[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,22,50,2641,[13,34,46,58,69,81,93,100,112,124,136,143,155,164,176,188,200,212,224,236,248,260,272,284,296,308,320,332,344,355,367,379,391,403,415,427,439,450,462,474,486,498,508,520,532,544,556,568,580,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1108300,1,"单选题","关于监理单位设计进度监控内容的说法，正确的是（ ）",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","编制切实可靠的设计总进度计划",false,{"key":24,"text":25,"correct":22},"B","落实设计工作技术经济责任制",{"key":27,"text":28,"correct":22},"C","按照设计技术经济定额进行考核",{"key":30,"text":31,"correct":32},"D","审查设计进度计划的合理性和可行性",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1108301,"在建设工程设计阶段属于监理单位的设计进度控制措施为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"确定设计委托方式及设计合同形式",{"key":24,"text":41,"correct":22},"编制指导性施工总进度计划并控制其实施",{"key":27,"text":43,"correct":32},"落实项目监理机构中专门负责设计进度控制的人员",{"key":30,"text":45,"correct":22},"建立健全设计技术经济定额及设计工作责任制",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1108302,"在工程设计过程中，影响进度的主要因素之一是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"复杂的工程地质条件",{"key":24,"text":53,"correct":22},"设计合同的计价方式",{"key":27,"text":55,"correct":22},"施工承发包模式的选择",{"key":30,"text":57,"correct":32},"设计各专业之间协调配合的影响",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1108303,"在设计过程中，如果业主改变其建设意图和要求，就会引起设计单位的设计变更，这是影响设计进度的（ ）因素。",[62,64,65,67],{"key":20,"text":63,"correct":32},"建设意图和要求改变的影响",{"key":24,"text":57,"correct":22},{"key":27,"text":66,"correct":22},"工程变更的影响",{"key":30,"text":68,"correct":22},"材料代用、设备选用失误的影响",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":30,"analysis":33},1108304,"工程建设设计阶段进度控制的最终目标就是按质、按量、按时间要求提供（ ）文件。",[73,75,77,79],{"key":20,"text":74,"correct":22},"初步设计",{"key":24,"text":76,"correct":22},"技术设计",{"key":27,"text":78,"correct":22},"建筑设计",{"key":30,"text":80,"correct":32},"施工图设计",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},1108305,"（ ）是施工进度控制的前提，也是设备和材料供应进度控制的前提。",[85,87,89,91],{"key":20,"text":86,"correct":22},"勘察进度控制",{"key":24,"text":88,"correct":32},"设计进度控制",{"key":27,"text":90,"correct":22},"施工准备进度控制",{"key":30,"text":92,"correct":22},"监理进度控制",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":95,"answer":27,"analysis":33},1108306,[96,97,98,99],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":32},{"key":30,"text":45,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":24,"analysis":33},1108307,"监理单位受业主的委托进行建设工程设计阶段的监理时，控制设计进度的工作内容有（ ）。",[104,106,108,110],{"key":20,"text":105,"correct":22},"编制设计工作年度计划",{"key":24,"text":107,"correct":32},"核查分析设计图纸进度表",{"key":27,"text":109,"correct":22},"建立工程设计技术经济定额",{"key":30,"text":111,"correct":22},"编制各专业设计出图计划",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":30,"analysis":33},1108308,"工程设计要划分为初步设计和施工图设计两个阶段，特别复杂的工程设计还要增加（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":22},"初步设计审核阶段",{"key":24,"text":119,"correct":22},"施工图设计审核阶段",{"key":27,"text":121,"correct":22},"扩大的初步设计阶段",{"key":30,"text":123,"correct":32},"技术设计阶段",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":20,"analysis":33},1108309,"初步设计应根据建设单位所提供的（ ）进行编制。",[128,130,132,134],{"key":20,"text":129,"correct":32},"设计基础资料",{"key":24,"text":131,"correct":22},"工程设计图",{"key":27,"text":133,"correct":22},"基础设施",{"key":30,"text":135,"correct":22},"设备资源",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":138,"answer":30,"analysis":33},1108310,[139,140,141,142],{"key":20,"text":74,"correct":22},{"key":24,"text":76,"correct":22},{"key":27,"text":78,"correct":22},{"key":30,"text":80,"correct":32},{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":30,"analysis":33},1108311,"下列选项，不属于确定建设工程设计进度控制总目标时的主要依据是（ ）。",[147,149,151,153],{"key":20,"text":148,"correct":22},"设计工期定额",{"key":24,"text":150,"correct":22},"工程项目的技术先进程度",{"key":27,"text":152,"correct":22},"建设工程总进度目标对设计周期的要求",{"key":30,"text":154,"correct":32},"设计费用",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":27,"analysis":33},1108312,"如果在已施工的部分发现一些问题而必须进行工程变更的情况下，也会影响设计工作进度，这是（ ）。",[159,160,161,162],{"key":20,"text":63,"correct":22},{"key":24,"text":57,"correct":22},{"key":27,"text":66,"correct":32},{"key":30,"text":163,"correct":22},"材料代用.设备选用失误的影响",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},1108313,"在工程建设设计进度控制计划体系中，需要考虑设计分析评审的工作时间安排的进度计划是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"各专业详细的出图计划",{"key":24,"text":171,"correct":22},"施工图设计工作进度计划",{"key":27,"text":173,"correct":32},"初步设计工作进度计划",{"key":30,"text":175,"correct":22},"设计作业进度计划",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":27,"analysis":33},1108314,"在确定规划设计条件时其中有一程序是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"由建设单位持建设项目的批文和确定的建设用地通知书，向业主和监理工程师申请确定拟建项目的规则设计条件",{"key":24,"text":183,"correct":22},"由施工单位持建设项目的批文和确定的建设用地通知书，向业主和监理工程师申请确定拟建项目的规划设计条件",{"key":27,"text":185,"correct":32},"由建设单位持建设项目的批文和确定的建设用地通知书，向城市规划管理部门申请确定拟建项目的规划设计条件",{"key":30,"text":187,"correct":22},"由施工单位持建设项目的批文和确定的建设用地通知书，向城市规划管理部门申请确定拟建项目的规划设计条件",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1108315,"设计方案竞赛的主要目的是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"选定设计单位",{"key":24,"text":195,"correct":32},"获得理想的设计方案",{"key":27,"text":197,"correct":22},"降低设计费用",{"key":30,"text":199,"correct":22},"保证工程设计质量",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1108316,"建设工程进度控制的目标是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"设计周期",{"key":24,"text":207,"correct":32},"建设工期",{"key":27,"text":209,"correct":22},"设计工期",{"key":30,"text":211,"correct":22},"工程质量",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":27,"analysis":33},1108317,"在建设工程施工阶段，（ ）是按施工阶段分解建设工程施工进度的总目标。",[216,218,220,222],{"key":20,"text":217,"correct":22},"确定各单位工程的开工及交工动用日期",{"key":24,"text":219,"correct":22},"明确各承包商之间的工作交接条件和时间",{"key":27,"text":221,"correct":32},"明确设备采购及安装等各阶段的起止时间标志",{"key":30,"text":223,"correct":22},"确定年度.季度.月（旬）工程量及形象进度",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1108318,"下列不属于确定建设工程施工进度控制目标的依据的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":32},"监理合同中有关工期的要求",{"key":24,"text":231,"correct":22},"类似工程项目的实际进度",{"key":27,"text":233,"correct":22},"工程难易程度",{"key":30,"text":235,"correct":22},"工程条件的落实情况",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":27,"analysis":33},1108320,"项目监理机构应对承包单位申报的已完分项工程量进行核实，在（ ）后签发工程进度款支付凭证。",[240,242,244,246],{"key":20,"text":241,"correct":22},"与建设单位代表协商",{"key":24,"text":243,"correct":22},"监理员现场计量",{"key":27,"text":245,"correct":32},"质量监理人员检查验收",{"key":30,"text":247,"correct":22},"与承包单位协商",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1108321,"建设工程施工阶段进度控制工作内容不包括（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":32},"审核施工图",{"key":24,"text":255,"correct":22},"签发工程进度款支付凭证",{"key":27,"text":257,"correct":22},"向业主提供进度报告",{"key":30,"text":259,"correct":22},"按年.季.月编制工程综合计划",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1108322,"监理工程师在审查施工进度计划时，发现问题后应采取的措施是（ ），并协助承包单位修改。",[264,266,268,270],{"key":20,"text":265,"correct":32},"向承包单位提出书面修改意见",{"key":24,"text":267,"correct":22},"向建设单位发出工作联系单",{"key":27,"text":269,"correct":22},"向承包单位发出整改联系单",{"key":30,"text":271,"correct":22},"向承包单位发出停工令",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":27,"analysis":33},1108323,"项目监理机构对施工进度计划审核的内容不包括（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"施工总进度计划中项目是否有遗漏",{"key":24,"text":279,"correct":22},"专业分工与计划衔接是否合理",{"key":27,"text":281,"correct":32},"何时下达开工令",{"key":30,"text":283,"correct":22},"施工顺序安排是否符合施工工艺要求",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":27,"analysis":33},1108324,"单位工程施工进度计划编制的依据不包括（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"施工总进度计划",{"key":24,"text":291,"correct":22},"合同工期或定额工期",{"key":27,"text":293,"correct":32},"分部工程施工方案",{"key":30,"text":295,"correct":22},"气象资料",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},1108325,"下列属于编制施工总进度计划的工作内容的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"确定施工场地范围",{"key":24,"text":303,"correct":32},"确定各单位工程的施工期限",{"key":27,"text":305,"correct":22},"计算劳动量和机械台班数",{"key":30,"text":307,"correct":22},"确定各分部分项工程的相互搭接关系",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":27,"analysis":33},1108326,"某项工作是由三个同类性质的分项工程合并而成的，各分项工程的工程量Qi和产量定额Si分别是：Q1=240m3，S1=30m3／工日；Q2=360m3，S2=60m3／工日；Q3=720m3，S3=80m3／工日，其综合时间定额为（ ）工日／m3。",[312,314,316,318],{"key":20,"text":313,"correct":22},"0.013",{"key":24,"text":315,"correct":22},"0.015",{"key":27,"text":317,"correct":32},"0.017",{"key":30,"text":319,"correct":22},"0.020",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},1108327,"当实际进度偏差影响总工期时，通过改变某些工作的逻辑关系来调整进度计划的具体做法是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":32},"将顺序进行的工作改为搭接进行",{"key":24,"text":327,"correct":22},"增加劳动量来缩短某些工作的持续时间",{"key":27,"text":329,"correct":22},"提高某些工作的劳动效率",{"key":30,"text":331,"correct":22},"组织有节奏的流水施工",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":30,"analysis":33},1108328,"采用缩短某些工作持续时间的方法来调整施工进度计划的技术措施是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"实行强有力的调度",{"key":24,"text":339,"correct":22},"改善外部配合条件",{"key":27,"text":341,"correct":22},"增加每天的工作班次",{"key":30,"text":343,"correct":32},"采用更先进的施工机械",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":27,"analysis":33},1108329,"缩短某些工作的持续时间时，属于其他配套措施的是（ ）。",[348,350,352,353],{"key":20,"text":349,"correct":22},"实行包干奖励",{"key":24,"text":351,"correct":22},"增加工作面",{"key":27,"text":339,"correct":32},{"key":30,"text":354,"correct":22},"缩短工艺技术间歇时间",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":27,"analysis":33},1108330,"根据工程延期的审批程序，当延期事件具有持续性、承包单位在合同规定的有效期内不能提交最终详细的申述报告时，应先向监理工程师提交该延期事件的（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"工程延期估计值",{"key":24,"text":362,"correct":22},"延期意向通知",{"key":27,"text":364,"correct":32},"阶段性详情报告",{"key":30,"text":366,"correct":22},"临时延期申请书",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":30,"analysis":33},1108332,"下列选项中，不属于建设工程施工物资储备计划的编制依据的是（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"物资需求计划",{"key":24,"text":374,"correct":22},"物资储备定额",{"key":27,"text":376,"correct":22},"物资储备方式",{"key":30,"text":378,"correct":32},"物资供应市场分布",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},1108333,"关于物资需求计划的说法，正确的是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"编制依据：概算文件.项目总进度计划",{"key":24,"text":386,"correct":32},"组成内容：一次性需求计划和各计划期需求计划",{"key":27,"text":388,"correct":22},"主要内容：确定材料的合理储备",{"key":30,"text":390,"correct":22},"编制单位：各施工承包单位",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},1108334,"建设工程材料的储备量，主要由材料的供应方式和现场条件决定，一般应保持（ ）天的用量。",[395,397,399,401],{"key":20,"text":396,"correct":22},"30",{"key":24,"text":398,"correct":32},"35",{"key":27,"text":400,"correct":22},"40",{"key":30,"text":402,"correct":22},"45",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":30,"analysis":33},1108335,"建设工程物资需求计划的编制依据包括（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"物资运输计划",{"key":24,"text":410,"correct":22},"物资采购计划",{"key":27,"text":412,"correct":22},"物资的储备计划",{"key":30,"text":414,"correct":32},"施工图纸.预算文件.工程合同.项目总进度计划",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},1108337,"CM的基本指导思想是（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":32},"缩短了工程项目的建设工期，使部分工程分批投产，提前获得收益",{"key":24,"text":422,"correct":22},"调节计划进度与实际进度的改变",{"key":27,"text":424,"correct":22},"动态控制设计进度",{"key":30,"text":426,"correct":22},"加强与业主、监理单位、科研单位与承包商的协作与配合",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":20,"analysis":33},1108338,"在单位工程施工进度计划编制过程中，需要在确定工作项目的持续时间之前完成的工作是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":32},"确定施工顺序",{"key":24,"text":434,"correct":22},"落实项目开工日期",{"key":27,"text":436,"correct":22},"绘制施工进度计划图",{"key":30,"text":438,"correct":22},"编制资源供应计划",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},1108339,"某项工作的工程量为320m3，时间定额为0.5工日\u002Fm3，如果每天安排2个工作班次、每班8人去完成该工作，则其持续时间为（ ）天。",[443,445,447,448],{"key":20,"text":444,"correct":32},"10",{"key":24,"text":446,"correct":22},"20",{"key":27,"text":400,"correct":22},{"key":30,"text":449,"correct":22},"80",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1108340,"监理工程师在审批工程延期时遵循的原则中根本原则是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":32},"合同条件",{"key":24,"text":457,"correct":22},"影响工期",{"key":27,"text":459,"correct":22},"实际情况",{"key":30,"text":461,"correct":22},"业主意图",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":33},1108341,"当工程延期事件具有持续性时，根据工程延期的审批程序，监理工程师应在调查核实阶段性报告的基础上完成的工作是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":32},"尽快做出延长工期的临时决定",{"key":24,"text":469,"correct":22},"及时向政府有关部门报告",{"key":27,"text":471,"correct":22},"要求承包单位提出工程延期意向申请",{"key":30,"text":473,"correct":22},"重新审核施工合同条件",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":30,"analysis":33},1108342,"当承包单位未能按合同规定的工期完成合同范围内的工作时对其的处罚是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"拒绝签署工程进度款支付凭证",{"key":24,"text":481,"correct":22},"中止施工承包合同",{"key":27,"text":483,"correct":22},"延长施工进度计划工期",{"key":30,"text":485,"correct":32},"误期损失赔偿",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},1108343,"建设工程施工进度控制工作流程图中，最后一项工作是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":32},"监督工程保修",{"key":24,"text":493,"correct":22},"颁发移交证书",{"key":27,"text":495,"correct":22},"工程竣工验收",{"key":30,"text":497,"correct":22},"采取赶工措施",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},1108344,"建设工程在工程竣工验收之后，紧接着应该进行的流程是（ ）。",[502,503,504,506],{"key":20,"text":491,"correct":22},{"key":24,"text":493,"correct":32},{"key":27,"text":505,"correct":22},"监理工程师审核",{"key":30,"text":507,"correct":22},"监理工程师审批",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":27,"analysis":33},1108345,"下列情况，监理工程师有必要编制进度计划的是（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":22},"单位工程施工的进度计划",{"key":24,"text":515,"correct":22},"大型建设项目的施工总进度计划",{"key":27,"text":517,"correct":32},"分期分批发包又没有负责全部工程的总承包单位的施工总进度计划",{"key":30,"text":519,"correct":22},"大型建设工程的工程项目进度计划",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":20,"analysis":33},1108346,"监理工程师根据承包单位和业主双方关于工程开工的准备情况，选择合适的时机发布工程开工令，并参加由业主主持召开第一次工地会议，会议内容不包括（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":32},"工程师审阅图纸并作出相应决策",{"key":24,"text":527,"correct":22},"业主应当完成法律及财务方面手续",{"key":27,"text":529,"correct":22},"准备开工所需人力.材料及设备",{"key":30,"text":531,"correct":22},"按合同规定为监理工程师提供的各种条件",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":30,"analysis":33},1108347,"监理工程师要随时了解施工进度计划执行过程中所存在的问题，并帮助承包单位予以解决，特别是承包单位无力解决的（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"施工场地问题",{"key":24,"text":539,"correct":22},"工程款支付不及时问题",{"key":27,"text":541,"correct":22},"工程材料质量问题",{"key":30,"text":543,"correct":32},"内外关系协调问题",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":27,"analysis":33},1108348,"下列施工进度控制工作中，属于监理工程师工作的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"编制单位工程施工进度计划",{"key":24,"text":551,"correct":22},"按年.季.月审核施工单位总进度计划",{"key":27,"text":553,"correct":32},"组织现场协调会",{"key":30,"text":555,"correct":22},"审批工程延误事宜",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},1108349,"在建设工程施工阶段，监理工程师控制施工进度的工作内容是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":32},"编制施工进度控制工作细则",{"key":24,"text":563,"correct":22},"编制施工准备工作计划",{"key":27,"text":565,"correct":22},"协助承包单位确定工程延期时间",{"key":30,"text":567,"correct":22},"及时支付工程进度款",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},1108350,"通过检查分析，如果进度偏差比较小，那么（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":32},"仍按原计划执行",{"key":24,"text":575,"correct":22},"对原计划整体进行调整",{"key":27,"text":577,"correct":22},"改变工期或施工速度",{"key":30,"text":579,"correct":22},"应尽量减少变更计划性的调整",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},1108351,"在施工进度计划实施过程中，为缩短工程总工期，可以采用的技术措施有（ ）。",[584,586,587,589],{"key":20,"text":585,"correct":32},"采用更先进的施工方法",{"key":24,"text":339,"correct":22},{"key":27,"text":588,"correct":22},"改善劳动条件",{"key":30,"text":590,"correct":22},"增加每天的施工时间",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":24,"analysis":33},1108352,"通过缩短某些工作的持续时间对施工进度计划进行调整的方法，其主要特点是（ ）。",[595,597,599,601],{"key":20,"text":596,"correct":22},"增加网络计划中的关键线路",{"key":24,"text":598,"correct":32},"不改变工作之间的先后顺序关系",{"key":27,"text":600,"correct":22},"增加工作之间的时间间隔",{"key":30,"text":602,"correct":22},"不改变网络计划中的非关键线路",[604,607,610,613,616,619],{"id":15,"name":605,"category":7,"favorite":606},"领导干部任职前廉政法规知识测试题",92,{"id":608,"name":609,"category":7,"favorite":15},595,"建筑结构与设备",{"id":611,"name":612,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":614,"name":615,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":617,"name":618,"category":7,"favorite":8},534,"BIM工程师",{"id":620,"name":618,"category":7,"favorite":8},535]