[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":576},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,26,50,2641,[13,34,46,58,70,82,94,106,118,130,142,154,163,175,187,198,207,215,227,238,250,262,269,277,287,299,311,319,331,340,348,358,370,379,391,403,411,423,435,447,459,471,483,495,507,519,528,540,552,564],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1108509,1,"单选题","某住宅楼由六个单元组成，其基础工程施工时，拟分成三段组织流水施工，土方开挖总量为9600m3，选用两台挖土机进行施工，采用一班作业，两台挖掘机的台班产量定额均为100m3，则流水节拍应为（ ）天。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","48",false,{"key":24,"text":25,"correct":22},"B","32",{"key":27,"text":28,"correct":29},"C","16",true,{"key":31,"text":32,"correct":22},"D","8","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1108510,"组织流水施工时，划分施工段的最根本目的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"提供工艺或组织间歇时间",{"key":24,"text":41,"correct":22},"可增加更多的专业工作队",{"key":27,"text":43,"correct":22},"满足施工工艺的要求",{"key":31,"text":45,"correct":29},"组织流水施工",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1108511,"在流水施工的横道图表示法中，纵坐标表示（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"施工过程的名称或编号",{"key":24,"text":53,"correct":22},"施工段的编号",{"key":27,"text":55,"correct":22},"施工进度",{"key":31,"text":57,"correct":22},"流水施工所处的空间位置",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1108512,"关于平行施工组织方式的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"专业工作队能够保持连续施工",{"key":24,"text":65,"correct":22},"单位时间内投入的资源量较均衡",{"key":27,"text":67,"correct":29},"能充分利用工作面且工期短",{"key":31,"text":69,"correct":22},"专业工作队能够最大限度地搭接施工",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1108513,"在下列施工组织方式中，不能实现工作专业化施工的组织方式是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"依次施工和平行施工",{"key":24,"text":77,"correct":22},"平行施工和流水施工",{"key":27,"text":79,"correct":22},"搭接施工和平行施工",{"key":31,"text":81,"correct":22},"依次施工和流水施工",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1108514,"（ ）方式是组织几个劳动组织相同的工作队，在同一时间、不同的空间，按施工工艺要求完成各施工对象。",[86,88,90,92],{"key":20,"text":87,"correct":22},"依次施工",{"key":24,"text":89,"correct":29},"平行施工",{"key":27,"text":91,"correct":22},"流水施工",{"key":31,"text":93,"correct":22},"分段施工",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1108515,"生产性工作之间由工艺过程决定的、非生产性工作之间由工作程序决定的先后顺序关系称为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"工艺关系",{"key":24,"text":101,"correct":22},"组织关系",{"key":27,"text":103,"correct":22},"施工关系",{"key":31,"text":105,"correct":22},"进度关系",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1108516,"关于双代号网络计划中的虚箭线，下列说法中不正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"虚箭线主要用来表达相关工作的逻辑关系",{"key":24,"text":113,"correct":22},"虚箭线所代表的工作不消耗时间",{"key":27,"text":115,"correct":29},"虚箭线代表的可能是虚工作，也可能是实工作",{"key":31,"text":117,"correct":22},"虚箭线所代表的工作不消耗资源",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1108517,"某双代号网络计划中，工作M的最早开始时间和最迟开始时间分别为第12天和第17天，其持续时间为5天。工作M有3项紧后工作，它们的最早开始时间分别为第21天、第24天和第28天，则工作M的自由时差和总时差分别为（ ）天。",[122,124,126,128],{"key":20,"text":123,"correct":22},"1，4",{"key":24,"text":125,"correct":22},"3，3",{"key":27,"text":127,"correct":29},"4；5",{"key":31,"text":129,"correct":22},"5；5",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1108518,"某分部工程双代号网络计划如下图所示，其关键线路是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"①→③→⑤→⑥",{"key":24,"text":137,"correct":29},"①→③→④→⑤→⑥",{"key":27,"text":139,"correct":22},"①→②→③→④→⑤→⑥",{"key":31,"text":141,"correct":22},"①→②→③→⑤→⑥",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1108519,"某工作有且仅有两个紧后工作 C、 D，其中C工作最早开始时间为10（计算坐标系,下同），最迟完成时间为28，持续时间为15天；D工作最早完成时间为18，最迟完成时间为20，持续时间为6天；该工作与C工作间的时间间隔为2天，与D工作间的时间间隔为4天，则该工作的总时差为（ ）天。",[146,148,150,152],{"key":20,"text":147,"correct":22},"3",{"key":24,"text":149,"correct":22},"4",{"key":27,"text":151,"correct":29},"5",{"key":31,"text":153,"correct":22},"6",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1108520,"在工程网络图中，工作K的最迟完成时间为第20天，其持续时间为6天，该工作有三项紧前工作，它们的最早完成时间分别为第8天、第10天、第12天，则工作K的总时差为（ ）天。",[158,159,160,161],{"key":20,"text":32,"correct":22},{"key":24,"text":153,"correct":22},{"key":27,"text":149,"correct":22},{"key":31,"text":162,"correct":29},"2",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":31,"analysis":33},1108521,"单代号网络计划，非终点节点的工作的自由时差等于（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"本工作与紧前工作时间间隔的最大值",{"key":24,"text":170,"correct":22},"本工作与紧后工作时间间隔的最大值",{"key":27,"text":172,"correct":22},"本工作与紧前工作时间间隔的最小值",{"key":31,"text":174,"correct":29},"本工作与紧后工作时间间隔的最小值",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":27,"analysis":33},1108522,"在不影响其紧后工作最早开始时间的前提下，本工作可利用的机动时间为（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"总时差",{"key":24,"text":182,"correct":22},"最迟开始时间",{"key":27,"text":184,"correct":29},"自由时差",{"key":31,"text":186,"correct":22},"最迟完成时间",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":31,"analysis":33},1108523,"在工程网络计划中，某项工作的自由时差不会超过该工作的（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"总时距",{"key":24,"text":194,"correct":22},"持续时间",{"key":27,"text":196,"correct":22},"间歇时间",{"key":31,"text":180,"correct":29},{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},1108524,"某工程双代号网络计划中，工作M的持续时间为5天，相关节点的最早时间和最迟时间如下图所示，则工作M的总时差是（ ）天。",[202,204,205,206],{"key":20,"text":203,"correct":22},"1",{"key":24,"text":162,"correct":22},{"key":27,"text":147,"correct":29},{"key":31,"text":149,"correct":22},{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":31,"analysis":33},1108525,"某工程双代号网络计划如下图所示，其关键线路有（ ）条。",[211,212,213,214],{"key":20,"text":203,"correct":22},{"key":24,"text":162,"correct":22},{"key":27,"text":147,"correct":22},{"key":31,"text":149,"correct":29},{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":27,"analysis":33},1108526,"某建设工程施工进度计划如下图所示（时间单位：天），则该计划的计算工期是（ ）天。",[219,221,223,225],{"key":20,"text":220,"correct":22},"20",{"key":24,"text":222,"correct":22},"21",{"key":27,"text":224,"correct":29},"23",{"key":31,"text":226,"correct":22},"25",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":24,"analysis":33},1108527,"某工程双代号网络计划如下图所示，其中工作G的最早开始时间为（ ）。",[231,232,234,236],{"key":20,"text":153,"correct":22},{"key":24,"text":233,"correct":29},"9",{"key":27,"text":235,"correct":22},"10",{"key":31,"text":237,"correct":22},"12",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1108528,"某工程单代号网络计划如下图所示（时间单位：天），下列说法错误的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":29},"工作E是关键工作",{"key":24,"text":245,"correct":22},"工作B的自由时差为0",{"key":27,"text":247,"correct":22},"工作D的总时差为2天",{"key":31,"text":249,"correct":22},"工作F的最迟开始时间为22天",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},1108529,"某工程双代号网络计划如图所示，其中E工作的最早开始时间和最迟开始时间是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"3和5",{"key":24,"text":257,"correct":22},"3和6",{"key":27,"text":259,"correct":29},"4和5",{"key":31,"text":261,"correct":22},"4和6",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":264,"answer":24,"analysis":33},1108530,[265,266,267,268],{"key":20,"text":203,"correct":22},{"key":24,"text":162,"correct":29},{"key":27,"text":147,"correct":22},{"key":31,"text":149,"correct":22},{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1108531,"工作A的工作持续时间为3天，该工作有三项紧后工作，工作持续时间分别为4天、6天、3天；最迟完成时间分别为第16天、12天、11天，则工作A的最迟开始时间为第（ ）天。",[273,274,275,276],{"key":20,"text":153,"correct":22},{"key":24,"text":147,"correct":29},{"key":27,"text":32,"correct":22},{"key":31,"text":237,"correct":22},{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":20,"analysis":33},1108532,"在工程网络计划中，某项工作的最早完成时间与其紧后工作的最早开始时间之间的差值称为这两项工作之间的（ ）。",[281,283,284,285],{"key":20,"text":282,"correct":29},"时间间隔",{"key":24,"text":196,"correct":22},{"key":27,"text":184,"correct":22},{"key":31,"text":286,"correct":22},"时距",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":24,"analysis":33},1108533,"在工程网络计划中，工作的最迟开始时间等于本工作的（ ）。",[291,293,295,297],{"key":20,"text":292,"correct":22},"最迟完成时间与其时间间隔之差",{"key":24,"text":294,"correct":29},"最迟完成时间与其持续时间之差",{"key":27,"text":296,"correct":22},"最早开始时间与其持续时间之和",{"key":31,"text":298,"correct":22},"最早开始时间与其时间间隔之和",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":27,"analysis":33},1108534,"在工程网络计划中，工作的最早开始时间应为其所有紧前工作（ ）。",[303,305,307,309],{"key":20,"text":304,"correct":22},"最早开始时间的最大值",{"key":24,"text":306,"correct":22},"最早开始时间的最小值",{"key":27,"text":308,"correct":29},"最早完成时间的最大值",{"key":31,"text":310,"correct":22},"最早完成时间的最小值",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":24,"analysis":33},1108535,"在工程网络计划中，（ ）是指在不影响总工期的前提下，本工作可以利用的机动时间。",[315,316,317,318],{"key":20,"text":282,"correct":22},{"key":24,"text":180,"correct":29},{"key":27,"text":184,"correct":22},{"key":31,"text":286,"correct":22},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},1108536,"最迟完成时间是指（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"在紧前工作的约束下，本工作有可能完成的最迟时刻",{"key":24,"text":326,"correct":22},"在紧后工作的约束下，本工作有可能完成的最迟时刻",{"key":27,"text":328,"correct":22},"在后续工作的约束下，本工作必须完成的最迟时刻",{"key":31,"text":330,"correct":29},"在总工期的约束下，本工作必须完成的最迟时刻",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},1108537,"在工程网络计划中，某项工作的最迟开始时间与最早开始时间的差值为该工作的（ ）。",[335,336,338,339],{"key":20,"text":282,"correct":22},{"key":24,"text":337,"correct":22},"搭接时距",{"key":27,"text":184,"correct":22},{"key":31,"text":180,"correct":29},{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1108538,"在下图的双代号时标网络计划中，如果 A、 E、G三项工作共用一台施工机械而必须顺序施工，则该施工机械在现场的最小闲置时间为（ ）周。",[344,345,346,347],{"key":20,"text":203,"correct":29},{"key":24,"text":162,"correct":22},{"key":27,"text":147,"correct":22},{"key":31,"text":149,"correct":22},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},1108539,"某双代号网络计划中，已知工作A的紧后工作是B和 C，工作B的最迟开始时间为第14天，最早开始时间为第10天；工作C的最迟完成时间为第16天，最早完成时间为第14天；工作A的自由时差为5天，则工作A的总时差为（ ）天。",[352,353,355,356],{"key":20,"text":151,"correct":22},{"key":24,"text":354,"correct":29},"7",{"key":27,"text":233,"correct":22},{"key":31,"text":357,"correct":22},"11",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1108540,"双代号时标网络计划中，当某工作之后有虚工作时，则该工作的自由时差为（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"该工作的波形线的水平长度",{"key":24,"text":365,"correct":29},"本工作与紧后工作间波形线水平长度和的最小值",{"key":27,"text":367,"correct":22},"本工作与紧后工作间波形线水平长度和的最大值",{"key":31,"text":369,"correct":22},"后续所有线路段中波形线中水平长度和的最小值",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1108541,"双代号时标网络计划中，以终点节点为完成节点的工作除外，当计划工期等于计算工期时，这些工作箭线中波形线的水平投影长度表示其（ ）。",[374,375,376,377],{"key":20,"text":180,"correct":22},{"key":24,"text":184,"correct":29},{"key":27,"text":196,"correct":22},{"key":31,"text":378,"correct":22},"搭接时间",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},1108542,"某工程双代号时标网络计划如下图所示，其中工作D的总时差和自由时差（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"均为2周",{"key":24,"text":386,"correct":22},"分别为2周和3周",{"key":27,"text":388,"correct":22},"均为3周",{"key":31,"text":390,"correct":29},"分别为3周和2周",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":27,"analysis":33},1108543,"某工程双代号时标网络计划如下图所示，其中工作H的总时差和自由时差（ ）周。",[395,397,399,401],{"key":20,"text":396,"correct":22},"均为1",{"key":24,"text":398,"correct":22},"分别为2和0",{"key":27,"text":400,"correct":29},"分别为3和2",{"key":31,"text":402,"correct":22},"均为0",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},1108544,"已知网络计划如下图所示，箭线上方括号外为工作名称，括号内为优先压缩顺序；箭线下方括号外为正常持续时间，括号内为最短持续时间，若对其工期进行压缩，应首先压缩工作（ ）。",[407,408,409,410],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":31,"analysis":33},1108545,"工程网络计划资源优化的目的之一是为了寻求（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":22},"工程总成本最低条件下的资源均衡安排",{"key":24,"text":418,"correct":22},"资源均衡使用条件下的最短工期安排",{"key":27,"text":420,"correct":22},"资源使用最少条件下的合理工期安排",{"key":31,"text":422,"correct":29},"资源有限条件下的最短工期安排",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":20,"analysis":33},1108546,"网络计划的费用优化压缩被压缩对象到（ ）为止。",[427,429,431,433],{"key":20,"text":428,"correct":29},"直接费用率或组合大于工程间接费用率",{"key":24,"text":430,"correct":22},"直接费用率或组合小于工程间接费用率",{"key":27,"text":432,"correct":22},"直接费用率或组合等于工程间接费用率",{"key":31,"text":434,"correct":22},"直接费用率或组合最小",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":20,"analysis":33},1108547,"在网络计划的费用优化过程中，缩短持续时间的工作应是（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":29},"直接费用率最小的关键工作",{"key":24,"text":442,"correct":22},"直接费用率最大的关键工作",{"key":27,"text":444,"correct":22},"直接费用率最小的非关键工作",{"key":31,"text":446,"correct":22},"直接费用率最大的非关键工作",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},1108548,"工程网络计划的费用优化是指寻求（ ）的过程。",[451,453,455,457],{"key":20,"text":452,"correct":22},"资源使用均衡时工程总成本最低",{"key":24,"text":454,"correct":22},"工程总成本固定条件下最短工期安排",{"key":27,"text":456,"correct":29},"工程总成本最低时工期安排",{"key":31,"text":458,"correct":22},"工期固定条件下工程总成本最低",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":24,"analysis":33},1108549,"工程网络计划的资源优化的目的是通过（ ），使资源按照时间的分布符合优化目标。",[463,465,467,469],{"key":20,"text":464,"correct":22},"压缩关键工作的持续时间",{"key":24,"text":466,"correct":29},"改变工作的开始时间和完成时间",{"key":27,"text":468,"correct":22},"压缩资源需求量小的工作的持续时间",{"key":31,"text":470,"correct":22},"减少非关键工作的自由时差",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},1108550,"在费用优化时，如果被压缩对象的直接费用率或组合直接费用率等于工程间接费用率时，（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":29},"应压缩关键工作的持续时间",{"key":24,"text":478,"correct":22},"应压缩非关键工作的持续时间",{"key":27,"text":480,"correct":22},"停止缩短关键工作的持续时间",{"key":31,"text":482,"correct":22},"停止缩短非关键工作的持续时间",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":27,"analysis":33},1108551,"对下面双代号网络图进行工期优化，当各工作压缩费率如下所示时，欲压缩总工期1天，应当选择（ ）进行压缩。",[487,489,491,493],{"key":20,"text":488,"correct":22},"工作A",{"key":24,"text":490,"correct":22},"工作B",{"key":27,"text":492,"correct":29},"工作C",{"key":31,"text":494,"correct":22},"工作D",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},1108552,"网络计划工期优化方法中，通过压缩关键工作的持续时间来达到优化目标的前提是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"计算工期不满足计划工期",{"key":24,"text":502,"correct":29},"不改变各项工作之间的逻辑关系",{"key":27,"text":504,"correct":22},"计划工期不满足计算工期",{"key":31,"text":506,"correct":22},"将关键工作压缩成非关键工作",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":31,"analysis":33},1108553,"当工程网络计划的工期优化过程中出现多条关键线路时，必须（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"将持续时间最长的关键工作压缩为非关键工作",{"key":24,"text":514,"correct":22},"压缩各条关键线路上直接费最小的工作的持续时间",{"key":27,"text":516,"correct":22},"压缩各条关键线路上持续时间最长的工作的持续时间",{"key":31,"text":518,"correct":29},"将各条关键线路的总持续时间压缩相同数值",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},1108554,"工程网络计划的工期优化是指通过（ ）而使计算工期满足要求工期。",[523,524,526,527],{"key":20,"text":464,"correct":29},{"key":24,"text":525,"correct":22},"改变关键工作之间的逻辑关系",{"key":27,"text":468,"correct":22},{"key":31,"text":470,"correct":22},{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},1108555,"关于多级网络计划系统的特点，叙述不正确的是（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":29},"多级网络计划系统的编制过程是一个从底层到顶层、由细到粗的过程",{"key":24,"text":535,"correct":22},"多级网络计划系统中的层级与建设工程规模、复杂程度及进度控制的需要有关",{"key":27,"text":537,"correct":22},"在多级网络计划系统中，不同层级的网络计划，应该由不同层级的进度控制人员编制",{"key":31,"text":539,"correct":22},"多级网络计划系统可以随时进行分解和综合",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":27,"analysis":33},1108556,"相邻两项工作之间存在两种时距及以上的搭接关系时，应（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"分别计算出时间间隔，然后取其中的最大值",{"key":24,"text":547,"correct":22},"分别计算出时间间隔，然后取其中的最大公约数",{"key":27,"text":549,"correct":29},"分别计算出时间间隔，然后取其中的最小值",{"key":31,"text":551,"correct":22},"计算其中最大的时间间隔",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":27,"analysis":33},1108557,"在单代号网络计划中，关键线路是指（ ）的线路。",[556,558,560,562],{"key":20,"text":557,"correct":22},"各项工作持续时间之和最小",{"key":24,"text":559,"correct":22},"由关键工作组成",{"key":27,"text":561,"correct":29},"相邻两项工作之间时间间隔均为零",{"key":31,"text":563,"correct":22},"各项工作自由时差均为零",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":27,"analysis":33},1108558,"当双代号网络计划的计算工期等于计划工期时，下列关于关键工作的说法错误的是（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"关键工作的自由时差为零",{"key":24,"text":571,"correct":22},"相邻两项关键工作之间的时间间隔为零",{"key":27,"text":573,"correct":29},"关键工作的持续时间最长",{"key":31,"text":575,"correct":22},"关键工作的最早开始时间与最迟开始时间相等",[577,580,583,586,589,592],{"id":15,"name":578,"category":7,"favorite":579},"领导干部任职前廉政法规知识测试题",92,{"id":581,"name":582,"category":7,"favorite":15},595,"建筑结构与设备",{"id":584,"name":585,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":587,"name":588,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":590,"name":591,"category":7,"favorite":8},534,"BIM工程师",{"id":593,"name":591,"category":7,"favorite":8},535]