的工作应为直接费最小的关键工作",{"key":28,"text":315,"correct":22},"必要时可调整关键工作之间的逻辑关系",{"key":31,"text":317,"correct":22},"工程总费用会随着工期的缩短而增加",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":31,"analysis":33},1108586,"工程网络计划费用优化过程中，压缩关键工作的持续时间应遵循的基本原则是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"必须将关键工作压缩成非关键工作",{"key":24,"text":325,"correct":22},"压缩后工作的持续时间不能小于其总时差",{"key":28,"text":327,"correct":22},"优先选择压缩综合费率最小的关键工作",{"key":31,"text":329,"correct":26},"多条关键线路的持续时间应压缩相同数值",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1108587,"在费用优化中，费率差表示（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":26},"工期缩短单位时间时工程总费用增加的数值",{"key":24,"text":337,"correct":22},"工期缩短单位时间时工程直接费用增加的数值",{"key":28,"text":339,"correct":22},"工期缩短时间内工程总费用增加的数值",{"key":31,"text":341,"correct":22},"工期缩短时间内工程直接费用增加的数值",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},1108588,"停止费用优化时，应满足的要求是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":26},"压缩对象的直接费用率或组合直接费用率大于工程间接费用率",{"key":24,"text":349,"correct":22},"压缩对象的直接费用率或组合直接费用率小于工程间接费用率",{"key":28,"text":351,"correct":22},"压缩对象的直接费用率或组合直接费用率等于工程间接费用率",{"key":31,"text":353,"correct":22},"压缩对象的直接费用率或组合直接费用率与工程间接费用率没有关系",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},1108589,"工程总费用由直接费和间接费组成，随着工期的缩短，直接费和间接费的变化规律是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"直接费减少，间接费增加",{"key":24,"text":361,"correct":22},"直接费和间接费均增加",{"key":28,"text":363,"correct":26},"直接费增加，间接费减少",{"key":31,"text":365,"correct":22},"直接费和间接费均减少",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1108590,"对下面双代号网络图进行工期优化，当各工作压缩费率如下表所示时，欲压缩总工期1天，应当选择（ ）进行压缩。",[370,372,374,376],{"key":20,"text":371,"correct":22},"工作A",{"key":24,"text":373,"correct":26},"工作B",{"key":28,"text":375,"correct":22},"工作C",{"key":31,"text":377,"correct":22},"工作D",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1108591,"网络计划的费用优化压缩被压缩对象到（ ）为止。",[382,384,386,388],{"key":20,"text":383,"correct":26},"直接费用率或组合大于工程间接费用率",{"key":24,"text":385,"correct":22},"直接费用率或组合小于工程间接费用率",{"key":28,"text":387,"correct":22},"直接费用率或组合等于工程间接费用率",{"key":31,"text":389,"correct":22},"直接费用率或组合最小",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1108592,"网络计划工期优化的前提是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"计算工期不满足计划工期",{"key":24,"text":397,"correct":26},"不改变各项工作之间的逻辑关系",{"key":28,"text":399,"correct":22},"计划工期不满足计算工期",{"key":31,"text":401,"correct":22},"将关键工作压缩成非关键工作",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1108593,"当工程网络计划的计算工期大于要求工期时，为满足要求工期，进行工期优化的基本方法是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"减少相邻工作之间的时间间隔",{"key":24,"text":409,"correct":26},"缩短关键工作的持续时间",{"key":28,"text":411,"correct":22},"减少相邻工作之间的时距",{"key":31,"text":413,"correct":22},"缩短关键工作的总时差",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":33},1108594,"工程网络计划工期优化过程中，首先应选择压缩持续时间的工作是（ ）的关键工作。",[418,420,422,424],{"key":20,"text":419,"correct":26},"缩短时间对质量和安全影响不大",{"key":24,"text":421,"correct":22},"工程变更程序相对简单",{"key":28,"text":423,"correct":22},"资源消耗比较均衡",{"key":31,"text":425,"correct":22},"直接成本最小",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},1108595,"某工程双代号网络计划中，工作N的持续时间为4天，相关节点的最早时间和最迟时间如下图所示，则工作N的自由时差是（ ）天。",[430,432,434,435],{"key":20,"text":431,"correct":22},"1",{"key":24,"text":433,"correct":22},"2",{"key":28,"text":99,"correct":26},{"key":31,"text":436,"correct":22},"4",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1108596,"属于建设工程进度计划表达方式的是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"进度计划表",{"key":24,"text":444,"correct":22},"投资计划年度分配表",{"key":28,"text":446,"correct":22},"工程项目进度平衡表",{"key":31,"text":448,"correct":22},"年度计划项目表",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},1108597,"编制时标网络计划时，间接绘制法是指（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"不计算时间参数而直接按无时标的网络计划草图绘制时标网络计划",{"key":24,"text":456,"correct":22},"计算时间参数而直接按无时标的网络计划草图绘制时标网络计划",{"key":28,"text":458,"correct":22},"不计算时间参数而直接按有时标的网络计划草图绘制时标网络计划",{"key":31,"text":460,"correct":26},"根据无时标的网络计划草图在时标网络计划表中进行绘制",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1108598,"不能示出整个工程的开工日期和完工日期以及各项工作的开始日期和完成日期的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"计算坐标体系",{"key":24,"text":468,"correct":26},"工作日坐标体系",{"key":28,"text":470,"correct":22},"日历坐标体系",{"key":31,"text":472,"correct":22},"时间坐标体系",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},1108599,"某工程双代号时标网络计划如下图所示，如果 B、 D、I三项工作共用一台施工机械且必须顺序施工，则总工期（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"会延长2周，但施工机械在现场不会闲置",{"key":24,"text":480,"correct":22},"会延长2周，且施工机械会在现场闲置6周",{"key":28,"text":482,"correct":26},"不会延长，且施工机械在现场也不会闲置",{"key":31,"text":484,"correct":22},"不会延长，但施工机械会在现场闲置2周",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":28,"analysis":33},1108600,"某工程双代号时标网络计划如下图所示，其中工作H的总时差和自由时差（ ）周。",[489,491,493,495],{"key":20,"text":490,"correct":22},"均为1",{"key":24,"text":492,"correct":22},"分别为3和0",{"key":28,"text":494,"correct":26},"分别为3和2",{"key":31,"text":496,"correct":22},"均为0",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},1108601,"某工程双代号时标网络计划如下图所示，如果其中的 B、C和G三项工作共用一台施工机械而必须顺序施工，则在不影响总工期及工作工艺关系的前提下，该施工机械在施工现场的最小闲置时间是（ ）周。",[501,502,503,504],{"key":20,"text":431,"correct":26},{"key":24,"text":433,"correct":22},{"key":28,"text":99,"correct":22},{"key":31,"text":436,"correct":22},{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":28,"analysis":33},1108602,"某工程双代号时标网络计划如下图所示，其中工作G的总时差为（ ）周。",[509,510,511,512],{"key":20,"text":433,"correct":22},{"key":24,"text":99,"correct":22},{"key":28,"text":436,"correct":26},{"key":31,"text":513,"correct":22},"5",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":28,"analysis":33},1108603,"A工作后有紧后工作 B、 C，它们的持续时间分别为5d、4d和6d；BC工作最迟完成时间分别为25d和23d，则A工作的最迟开始时间为（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"4d",{"key":24,"text":521,"correct":22},"8d",{"key":28,"text":523,"correct":26},"12d",{"key":31,"text":525,"correct":22},"16d",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},1108604,"在某工程双代号网络计划中，工作N的最早开始时间和最迟开始时间分别为第20天和第25天，其持续时间为9天。该工作有两项紧后工作，它们的最早开始时间分别为第32天和第34天，则工作N的总时差和自由时差分别为（ ）天。",[530,532,534,536],{"key":20,"text":531,"correct":22},"3和0",{"key":24,"text":533,"correct":22},"3和2",{"key":28,"text":535,"correct":22},"5和0",{"key":31,"text":537,"correct":26},"5和3",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},1108605,"在双代号网络计划的时间参数计算中，除以网络计划终点节点为完成节点的工作外，其他工作的最迟完成时间应等于其紧后工作（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":26},"最迟开始时间的最小值",{"key":24,"text":545,"correct":22},"最迟开始时间的最大值",{"key":28,"text":547,"correct":22},"最迟完成时间的最小值",{"key":31,"text":549,"correct":22},"最迟完成时间的最大值",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":28,"analysis":33},1108606,"某工程双代号网络计划中，工作M的持续时间为5天，相关节点的最早时间和最迟时间如下图所示，则工作M的总时差是（ ）天。",[554,555,556,557],{"key":20,"text":431,"correct":22},{"key":24,"text":433,"correct":22},{"key":28,"text":99,"correct":26},{"key":31,"text":436,"correct":22},{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1108607,"在某工程双代号网络计划中，工作M的最早开始时间为第15天，其持续时间为7天。该工作有两项紧后工作，它们的最早开始时间分别为第27天和第30天，最迟开始时间分别为第28天和第33天，则工作M的总时差和自由时差为（ ）天。",[562,564,566,568],{"key":20,"text":563,"correct":22},"均为5",{"key":24,"text":565,"correct":26},"6和5",{"key":28,"text":567,"correct":22},"均为6",{"key":31,"text":569,"correct":22},"11和6",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":28,"analysis":33},1108608,"某工程双代号网络计划如图所示，其中E工作的最早开始时间和最迟开始时间是（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"3和5",{"key":24,"text":577,"correct":22},"3和6",{"key":28,"text":579,"correct":26},"4和5",{"key":31,"text":581,"correct":22},"4和6",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},1108609,"某工程双代号网络计划如下图所示，图中已标出的各个节点的最早时间和最迟时间，该计划表明（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"工作1-2的自由时差为2",{"key":24,"text":589,"correct":26},"工作2-5的总时差为7",{"key":28,"text":591,"correct":22},"工作4-6的总时差为零",{"key":31,"text":593,"correct":22},"工作3-5为关键工作",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":28,"analysis":33},1108610,"在工程网络计划中，如果某项工作的最早开始时间和最早完成时间分别为2天和6天，则该工作实际上最早应从开工后（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"第2天上班时刻开始，第6天下班时刻完成",{"key":24,"text":601,"correct":22},"第2天上班时刻开始，第7天下班时刻完成",{"key":28,"text":603,"correct":26},"第3天上班时刻开始，第6天下班时刻完成",{"key":31,"text":605,"correct":22},"第3天上班时刻开始，第7天下班时刻完成",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]