[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,23,50,2641,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,201,213,225,237,249,261,273,285,297,309,321,329,341,351,360,372,384,396,408,420,432,443,455,467,479,491,503,515,527,539,547,559,568,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1108353,1,"单选题","工程施工过程中为缩短工期而采取的措施中，属于组织措施的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","改进施工工艺和施工技术",false,{"key":24,"text":25,"correct":22},"B","实行包干奖励，提高奖金数额",{"key":27,"text":28,"correct":22},"C","采用更先进的施工机械",{"key":30,"text":31,"correct":32},"D","增加劳动力和施工机械的数量",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1108354,"划分进度控制分界点，是将进度计划按照（ ）进行分解的。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目组成",{"key":24,"text":41,"correct":22},"计划期",{"key":27,"text":43,"correct":32},"施工阶段",{"key":30,"text":45,"correct":22},"专业项目",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1108355,"为了有效地控制建设工程施工进度，建立施工进度控制目标体系时应（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"首先确定短期目标，然后再逐步明确总目标",{"key":24,"text":53,"correct":22},"首先按施工阶段确定目标，然后综合考虑确定总目标",{"key":27,"text":55,"correct":22},"将施工进度总目标直接按计划期分解",{"key":30,"text":57,"correct":32},"将施工进度总目标从不同角度层层分解",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1108356,"监理工程师控制物资供应进度的工作内容包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"确定物资供应分包方式",{"key":24,"text":65,"correct":22},"确定物资供应中标单位",{"key":27,"text":67,"correct":22},"办理物资运输有关手续",{"key":30,"text":69,"correct":32},"组织编制物资供应招标文件",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1108357,"（ ）的根本作用是保障建设工程的物资需要，保证建设工程按施工进度计划组织施工。",[74,76,78,80],{"key":20,"text":75,"correct":32},"物资供应计划",{"key":24,"text":77,"correct":22},"物质需求计划",{"key":27,"text":79,"correct":22},"物资储备计划",{"key":30,"text":81,"correct":22},"国外进口物资计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1108358,"物资供应计划是用来指导和组织建设工程物资供应工作的计划，其编制依据主要包括货源资料和（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"物资加工计划.物资订货计划",{"key":24,"text":89,"correct":22},"物资采购计划.物资加工计划",{"key":27,"text":91,"correct":32},"物资需求计划.物资储备计划",{"key":30,"text":93,"correct":22},"物资申请计划.物资采购计划",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1108359,"编制工程项目物资需求计划的关键是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"确定需求品种",{"key":24,"text":101,"correct":22},"确定需求时间",{"key":27,"text":103,"correct":22},"确定需求规格",{"key":30,"text":105,"correct":32},"确定需求量",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1108360,"下列选项中，不属于物资供应计划编制准备阶段的内容的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"调查研究",{"key":24,"text":113,"correct":32},"确定储备",{"key":27,"text":115,"correct":22},"需求预测",{"key":30,"text":117,"correct":22},"购买决策",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1108361,"物资供应进度控制的含义中，（ ）是将建设工程所需物资的供给纳入计划轨道，进行预测、预控，使整个供给有序地进行。",[122,124,126,128],{"key":20,"text":123,"correct":32},"计划",{"key":24,"text":125,"correct":22},"组织",{"key":27,"text":127,"correct":22},"协调",{"key":30,"text":129,"correct":22},"控制",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1108362,"在工程项目开工前，（ ）应审查施工单位报审的施工总进度计划和阶段性施工进度计划。",[134,136,138,140],{"key":20,"text":135,"correct":22},"建设单位",{"key":24,"text":137,"correct":22},"设计单位",{"key":27,"text":139,"correct":32},"监理单位",{"key":30,"text":141,"correct":22},"勘察单位",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1108363,"在施工过程中，遇到气候、水文、地质及周围环境等方面的不利因素，必然会影响到施工进度，属于（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"设计变更的影响",{"key":24,"text":149,"correct":32},"施工条件的影响",{"key":27,"text":151,"correct":22},"各种风险因素的影响",{"key":30,"text":153,"correct":22},"物资供应进度的影响",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},1108364,"监理工程师物资供应计划审核的主要内容包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"审查物资供应情况分析报告",{"key":24,"text":161,"correct":22},"履行物资供应合同中的义务",{"key":27,"text":163,"correct":22},"负责业主方供应物资的订货",{"key":30,"text":165,"correct":32},"物资的库存量安排是否经济.合理",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1108365,"监理单位受业主委托控制物资供应进度的工作内容是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"编制物资供应招标文件",{"key":24,"text":173,"correct":22},"确定物资供应分包方式及分包合同清单",{"key":27,"text":175,"correct":32},"审核物资供应计划",{"key":30,"text":177,"correct":22},"办理物资运输及进出口许可证",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},1108366,"项目监理机构受建设单位委托控制物资供应进度时，其工作内容是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"组织对投标文件的技术评价",{"key":24,"text":185,"correct":22},"签订物资供应合同",{"key":27,"text":187,"correct":22},"确定建设单位推荐的物资供应单位",{"key":30,"text":69,"correct":32},{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1108367,"建设工程物资储备计划的编制依据是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":32},"物资供应方式",{"key":24,"text":196,"correct":22},"物资市场价格",{"key":27,"text":198,"correct":22},"工程承发包模式",{"key":30,"text":200,"correct":22},"生产组织方式",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":30,"analysis":33},1108368,"通常，监理工程师除编制建设单位负责供应的物资计划外，还需对（ ）提交的物资供应计划进行审核。",[205,207,209,211],{"key":20,"text":206,"correct":22},"建设单位.施工单位和专门物资采购供应部门",{"key":24,"text":208,"correct":22},"建设单位和施工单位",{"key":27,"text":210,"correct":22},"建设单位和专门物资采购供应部门",{"key":30,"text":212,"correct":32},"施工单位和专门物资采购供应部门",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},1108369,"当工程延期事件发生后，承包单位应在合同规定的有效期内提交（ ），以便于监理工程师尽早了解所发生的事件。",[217,219,221,223],{"key":20,"text":218,"correct":22},"竣工验收报告",{"key":24,"text":220,"correct":22},"承包单位详情报告",{"key":27,"text":222,"correct":32},"工程延期意向通知",{"key":30,"text":224,"correct":22},"承包单位最终详情报告",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},1108370,"（ ）不仅是监理工程师实施进度控制的依据，同时也是其核对工程进度款的依据。",[229,231,233,235],{"key":20,"text":230,"correct":22},"工程施工进度报审表",{"key":24,"text":232,"correct":22},"工程施工进度报验表",{"key":27,"text":234,"correct":22},"工程施工组织设计",{"key":30,"text":236,"correct":32},"工程施工进度报表资料",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1108371,"施工进度计划经（ ）审核签认，并报建设单位批准方可实施。",[241,243,245,247],{"key":20,"text":242,"correct":22},"业主现场代表",{"key":24,"text":244,"correct":32},"总监理工程师",{"key":27,"text":246,"correct":22},"专业监理工程师",{"key":30,"text":248,"correct":22},"项目经理",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":30,"analysis":33},1108372,"某工作是由三个性质相同的分项工程合并而成的，各分项工程的工程量和时间定额分别是：Q1＝3300m3，Q2＝3400m3，Q3＝2700m3；H1＝0.15工日／m3，H2＝0.20工日／m3，H3＝0.40工日／m3。则该工作的综合时间定额是（ ）工日／m3。",[253,255,257,259],{"key":20,"text":254,"correct":22},"0.29",{"key":24,"text":256,"correct":22},"0.28",{"key":27,"text":258,"correct":22},"0.25",{"key":30,"text":260,"correct":32},"0.24",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1108373,"（ ）是包括一定工作内容的施工过程，它是施工进度计划的基本组成单元。",[265,267,269,271],{"key":20,"text":266,"correct":32},"工作项目",{"key":24,"text":268,"correct":22},"施工工序",{"key":27,"text":270,"correct":22},"分部工程",{"key":30,"text":272,"correct":22},"分项工程",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":30,"analysis":33},1108374,"关于确定各单位工程的开竣工时间和相互搭接关系，下列说法错误的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"施工顺序必须与主要生产系统投入生产的先后次序相吻合",{"key":24,"text":280,"correct":22},"应注意季节对施工顺序的影响",{"key":27,"text":282,"correct":22},"安排一部分附属工程或零星项目作为后备项目",{"key":30,"text":284,"correct":32},"注意主要工种和主要施工机械能间断施工",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1108375,"监理工程师在审查施工进度计划的过程中发现问题，应采取的措施之一是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":32},"向承包单位提出整改通知书",{"key":24,"text":292,"correct":22},"向建设单位提出指令单",{"key":27,"text":294,"correct":22},"向承包单位提出工程暂停令",{"key":30,"text":296,"correct":22},"向建设单位提出建议书",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1108376,"建设工程施工进度控制工作从审核承包单位提交的施工进度计划开始，直至（ ）为止。",[301,303,305,307],{"key":20,"text":302,"correct":22},"工程竣工验收",{"key":24,"text":304,"correct":32},"工程保修期满",{"key":27,"text":306,"correct":22},"工程交付使用",{"key":30,"text":308,"correct":22},"工程款支付时",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1108377,"当工程项目有总承包单位时（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":32},"监理工程师只需对总承包单位提交的施工总进度计划进行审核即可",{"key":24,"text":316,"correct":22},"对于单位工程施工进度计划，监理工程师不仅要负责编制还要负责审核",{"key":27,"text":318,"correct":22},"监理工程师要负责编制单位工程施工进度计划",{"key":30,"text":320,"correct":22},"工程项目由若干个承包单位平行承包时，监理工程师根本无必要编制施工总进度计划",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},1108378,"将工程项目的施工进度控制目标按年度、季度、月（或旬）进行分解，并用实务工程量、货币工作量及形象进度表示，是按（ ）分解。",[325,326,327,328],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":32},{"key":27,"text":43,"correct":22},{"key":30,"text":45,"correct":22},{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":27,"analysis":33},1108379,"在施工进度控制目标体系中，关于建设工程施工进度目标分解图的说法中，不正确的是（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":22},"需要明确项目建成交付使用的日期",{"key":24,"text":336,"correct":22},"需要明确单位工程交工动用的日期",{"key":27,"text":338,"correct":32},"上级目标受下级目标的制约",{"key":30,"text":340,"correct":22},"下级目标保证上级目标",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":27,"analysis":33},1108380,"在建设工程监理工作中，不属于监理工程师控制进度的技术措施（）。 A.审查承包商提交的进度计划 B.编制进度控制工作细则 C.明确进度控制人员及其职责分工 D.结合电子计算机的应用，对建设工程进度实施动态控制",[345,346,347,348,349],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":32},{"key":30,"text":30,"correct":22},{"key":350,"text":350,"correct":22},"E",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":30,"analysis":33},1108381,"下列建设工程进度控制措施中，属于合同措施的是（）。 A.建立进度协调会议制度 B.审查承包商提交的进度计划 C.对应急赶工给予优厚的赶工费 D.加强索赔管理，公正地处理索赔",[355,356,357,358,359],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":32},{"key":350,"text":350,"correct":22},{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1108382,"建设工程进度控制的总目标是（）。",[364,366,368,370],{"key":20,"text":365,"correct":32},"建设工期",{"key":24,"text":367,"correct":22},"合同工期",{"key":27,"text":369,"correct":22},"定额工期",{"key":30,"text":371,"correct":22},"确保提前交付使用",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":30,"analysis":33},1108383,"（）阐明各单位工程的建筑总规模及本年计划完成情况。",[376,378,380,382],{"key":20,"text":377,"correct":22},"年度计划项目表",{"key":24,"text":379,"correct":22},"投资计划年度分配表",{"key":27,"text":381,"correct":22},"工程项目总进度计划",{"key":30,"text":383,"correct":32},"年度竣工投产交付使用计划表",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":20,"analysis":33},1108384,"工程项目建设总进度计划是根据（）对工程项目从开始至竣工投产的全过程的统一部署。",[388,390,392,394],{"key":20,"text":389,"correct":32},"初步设计",{"key":24,"text":391,"correct":22},"项目评估报告",{"key":27,"text":393,"correct":22},"可行性研究报告",{"key":30,"text":395,"correct":22},"施工图预算",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":27,"analysis":33},1108385,"建设工程进度计划的编制一般包含以下四个阶段：①计划准备阶段、②计算时间参数及确定关键线路阶段、③网络计划优化阶段、④绘制网络图阶段，其正确程序应该是（）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"①②③④",{"key":24,"text":403,"correct":22},"①③②④",{"key":27,"text":405,"correct":32},"①④②③",{"key":30,"text":407,"correct":22},"①②④③",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":24,"analysis":33},1108386,"网络计划的目标由工程项目的目标决定，一般不包括（）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"时间目标",{"key":24,"text":415,"correct":32},"时间－质量目标",{"key":27,"text":417,"correct":22},"时间－资源目标",{"key":30,"text":419,"correct":22},"时间－成本目标",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":27,"analysis":33},1108387,"（）是一个由若干个处于不同层次且相互间有关联的网络计划组成的系统。",[424,426,428,430],{"key":20,"text":425,"correct":22},"搭接网络计划",{"key":24,"text":427,"correct":22},"时标网络计划",{"key":27,"text":429,"correct":32},"多级网络计划",{"key":30,"text":431,"correct":22},"横道图计划",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":20,"analysis":33},1108388,"编制工程项目总进度计划是（）进度控制的主要任务。",[436,438,440,442],{"key":20,"text":437,"correct":32},"设计准备阶段",{"key":24,"text":439,"correct":22},"设计阶段",{"key":27,"text":441,"correct":22},"施工图设计阶段",{"key":30,"text":43,"correct":22},{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},1108389,"监理单位接受建设单位委托实施工程项目全过程监理时，需要（）。",[447,449,451,453],{"key":20,"text":448,"correct":22},"编制设计和施工总进度计划",{"key":24,"text":450,"correct":32},"审查设计单位和施工单位提交的进度计划",{"key":27,"text":452,"correct":22},"编制单位工程施工进度计划",{"key":30,"text":454,"correct":22},"编制详细的出图计划并控制其执行",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":30,"analysis":33},1108390,"某建设项目工程总承包方为了协助业主进行项目总进度目标的控制，对项目的总进度目标进行了分析和论证，编制了项目总进度纲要。在总进度目标论证时做了以下工作： ①调查研究； ②编制总进度计划； ③编制各层进度计划； ④项目结构分析； ⑤项目的工作编码； ⑥进度计划系统的结构分析； 则，建设项目工程总承包方进行总进度目标论证时，其工作顺序应为（）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"①一②一③一⑥一④一⑤",{"key":24,"text":462,"correct":22},"①一③一②一⑥一④一⑤",{"key":27,"text":464,"correct":22},"①一③一②一⑤一④一⑥",{"key":30,"text":466,"correct":32},"①一④一⑥一⑤一③一②",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},1108391,"建设工程施工阶段进度控制的主要任务是（）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"调查和分析工程环境及施工现场条件",{"key":24,"text":474,"correct":32},"编制工程年、季、月实施计划",{"key":27,"text":476,"correct":22},"进行工程项目工期目标和进度控制决策",{"key":30,"text":478,"correct":22},"编制年度竣工投产交付使用计划",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1108392,"为使业主方各工作部门和项目各参与方便捷地获取进度信息，可利用（ ）作为基于网络的信息处理平台辅助进度控制。",[483,485,487,489],{"key":20,"text":484,"correct":22},"项目公用网站",{"key":24,"text":486,"correct":32},"项目专用网站",{"key":27,"text":488,"correct":22},"项目门户网站",{"key":30,"text":490,"correct":22},"项目局部网站",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":30,"analysis":33},1108393,"建设工程进度控制计划体系中，监理单位编制监理总进度计划的目的是（ ）。",[495,497,499,501],{"key":20,"text":496,"correct":22},"使工程项目前期决策阶段各项工作的时间得到控制",{"key":24,"text":498,"correct":22},"保证整个建设工程按期交付使用",{"key":27,"text":500,"correct":22},"充分发挥投资效益，降低建设工程成本",{"key":30,"text":502,"correct":32},"对建设工程进度控制总目标进行规划",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},1108394,"建设单位编制的进度计划在建设工程进度控制计划体系中不包括（ ）。",[507,509,511,513],{"key":20,"text":508,"correct":22},"工程项目建设总进度计划",{"key":24,"text":510,"correct":22},"工程项目前期工作计划",{"key":27,"text":512,"correct":32},"施工图进度计划",{"key":30,"text":514,"correct":22},"工程项目年度计划",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},1108395,"工程项目前期工作进度计划表中的建设性质不包括（ ）。",[519,521,523,525],{"key":20,"text":520,"correct":22},"新建",{"key":24,"text":522,"correct":32},"增建",{"key":27,"text":524,"correct":22},"改建",{"key":30,"text":526,"correct":22},"扩建",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":20,"analysis":33},1108396,"施工机械时间定额的倒数是（ ）。",[531,533,535,537],{"key":20,"text":532,"correct":32},"机械台班产量定额",{"key":24,"text":534,"correct":22},"工人班组产量定额",{"key":27,"text":536,"correct":22},"工人班组时间定额",{"key":30,"text":538,"correct":22},"机械台班时间定额",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":27,"analysis":33},1108397,"（ ）是—个由若干个处于不同层次且相互间有关联的网络计划组成的系统。",[543,544,545,546],{"key":20,"text":425,"correct":22},{"key":24,"text":427,"correct":22},{"key":27,"text":429,"correct":32},{"key":30,"text":431,"correct":22},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},1108398,"横道计划作为控制建设工程进度的方法之一，其局限性是不能（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"反映出建设工程实施过程中劳动力的需求量",{"key":24,"text":554,"correct":32},"明确反映出各项工作之间错综复杂的相互关系",{"key":27,"text":556,"correct":22},"反映出建设工程实施过程中材料的需求量",{"key":30,"text":558,"correct":22},"直观地反映出建设工程的施工期限",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1108399,"建设工程进度计划的表示方法中，（ ）虽不能明确地反映出影响工期的关键工作和关键线路，但是由于其形象、直观，且易于编制和理解，被广泛应用。",[563,565,566,567],{"key":20,"text":564,"correct":32},"横道图",{"key":24,"text":427,"correct":22},{"key":27,"text":425,"correct":22},{"key":30,"text":429,"correct":22},{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},1108400,"大型建设项目总进度目标论证的核心工作是通过编制（ ），论证总进度目标实现的可能性。",[572,574,576,578],{"key":20,"text":573,"correct":32},"总进度纲要",{"key":24,"text":575,"correct":22},"施工组织总设计",{"key":27,"text":577,"correct":22},"总进度规划",{"key":30,"text":579,"correct":22},"各子系统进度规划",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},1108401,"整个项目划分成多少计划层，应根据项目的（ ）而定。",[584,586,588,590],{"key":20,"text":585,"correct":32},"规模和特点",{"key":24,"text":587,"correct":22},"质量和投资",{"key":27,"text":589,"correct":22},"质量和进度",{"key":30,"text":591,"correct":22},"进度和特点",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":20,"analysis":33},1108402,"编制进度控制工作细则，指导监理人员实施进度控制，属于监理工程师实施进度控制的（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":32},"技术措施",{"key":24,"text":599,"correct":22},"合同措施",{"key":27,"text":601,"correct":22},"组织措施",{"key":30,"text":603,"correct":22},"经济措施",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]