[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":558},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,25,50,2641,[13,34,46,58,70,82,91,103,115,127,139,151,161,173,185,197,206,216,228,240,250,259,267,275,287,299,309,321,333,344,353,365,377,389,401,413,422,432,440,448,456,468,480,490,501,508,516,524,535,547],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1108456,1,"单选题","某建筑物基础工程的施工过程、施工段划分和流水节拍（天）见下表。如果组织非节奏流水施工，则基础二浇筑完工时间为第（ ）天。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","9",true,{"key":24,"text":25,"correct":26},"B","11",false,{"key":28,"text":29,"correct":26},"C","14",{"key":31,"text":32,"correct":26},"D","15","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1108459,"建设工程组织流水施工时，如果存在间歇时间和提前插入时间，则（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"间歇时间会使流水施工工期延长，而提前插入时间会使流水施工工期缩短",{"key":24,"text":41,"correct":26},"间歇时间会使流水施工工期缩短，而提前插入时间会使流水施工工期延长",{"key":28,"text":43,"correct":26},"无论是间歇时间还是提前插入时间，均会使流水施工工期延长",{"key":31,"text":45,"correct":26},"无论是间歇时间还是提前插入时间，均会使流水施工工期缩短",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1108460,"每个作业的工人或每台施工机械所需工作面的大小，取决于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"划分施工段的数目",{"key":24,"text":53,"correct":26},"安全施工的要求",{"key":28,"text":55,"correct":22},"单位时间内其完成的工程量和安全施工的要求",{"key":31,"text":57,"correct":26},"单位时间内其完成的工程量",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1108461,"下列计算式中，对流水节拍的计算正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"流水节拍=工程量\u002F（计划产量定额×人数×工作班次）",{"key":24,"text":65,"correct":26},"流水节拍=工程量\u002F工程分段个数",{"key":28,"text":67,"correct":26},"流水节拍=工程量\u002F工程分包商个数",{"key":31,"text":69,"correct":26},"流水节拍=工程量\u002F工程施工时间×单位施工费用",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1108462,"（ ）表明流水施工的速度和节奏性。",[74,76,78,80],{"key":20,"text":75,"correct":22},"流水节拍",{"key":24,"text":77,"correct":26},"流水步距",{"key":28,"text":79,"correct":26},"流水强度",{"key":31,"text":81,"correct":26},"施工过程",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1108463,"建设工程组织流水施工时，某专业工作队在单位时间内所完成的工程量称为（ ）。",[86,87,88,89],{"key":20,"text":75,"correct":26},{"key":24,"text":77,"correct":26},{"key":28,"text":79,"correct":22},{"key":31,"text":90,"correct":26},"流水节奏",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":28,"analysis":33},1108464,"将拟建工程项目中的每一个施工对象分解为若干个施工过程，并按照施工过程成立相应的专业工作队，各专业队按照施工顺序依次完成各个施工对象的施工过程，同时保证施工在时间和空间上连续、均衡和有节奏地进行，使相邻两专业队能最大限度地搭接作业。这种方式的施工是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":26},"依次施工",{"key":24,"text":98,"correct":26},"平行施工",{"key":28,"text":100,"correct":22},"流水施工",{"key":31,"text":102,"correct":26},"混合施工",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},1108465,"建设工程采用流水施工方式的特点是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":26},"施工现场的组织管理比较简单",{"key":24,"text":110,"correct":22},"各工作队实现了专业化施工",{"key":28,"text":112,"correct":26},"单位时间内投入的资源量较少",{"key":31,"text":114,"correct":26},"能够以最短工期完成施工任务",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},1108466,"考虑建设工程的施工特点、工艺流程、资源利用、平面或空间布置等要求，可采用不同的施工组织方式，其中有利于资源供应的施工组织方式是（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":26},"依次施工和平行施工",{"key":24,"text":122,"correct":26},"平行施工和流水施工",{"key":28,"text":124,"correct":26},"搭接施工和平行施工",{"key":31,"text":126,"correct":22},"依次施工和流水施工",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},1108468,"某分部工程由4个施工过程（基础工程、结构安装、室内装修、室外工程）组成，分为5个施工段。流水节拍均为3天，无组织间歇时间和工艺间歇时间，但施工过程室外工程需提前2天插入施工，该分部工程的工期为（ ）天。",[131,133,135,137],{"key":20,"text":132,"correct":26},"21",{"key":24,"text":134,"correct":22},"22",{"key":28,"text":136,"correct":26},"26",{"key":31,"text":138,"correct":26},"27",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":31,"analysis":33},1108469,"某分部工程有3个施工过程，各分为3个施工段组织加快的成倍节拍流水施工，各施工过程在各施工段上的流水节拍分别为6、4、6天，则专业工作队数应为（ ）个。",[143,145,147,149],{"key":20,"text":144,"correct":26},"3",{"key":24,"text":146,"correct":26},"5",{"key":28,"text":148,"correct":26},"6",{"key":31,"text":150,"correct":22},"8",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},1108470,"某建设工程划分为4个施工过程，3个施工段组织加快的成倍节拍流水施工，流水节拍分别为4天、6天、4天和2天，则流水步距为（ ）天。",[155,157,158,160],{"key":20,"text":156,"correct":22},"2",{"key":24,"text":144,"correct":26},{"key":28,"text":159,"correct":26},"4",{"key":31,"text":148,"correct":26},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":33},1108471,"固定节拍流水施工与加快的成倍节拍流水施工相比较，共同的特点是（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":22},"相邻专业工作队的流水步距相等",{"key":24,"text":168,"correct":26},"专业工作队数等于施工过程数",{"key":28,"text":170,"correct":26},"不同施工过程的流水节拍均相等",{"key":31,"text":172,"correct":26},"专业工作队数等于施工段数",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},1108472,"流水施工的基本组织方式包括（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":22},"非节奏流水施工、有节奏流水施工",{"key":24,"text":180,"correct":26},"异节奏流水施工、等节奏流水施工",{"key":28,"text":182,"correct":26},"非节奏流水施工、等节奏流水施工",{"key":31,"text":184,"correct":26},"等节奏流水施工、有节奏流水施工",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":28,"analysis":33},1108473,"工作面的大小表明（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":26},"能划分施工段的多少",{"key":24,"text":192,"correct":26},"空间位置的多少",{"key":28,"text":194,"correct":22},"能安排施工人数或机械台数的多少",{"key":31,"text":196,"correct":26},"能完成工程量的多少",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":28,"analysis":33},1108474,"某分部工程有4个施工过程，分为3个施工段组织加快的成倍节拍流水施工。已知各施工过程的流水节拍分别为4天、6天、4天和2天，则拟采用的专业工作队应为（ ）个。",[201,202,203,204],{"key":20,"text":159,"correct":26},{"key":24,"text":146,"correct":26},{"key":28,"text":150,"correct":22},{"key":31,"text":205,"correct":26},"12",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":24,"analysis":33},1108475,"关于加快的成倍节拍流水施工的特点叙述正确的是（ ）。",[210,212,213,214],{"key":20,"text":211,"correct":26},"不同施工过程的流水节拍相等",{"key":24,"text":166,"correct":22},{"key":28,"text":168,"correct":26},{"key":31,"text":215,"correct":26},"施工段之间可以有空闲时间",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":24,"analysis":33},1108476,"组织流水施工时，成倍节拍流水施工的特点（ ）。",[220,222,224,226],{"key":20,"text":221,"correct":26},"相同施工过程的流水步距相等，且等于流水节拍",{"key":24,"text":223,"correct":22},"专业施工队数大于等于施工过程数",{"key":28,"text":225,"correct":26},"施工段之间没有空闲时间",{"key":31,"text":227,"correct":26},"同一施工过程在各个施工段上的流水节拍成倍数关系",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":20,"analysis":33},1108477,"流水作业是施工现场控制施工进度的一种经济效益很好的方法，相比之下在施工现场应用最普遍的流水形式是（ ）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"非节奏流水",{"key":24,"text":235,"correct":26},"固定节拍流水",{"key":28,"text":237,"correct":26},"加快成倍节拍流水",{"key":31,"text":239,"correct":26},"一般成倍节拍流水",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":28,"analysis":33},1108478,"某分部工程由4个施工过程 （A、 B、 C、 D）组成，分为6个施工段。流水节拍均为3天，无组织间歇时间和工艺间歇时间，但施工过程D需提前2天插入施工，该分部工程的工期为（ ）天。",[244,245,247,249],{"key":20,"text":132,"correct":26},{"key":24,"text":246,"correct":26},"24",{"key":28,"text":248,"correct":22},"25",{"key":31,"text":136,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},1108479,"某分部工程的4个施工过程（Ⅰ、Ⅱ、Ⅲ、Ⅳ）组成，分为5个施工段。流水节拍均为3天，无组织间歇时间和工艺间歇时间，但施工过程Ⅳ需提前1天插入施工，该分部工程的工期为（ ）天。",[254,255,256,258],{"key":20,"text":32,"correct":26},{"key":24,"text":136,"correct":26},{"key":28,"text":257,"correct":22},"23",{"key":31,"text":138,"correct":26},{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":28,"analysis":33},1108480,"某工程有六个施工段，分为甲、乙、丙、丁四个施工过程。在没有技术间歇和提前插入时间的情况下，组织固定节拍流水施工，若计划工期不超过45天，则各施工过程之间的最大流水步距为（ ）天。",[263,264,265,266],{"key":20,"text":144,"correct":26},{"key":24,"text":159,"correct":26},{"key":28,"text":146,"correct":22},{"key":31,"text":148,"correct":26},{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":31,"analysis":33},1108481,"某分部工程有两个施工过程，各分为4个施工段组织流水施工，流水节拍分别为3、4、3、3和2、5、4、3天，流水步距为（ ）天。",[271,272,273,274],{"key":20,"text":156,"correct":26},{"key":24,"text":144,"correct":26},{"key":28,"text":159,"correct":26},{"key":31,"text":146,"correct":22},{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":28,"analysis":33},1108482,"下列对于累加数列错位相减取大差法的描述中，错误的是（ ）。",[279,281,283,285],{"key":20,"text":280,"correct":26},"对每一个施工过程在各施工段上的流水节拍依次累加",{"key":24,"text":282,"correct":26},"将相邻施工过程流水节拍累加数列中的后者错后一位，相减后求得一个差数列",{"key":28,"text":284,"correct":22},"在差数列中取绝对值最大者，即为这两个相邻施工过程的流水步距",{"key":31,"text":286,"correct":26},"在差数列中取最大值，即为这两个相邻施工过程的流水步距",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":28,"analysis":33},1108483,"建设工程组织非节奏流水施工时，计算流水步距时第一步是（ ）。",[291,293,295,297],{"key":20,"text":292,"correct":26},"取最大值",{"key":24,"text":294,"correct":26},"错位相减",{"key":28,"text":296,"correct":22},"累加数列",{"key":31,"text":298,"correct":26},"求最大公约数",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":28,"analysis":33},1108484,"某基础工程土方开挖总量为2000立方米，该工程拟分4个施工段组织固定节拍流水施工，两台挖掘机的台班定额均为50立方米\u002F台班，其流水节拍应为（ ）天。",[303,305,307,308],{"key":20,"text":304,"correct":26},"20",{"key":24,"text":306,"correct":26},"10",{"key":28,"text":146,"correct":22},{"key":31,"text":159,"correct":26},{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1108485,"组织流水施工时，建造类施工过程是指（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":26},"将建筑材料.各类构配件.成品.制品和设备等运到工地仓库或施工现场使用地点的施工过程",{"key":24,"text":316,"correct":22},"在施工对象的空间上直接进行砌筑.安装与加工，最终形成建筑产品的施工过程",{"key":28,"text":318,"correct":26},"为了提高建筑产品生产的工厂化.机械化程度和生产能力而形成的施工过程",{"key":31,"text":320,"correct":26},"为了满足人民的各种社会需求而形成的施工过程",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},1108486,"建设工程组织流水施工时，用来表达流水施工在空间布置上开展状态的参数有（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":26},"施工过程和流水强度",{"key":24,"text":328,"correct":26},"流水节拍和流水步距",{"key":28,"text":330,"correct":22},"工作面和施工段",{"key":31,"text":332,"correct":26},"成倍节拍和流水节奏",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1108487,"下列计算式中，对流水节拍的计算错误的是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"流水节拍=工程量×计划时间定额\u002F（计划产量定额×人数×工作班次）",{"key":24,"text":340,"correct":26},"流水节拍=工程量×计划时间定额\u002F（人数×工作班次）",{"key":28,"text":342,"correct":26},"流水节拍=施工段需要的劳动量\u002F（人数×工作班次）",{"key":31,"text":63,"correct":26},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1108488,"下列流水施工参数中，属于区别流水施工组织方式的特征参数的是（ ）。",[348,349,350,351],{"key":20,"text":79,"correct":26},{"key":24,"text":75,"correct":22},{"key":28,"text":77,"correct":26},{"key":31,"text":352,"correct":26},"流水工期",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":28,"analysis":33},1108489,"如果根据工期要求采用倒排进度的方法确定流水节拍，则下列描述错误的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":26},"可反算出所需要的工人数或机械台班数",{"key":24,"text":360,"correct":26},"必须检查劳动力供应的可能性",{"key":28,"text":362,"correct":22},"无需考虑工作面是否足够",{"key":31,"text":364,"correct":26},"必须检查材料和施工机械供应的可能性",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},1108490,"在组织流水施工时，运输类与制备类施工过程一般不列入流水施工进度计划中，只有当其（ ）时，才列入施工进度计划之中。",[369,371,373,375],{"key":20,"text":370,"correct":22},"占有施工对象的工作面而影响工期",{"key":24,"text":372,"correct":26},"造价超过一定数额",{"key":28,"text":374,"correct":26},"对工程安全影响较大",{"key":31,"text":376,"correct":26},"需要特殊专业工种",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},1108491,"流水施工中最常见的施工方式是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"非节奏流水施工",{"key":24,"text":384,"correct":26},"有节奏流水施工",{"key":28,"text":386,"correct":26},"等步距异节奏流水施工",{"key":31,"text":388,"correct":26},"异步距异节奏流水施工",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1108492,"异节奏流水施工是指在有节奏流水施工中，各施工过程的（ ）各自相等而不同施工过程之间的（ ）不尽相等的流水施工。",[393,395,397,399],{"key":20,"text":394,"correct":22},"流水节拍.流水节拍",{"key":24,"text":396,"correct":26},"流水强度.流水节拍",{"key":28,"text":398,"correct":26},"流水步距.流水步距",{"key":31,"text":400,"correct":26},"流水节拍.流水步距",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1108493,"在流水施工的垂直图表示法中，纵坐标表示（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":26},"施工过程的名称或编号",{"key":24,"text":408,"correct":22},"施工段的编号",{"key":28,"text":410,"correct":26},"施工进度",{"key":31,"text":412,"correct":26},"流水施工的持续时间",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":28,"analysis":33},1108494,"某分部工程有4个施工过程，分为3个施工段组织流水施工。各施工过程的流水节拍分别为4天、3天、2天；3天、2天、2天；4天、2天、5天和3天、2天、4天，则流水施工工期为（ ）天。",[417,419,420,421],{"key":20,"text":418,"correct":26},"19",{"key":24,"text":132,"correct":26},{"key":28,"text":134,"correct":22},{"key":31,"text":248,"correct":26},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":28,"analysis":33},1108495,"某工程组织非节奏流水施工，两个施工过程在4个施工段上的流水节拍分别为5、8、4、4天和7、2、5、3天，则该工程的流水施工工期是（ ）天。",[426,428,429,430],{"key":20,"text":427,"correct":26},"16",{"key":24,"text":132,"correct":26},{"key":28,"text":248,"correct":22},{"key":31,"text":431,"correct":26},"28",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":31,"analysis":33},1108496,"某分部工程划分为2个施工过程、3个施工段组织流水施工，流水节拍分别为5天、3天、4天和2天、4天、3天，则流水施工工期为（ ）天。",[436,437,438,439],{"key":20,"text":205,"correct":26},{"key":24,"text":21,"correct":26},{"key":28,"text":132,"correct":26},{"key":31,"text":32,"correct":22},{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},1108497,"某工程划分为三个施工过程、4个施工段组织流水施工，流水节拍见下表，则该工程流水施工工期为（ ）天。",[444,445,446,447],{"key":20,"text":134,"correct":26},{"key":24,"text":257,"correct":26},{"key":28,"text":136,"correct":26},{"key":31,"text":138,"correct":22},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},1108498,"某分部工程由4个施工过程组成，分为3个施工段组织流水施工，其流水节拍（天）见下表。则流水施工工期为（ ）天。",[452,453,454,455],{"key":20,"text":304,"correct":26},{"key":24,"text":132,"correct":26},{"key":28,"text":134,"correct":26},{"key":31,"text":257,"correct":22},{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},1108499,"建设工程组织流水施工时，相邻专业工作队之间的流水步距不尽相等，但专业工作队数等于施工过程数的流水施工方式是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":26},"固定节拍流水施工和加快的成倍节拍流水施工",{"key":24,"text":463,"correct":26},"加快的成倍节拍流水施工和非节奏流水施工",{"key":28,"text":465,"correct":26},"固定节拍流水施工和一般的成倍节拍流水施工",{"key":31,"text":467,"correct":22},"一般的成倍节拍流水施工和非节奏流水施工",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1108500,"某工程由4个施工过程组成，分为4个施工段进行流水施工，其流水节拍（天）见下表，则施工过程甲与乙、乙与丙、丙与丁之间的流水步距分别为（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":26},"4天，3天，4天",{"key":24,"text":475,"correct":22},"2天，3天，4天",{"key":28,"text":477,"correct":26},"3天，4天，1天",{"key":31,"text":479,"correct":26},"1天，3天，5天",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1108501,"某工程有3个施工过程，流水步距分别为2、5，其中第一个施工过程持续时间为8天，第二个施工过程持续时间为11天，第三个施工过程持续总时间是9天，第二与第三施工过程有3天的搭接，则流水施工工期为（ ）天。",[484,485,487,489],{"key":20,"text":205,"correct":26},{"key":24,"text":486,"correct":22},"13",{"key":28,"text":488,"correct":26},"18",{"key":31,"text":418,"correct":26},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},1108502,"下列关于非节奏流水施工的特点，说法错误的是（ ）。",[494,496,497,499],{"key":20,"text":495,"correct":26},"相邻施工过程的流水步距不尽相等",{"key":24,"text":168,"correct":26},{"key":28,"text":498,"correct":22},"各施工过程在各施工段的流水节拍全不相等",{"key":31,"text":500,"correct":26},"有的施工段之间可能有空闲时间",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":503,"answer":20,"analysis":33},1108503,[504,505,506,507],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":28,"analysis":33},1108504,"某建设工程划分为3个施工过程，4个施工段组织加快的成倍节拍流水施工，流水节拍分别为6天、3天、9天和12天，则需要专业工作队总数为（ ）。",[512,513,514,515],{"key":20,"text":144,"correct":26},{"key":24,"text":159,"correct":26},{"key":28,"text":306,"correct":22},{"key":31,"text":25,"correct":26},{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},1108505,"某工程有5个施工过程，划分为3个施工段组织固定节拍流水施工，流水节拍为2天，施工过程之间的组织间歇合计为4天。该工程的流水施工工期是（ ）天。",[520,521,522,523],{"key":20,"text":205,"correct":26},{"key":24,"text":488,"correct":22},{"key":28,"text":304,"correct":26},{"key":31,"text":136,"correct":26},{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":28,"analysis":33},1108506,"某五层现浇钢筋混凝土建筑结构的施工，其主体工程由支模板、绑扎钢筋和浇筑混凝土3个施工过程组成，每个施工过程在施工段上的延续时间均为5天，划分为3个施工段，则总工期为（ ）天。",[528,529,531,533],{"key":20,"text":248,"correct":26},{"key":24,"text":530,"correct":26},"40",{"key":28,"text":532,"correct":22},"85",{"key":31,"text":534,"correct":26},"100",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},1108507,"下列对固定节拍的流水施工特点的描述中正确的是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":26},"是一种最普遍的流水施工方式",{"key":24,"text":542,"correct":26},"是一种最常见的流水施工方式",{"key":28,"text":544,"correct":22},"是一种最理想的流水施工方式",{"key":31,"text":546,"correct":26},"是一种最合理的流水施工方式",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1108508,"下列对于固定节拍流水施工描述正确的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"所有施工过程在各个施工段上的流水节拍均相等",{"key":24,"text":554,"correct":26},"相邻施工过程的流水步距不等",{"key":28,"text":556,"correct":26},"专业工作队数大于施工过程数",{"key":31,"text":215,"correct":26},[559,562,565,568,571,574],{"id":15,"name":560,"category":7,"favorite":561},"领导干部任职前廉政法规知识测试题",92,{"id":563,"name":564,"category":7,"favorite":15},595,"建筑结构与设备",{"id":566,"name":567,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":569,"name":570,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":572,"name":573,"category":7,"favorite":8},534,"BIM工程师",{"id":575,"name":573,"category":7,"favorite":8},535]