[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,24,50,2641,[13,34,46,58,70,81,93,105,117,129,141,153,165,177,189,201,212,224,236,248,260,272,284,292,304,314,325,333,341,353,365,376,386,394,406,414,424,436,448,460,472,484,496,508,520,529,541,553,565,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1108403,1,"单选题","监理单位接受建设单位委托对工程项目实施全过程监理时，在设计准备阶段需要（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","向施工单位提供有关工期的信息",false,{"key":24,"text":25,"correct":26},"B","进行环境及施工现场条件的调查和分析",true,{"key":28,"text":29,"correct":22},"C","审查工程项目建设总进度计划",{"key":31,"text":32,"correct":22},"D","进行工程项目工期目标的论证和决策","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1108404,"为确保建设工程进度控制目标的实现，项目监理机构可采取的技术措施是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"建立工程进度信息沟通网络",{"key":24,"text":41,"correct":26},"审查承包商提交的进度计划",{"key":28,"text":43,"correct":22},"及时办理工程进度款支付手续",{"key":31,"text":45,"correct":22},"建立实际进度检查分析制度",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1108405,"建设工程施工阶段进度控制的主要任务是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"调查和分析工程环境及施工现场条件",{"key":24,"text":53,"correct":26},"编制单位工程施工进度计划",{"key":28,"text":55,"correct":22},"进行工期目标和进度控制决策",{"key":31,"text":57,"correct":22},"编制年度竣工投产支付使用费用",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1108406,"在施工阶段，为了确保进度控制目标的实现，监理工程师需要编制（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"工程项目总进度计划",{"key":24,"text":65,"correct":22},"周（旬）施工作业计划",{"key":28,"text":67,"correct":26},"监理进度计划",{"key":31,"text":69,"correct":22},"分部分项工程施工进度计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1108407,"监理单位接受建设单位委托实施工程项目全过程监理时，需要（ ）。",[74,76,78,79],{"key":20,"text":75,"correct":22},"编制设计和施工总进度计划",{"key":24,"text":77,"correct":26},"审查设计单位和施工单位提交的进度计划",{"key":28,"text":53,"correct":22},{"key":31,"text":80,"correct":22},"编制详细的出图计划并控制其执行",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":31,"analysis":33},1108408,"在建设工程进度控制计划体系中，不属于设计单位计划系统的是（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"设计总进度计划",{"key":24,"text":88,"correct":22},"阶段性设计进度计划",{"key":28,"text":90,"correct":22},"设计作业进度计划",{"key":31,"text":92,"correct":26},"年度建设资金计划",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},1108409,"施工图设计工作进度计划主要考虑各（ ）的设计进度及其搭接关系。",[97,99,101,103],{"key":20,"text":98,"correct":26},"单位工程",{"key":24,"text":100,"correct":22},"分部工程",{"key":28,"text":102,"correct":22},"分项工程",{"key":31,"text":104,"correct":22},"单项工程",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},1108410,"影响工程进度的因素中，施工安全措施不当属于（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"业主因素",{"key":24,"text":112,"correct":26},"施工技术因素",{"key":28,"text":114,"correct":22},"组织管理因素",{"key":31,"text":116,"correct":22},"社会环境因素",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":28,"analysis":33},1108411,"在工程建设过程中，属于影响工程进度的组织管理因素是（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"不合理的施工方案",{"key":24,"text":124,"correct":22},"不明的水文气象条件",{"key":28,"text":126,"correct":26},"向有关部门提出各种申请审批手续的延误",{"key":31,"text":128,"correct":22},"设计内容不完善，规范应用不恰当",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},1108412,"影响建设工程进度的不利因素有很多，其中属于自然环境因素的是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"临时停水.停电",{"key":24,"text":136,"correct":26},"地下埋藏文物的保护及处理",{"key":28,"text":138,"correct":22},"不可靠技术的应用",{"key":31,"text":140,"correct":22},"资金不到位",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":28,"analysis":33},1108413,"网络计划的目标由工程项目的目标所决定，其中以限定的工期寻求最低成本或寻求最低成本时的工期安排属于（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"时间目标",{"key":24,"text":148,"correct":22},"时间-资源目标",{"key":28,"text":150,"correct":26},"时间-成本目标",{"key":31,"text":152,"correct":22},"时间-投资目标",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1108414,"与横道图表示的进度计划相比，网络计划的主要特征是能够明确表达（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"单位时间内的资源需求量",{"key":24,"text":160,"correct":26},"各项工作之间的逻辑关系",{"key":28,"text":162,"correct":22},"各项工作的持续时间",{"key":31,"text":164,"correct":22},"各项工作之间的搭接时间",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":28,"analysis":33},1108415,"下列属于采用横道图表示工程进度计划的主要特点的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"能够明确地反映出各项工作之间错综复杂的相互关系",{"key":24,"text":172,"correct":22},"能够明确表达地反映出影响工期的关键工作",{"key":28,"text":174,"correct":26},"易于编制和便于理解",{"key":31,"text":176,"correct":22},"能方便地利用计算机进行计算和优化",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1108416,"施工单位的计划系统中，施工准备的工作内容通常包括（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":26},"技术准备",{"key":24,"text":184,"correct":22},"确定进场人员",{"key":28,"text":186,"correct":22},"确定项目经理",{"key":31,"text":188,"correct":22},"确定供货单位",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1108417,"（ ）是依据工程项目可行性研究报告、工程项目前期工作计划和工程项目建设总进度计划编制的。",[193,195,197,199],{"key":20,"text":194,"correct":22},"监理设计阶段进度计划",{"key":24,"text":196,"correct":26},"监理总进度计划",{"key":28,"text":198,"correct":22},"监理施工阶段进度计划",{"key":31,"text":200,"correct":22},"监理年度进度计划",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},1108418,"根据批准的初步设计安排单位工程的开竣工日期，属于建设工程进度计划体系中（ ）内容。",[205,207,209,210],{"key":20,"text":206,"correct":22},"工程项目前期工作计划",{"key":24,"text":208,"correct":22},"单位工程施工进度计划",{"key":28,"text":63,"correct":26},{"key":31,"text":211,"correct":22},"工程项目年度进度计划",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},1108419,"下列选项中不属于建设项目总进度目标论证的工作步骤中调查研究和收集资料包括的工作是（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":26},"了解和收集设计阶段有关项目进度目标确定的情况和资料",{"key":24,"text":219,"correct":22},"收集与进度有关的该项目组织.管理.经济和技术资料",{"key":28,"text":221,"correct":22},"了解和调查该项目的总体部署",{"key":31,"text":223,"correct":22},"了解和调查该项目实施的主客观条件",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1108420,"项目的工作编码指的是每一个工作项的编码，编码时应考虑的因素不包括（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"计划层",{"key":24,"text":231,"correct":26},"投资规模",{"key":28,"text":233,"correct":22},"计划对象",{"key":31,"text":235,"correct":22},"工作内容",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},1108421,"项目管理的主要任务是在（ ）对项目的目标进行控制。",[240,242,244,246],{"key":20,"text":241,"correct":22},"项目决策阶段",{"key":24,"text":243,"correct":22},"项目设计阶段",{"key":28,"text":245,"correct":26},"项目实施阶段",{"key":31,"text":247,"correct":22},"项目验收阶段",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":31,"analysis":33},1108422,"在进行建设项目总进度目标控制前，建设单位对项目总进度管理的首要任务是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"收集和整理比较详细的设计资料",{"key":24,"text":255,"correct":22},"比较和分析各项技术方案的合理性",{"key":28,"text":257,"correct":22},"提出和改进设计.施工的进度控制措施",{"key":31,"text":259,"correct":26},"分析和论证进度目标实现的可能性",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1108423,"编制工程项目总进度计划是（ ）进度控制的主要任务。",[264,266,268,270],{"key":20,"text":265,"correct":26},"设计准备阶段",{"key":24,"text":267,"correct":22},"设计阶段",{"key":28,"text":269,"correct":22},"施工图设计阶段",{"key":31,"text":271,"correct":22},"施工阶段",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1108424,"采取CM承发包模式，属于控制建设工程进度的（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":26},"合同措施",{"key":24,"text":279,"correct":22},"技术措施",{"key":28,"text":281,"correct":22},"经济措施",{"key":31,"text":283,"correct":22},"组织措施",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1108425,"在工程建设过程中，由于领导不力，指挥失当，使参加工程建设的各个单位配合上发生矛盾影响施工进度，属于（ ）。",[288,289,290,291],{"key":20,"text":110,"correct":22},{"key":24,"text":114,"correct":26},{"key":28,"text":112,"correct":22},{"key":31,"text":116,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":28,"analysis":33},1108426,"下列建设工程进度控制因素中，属于业主因素的是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"地下埋藏文物的保护.处理",{"key":24,"text":299,"correct":22},"合同签订的遗漏条款.表达失当",{"key":28,"text":301,"correct":26},"施工现场不能及时提供",{"key":31,"text":303,"correct":22},"特殊材料及新材料的不合理使用",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1108427,"影响工程进度的因素中，汇率浮动和通货膨胀等属于（ ）。",[308,310,312,313],{"key":20,"text":309,"correct":22},"材料设备因素",{"key":24,"text":311,"correct":26},"资金因素",{"key":28,"text":112,"correct":22},{"key":31,"text":116,"correct":22},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},1108428,"建设工程实施过程中，下列选项中属于影响工程进度的组织管理因素的是（ ）。",[318,319,321,323],{"key":20,"text":138,"correct":22},{"key":24,"text":320,"correct":26},"合同签订时遗漏条款或表达失当",{"key":28,"text":322,"correct":22},"汇率浮动和通货膨胀",{"key":31,"text":324,"correct":22},"施工设备不配套.选型失当",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":28,"analysis":33},1108429,"在建设工程监理工作中，建立工程进度报告制度及进度信息沟通网络属于监理工程师控制进度的（ ）。",[329,330,331,332],{"key":20,"text":281,"correct":22},{"key":24,"text":277,"correct":22},{"key":28,"text":283,"correct":26},{"key":31,"text":279,"correct":22},{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":28,"analysis":33},1108430,"建立进度计划审核制度和进度计划实施中的检查分析制度属于监理工程师实施进度控制的（ ）。",[337,338,339,340],{"key":20,"text":279,"correct":22},{"key":24,"text":277,"correct":22},{"key":28,"text":283,"correct":26},{"key":31,"text":281,"correct":22},{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},1108431,"建设工程进度控制应用PDCA循环系统，对出现的偏差进行分析，直到工程（ ）为止。",[345,347,349,351],{"key":20,"text":346,"correct":22},"竣工验收",{"key":24,"text":348,"correct":26},"竣工验收交付使用",{"key":28,"text":350,"correct":22},"竣工验收合格之日",{"key":31,"text":352,"correct":22},"实际竣工之日",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1108432,"流水步距的数目取决于（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"工作面",{"key":24,"text":360,"correct":26},"参加流水的施工过程数",{"key":28,"text":362,"correct":22},"流水节拍",{"key":31,"text":364,"correct":22},"施工段数",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},1108433,"用来表达流水施工在施工工艺方面进展状态的参数是（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":26},"施工过程",{"key":24,"text":372,"correct":22},"施工段",{"key":28,"text":374,"correct":22},"流水步距",{"key":31,"text":362,"correct":22},{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},1108434,"建设工程组织流水施工时，相邻两个专业工作队相继开始施工的最小间隔时间称为（ ）。",[380,382,383,384],{"key":20,"text":381,"correct":22},"间歇时间",{"key":24,"text":374,"correct":26},{"key":28,"text":362,"correct":22},{"key":31,"text":385,"correct":22},"提前插入时间",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},1108435,"组织建设工程流水施工时，根据施工组织及计划安排需要而将计划任务划分成的子项是（ ）。",[390,391,392,393],{"key":20,"text":370,"correct":26},{"key":24,"text":374,"correct":22},{"key":28,"text":358,"correct":22},{"key":31,"text":372,"correct":22},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1108436,"下列对于流水施工的各表达方式描述错误的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"横道图绘制简单，时间和空间状况形象直观",{"key":24,"text":401,"correct":26},"垂直图中斜向线段表示施工过程或专业工作队的空间位置",{"key":28,"text":403,"correct":22},"横道图的横坐标表示流水施工的持续时间",{"key":31,"text":405,"correct":22},"垂直图编制实际工程进度计划不如横道图方便",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":31,"analysis":33},1108437,"流水施工参数中，流水步距的数目取决于（ ）。",[410,411,412,413],{"key":20,"text":358,"correct":22},{"key":24,"text":364,"correct":22},{"key":28,"text":362,"correct":22},{"key":31,"text":360,"correct":26},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":33},1108438,"在组织建设工程流水施工时，某个专业工作队在一个施工段上的施工时间称为（ ）。",[418,419,421,422],{"key":20,"text":362,"correct":26},{"key":24,"text":420,"correct":22},"流水工期",{"key":28,"text":374,"correct":22},{"key":31,"text":423,"correct":22},"流水强度",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},1108439,"流水施工的表达方式中，横道图表示法的优点是（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":26},"绘图简单",{"key":24,"text":431,"correct":22},"施工过程表达不清楚",{"key":28,"text":433,"correct":22},"时间和空间状况不够形象直观",{"key":31,"text":435,"correct":22},"斜率可以直观表示进度",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},1108440,"下列计算方法中，不能用来计算流水节拍的是（ ）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"倒排进度法",{"key":24,"text":443,"correct":26},"计量计价法",{"key":28,"text":445,"correct":22},"经验估算法",{"key":31,"text":447,"correct":22},"定额计算法",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},1108441,"流水施工空间参数中，工作面的大小表明（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"施工速度的快慢",{"key":24,"text":455,"correct":22},"能划分施工段的多少",{"key":28,"text":457,"correct":22},"能完成工程量的多少",{"key":31,"text":459,"correct":26},"能安排施工人数或机械台数的多少",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},1108442,"下列关于流水施工的特点说法不正确的是（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"尽可能地利用工作面进行施工，工期比较短",{"key":24,"text":467,"correct":26},"不利于提高技术水平和劳动生产率",{"key":28,"text":469,"correct":22},"专业工作队能够连续施工，同时能使相邻专业队的开工时间最大限度地搭接",{"key":31,"text":471,"correct":22},"为施工现场的文明施工和科学管理创造了有利条件",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},1108443,"建设工程采用平行施工组织方式的特点是（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"能够均匀使用施工资源",{"key":24,"text":479,"correct":22},"单位时间内投入的资源量较少",{"key":28,"text":481,"correct":22},"专业工作队能够连续施工",{"key":31,"text":483,"correct":26},"能够充分利用工作面进行施工",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":24,"analysis":33},1108445,"某分部工程有3个施工过程，分为4个施工段组织加快的成倍节拍流水施工，各施工过程流水节拍分别是9天、6天、9天，则该分部工程的流水施工工期是（ ）天。",[488,490,492,494],{"key":20,"text":489,"correct":22},"24",{"key":24,"text":491,"correct":26},"33",{"key":28,"text":493,"correct":22},"36",{"key":31,"text":495,"correct":22},"54",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},1108446,"某基础工程划分4个施工过程（挖基槽、作垫层、混凝土浇筑、回填土）在5个施工段组织固定节拍流水施工，流水节拍为3天，要求混凝土浇筑3天后才能进行回填土，该工程的流水工期为（ ）天。",[500,502,504,506],{"key":20,"text":501,"correct":22},"39",{"key":24,"text":503,"correct":22},"29",{"key":28,"text":505,"correct":26},"27",{"key":31,"text":507,"correct":22},"14",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":33},1108447,"某分部工程有3个施工过程，各分为4个流水节拍相等的施工段，各施工过程的流水节拍分别为6、4、4天。如果组织加快的成倍节拍流水施工，则专业工作队数和流水施工工期分别为（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":22},"3个和20天",{"key":24,"text":515,"correct":22},"4个和25天",{"key":28,"text":517,"correct":22},"5个和24天",{"key":31,"text":519,"correct":26},"7个和20天",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},1108448,"相邻两个施工过程之间由于工艺或组织安排需要而增加的额外等待时间是指（ ）。",[524,526,527,528],{"key":20,"text":525,"correct":22},"时间间隔",{"key":24,"text":381,"correct":26},{"key":28,"text":374,"correct":22},{"key":31,"text":362,"correct":22},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},1108449,"某工程有三个施工过程，划分为5个施工段组织加快的成倍节拍流水施工，各施工过程的流水节拍分别为4天、6天和4天，则参加流水施工的专业工作队总数为（ ）个。",[533,535,537,539],{"key":20,"text":534,"correct":22},"4",{"key":24,"text":536,"correct":22},"5",{"key":28,"text":538,"correct":22},"6",{"key":31,"text":540,"correct":26},"7",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},1108450,"建设工程组织流水施工时，相邻专业工作队之间的流水步距相等，且施工段之间没有空闲时间的是（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"一般的成倍节拍流水施工和非节奏流水施工",{"key":24,"text":548,"correct":22},"非节奏流水施工和加快的成倍节拍流水施工",{"key":28,"text":550,"correct":22},"一般的成倍节拍流水施工和固定节拍流水施工",{"key":31,"text":552,"correct":26},"固定节拍流水施工和加快的成倍节拍流水施工",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},1108451,"某工程有3个施工过程，流水步距分别为2、5，其中第一个施工过程持续时间为8天，第二个施工过程持续时间为11天，第三个施工过程持续总时间是9天，第二与第三施工过程有3天的搭接，则流水施工工期为（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"12",{"key":24,"text":560,"correct":26},"13",{"key":28,"text":562,"correct":22},"18",{"key":31,"text":564,"correct":22},"19",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},1108454,"流水作业是施工现场控制施工进度的一种经济效益很好的方法。相比之下在施工现场应用最普遍的流水形式是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":26},"非节奏流水",{"key":24,"text":572,"correct":22},"固定节拍流水",{"key":28,"text":574,"correct":22},"加快成倍节拍流水",{"key":31,"text":576,"correct":22},"一般成倍节拍流水",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":31,"analysis":33},1108455,"某分部工程有3个施工过程，分为4个施工段组织流水施工。各施工过程的流水节拍分别为3天、5天、4天、3天，3天、4天、4天、2天和4天、3天、3天、4天，则流水施工工期为（ ）天。",[581,583,585,587],{"key":20,"text":582,"correct":22},"20",{"key":24,"text":584,"correct":22},"21",{"key":28,"text":586,"correct":22},"22",{"key":31,"text":588,"correct":26},"23",[590,593,596,599,602,605],{"id":15,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":15},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]