[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,21,50,2641,[13,34,46,57,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,284,296,308,320,332,344,354,366,378,388,399,409,418,430,441,450,462,470,482,494,506,518,530,539,551,559,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1108247,1,"单选题","通过缩短某些工作的持续时间调整施工进度计划时，其主要特点是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","在非关键线路上缩短工作持续时间",false,{"key":24,"text":25,"correct":22},"B","采用平行作业方式加快施工进度",{"key":27,"text":28,"correct":29},"C","不改变工作之间的先后顺序关系",true,{"key":31,"text":32,"correct":22},"D","保持网络计划中关键工作不变","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1108249,"下列工作中，属于建设工程进度监测系统过程中工作内容的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"分析进度偏差产生的原因",{"key":24,"text":41,"correct":29},"实际进度数据的加工处理",{"key":27,"text":43,"correct":22},"确定后续工作和总工期的限制条件",{"key":31,"text":45,"correct":22},"分析进度偏差对后续工作的影响",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1108250,"为了全面、准确地掌握进度计划的执行情况，不属于监理工程师要做的三方面工作的是（ ）。",[50,52,54,55],{"key":20,"text":51,"correct":22},"定期收集进度报表资料",{"key":24,"text":53,"correct":22},"现场实地检查工程进展情况",{"key":27,"text":41,"correct":29},{"key":31,"text":56,"correct":22},"定期召开现场会议",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":31,"analysis":33},1108251,"在工程实际的执行过程中往往造成实际进度与计划进度的偏差，则在项目进度计划中应（ ）。",[61,63,65,67],{"key":20,"text":62,"correct":22},"偶有偏差不足为怪",{"key":24,"text":64,"correct":22},"将实际进度调整到计划进度",{"key":27,"text":66,"correct":22},"废除计划进度",{"key":31,"text":68,"correct":29},"采取有效的监测手段不断发现问题，以及应用行之有效的进度调整方法及时解决问题",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":31,"analysis":33},1108252,"已知某网络计划中工作M的自由时差为1天，总时差为4天。通过检查分析，发现该工作的实际进度拖后，且影响总工期2天。在其它工作均正常的前提下，工作M的实际进度拖后（ ）天。",[73,75,77,79],{"key":20,"text":74,"correct":22},"1",{"key":24,"text":76,"correct":22},"4",{"key":27,"text":78,"correct":22},"5",{"key":31,"text":80,"correct":29},"6",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":31,"analysis":33},1108253,"比较实际进度与计划进度，可能的情况不包括（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"如果工作尚有总时差与原有总时差相等，说明该工作实际进度与计划进度一致",{"key":24,"text":88,"correct":22},"如果工作尚有总时差大于原有总时差，说明该工作实际进度超前，超前的时间为二者之差",{"key":27,"text":90,"correct":22},"如果工作尚有总时差小于原有总时差，且仍为非负值，说明该工作实际进度拖后，拖后的时间为二者之差，但不影响总工期",{"key":31,"text":92,"correct":29},"如果工作尚有总时差小于原有总时差，且仍为非负值，说明该工作实际进度拖后，拖后的时间为二者之差，但影响总工期",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},1108254,"某混凝土工程计划累计完成工程量和实际累计完成工程量如下表所示，则第4天下班时刻该工程累计拖欠的工程量为（ ）m3。",[97,99,101,103],{"key":20,"text":98,"correct":29},"10",{"key":24,"text":100,"correct":22},"15",{"key":27,"text":102,"correct":22},"20",{"key":31,"text":104,"correct":22},"25",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},1108255,"在列表比较法中若工作尚有总时差小于原有总时差，且为非负值，其表示的含义为（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"说明工作的实际进度与计划进度一致",{"key":24,"text":112,"correct":29},"说明该工作的实际进度比计划进度拖后，但不影响工期",{"key":27,"text":114,"correct":22},"说明该工作的实际进度比计划进度拖后，且影响工期",{"key":31,"text":116,"correct":22},"说明该工作的实际进度比计划进度超前，但不影响工期",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1108256,"某工程双代号时标网络计划如下图所示，根据第6周末实际进度检查结果绘制的前锋线如点划线所示，通过比较可以看出（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"C工作实际进度拖后2周，影响工期2周",{"key":24,"text":124,"correct":22},"D工作实际进度超前2周，不影响工期",{"key":27,"text":126,"correct":29},"D工作实际进度拖后3周，影响工期2周",{"key":31,"text":128,"correct":22},"E工作实际进度拖后1周，不影响工期",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},1108257,"某分部工程时标网络计划如下图所示。当该计划执行到第5天结束时检查实际进展情况，实际进度前锋线中表述错误的是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"工作C实际进度拖后2天，并影响总工期1天",{"key":24,"text":136,"correct":29},"工作D尚有总时差1天",{"key":27,"text":138,"correct":22},"工作E拖后1天，将影响总工期1天",{"key":31,"text":140,"correct":22},"工作G的最早开始时间将受影响",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1108258,"已知时标网络计划的前锋线进行实际进度与计划进度比较如图所示，则（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"第5天检查时，发现A还没有完成工作",{"key":24,"text":148,"correct":22},"第5天检查时，发现B已完成工作",{"key":27,"text":150,"correct":22},"第5天检查时，发现D已开工1天",{"key":31,"text":152,"correct":29},"第5天检查时，发现C已进行2天",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},1108259,"下列方法中，既能比较工作的实际进度与计划进度，又能分析工作的进度偏差对工程总工期影响程度的是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"匀速进度横道图比较法",{"key":24,"text":160,"correct":22},"S曲线比较法",{"key":27,"text":162,"correct":22},"非匀速进展横道图比较法",{"key":31,"text":164,"correct":29},"前锋线比较法",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":27,"analysis":33},1108260,"某工程时标网络计划及第7周末前锋线如下图所示，关于实际进度与计划进度比较结果正确的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"工作C实际进度拖后2周，影响总工期1周",{"key":24,"text":172,"correct":22},"工作D实际进度提前1周，不影响总工期",{"key":27,"text":174,"correct":29},"工作F实际进度提前1周，不影响总工期",{"key":31,"text":176,"correct":22},"如果按照第7周末结果调整进度计划，工作H可提前开始",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1108261,"香蕉曲线是由两条S曲线组合而成的闭合曲线，这两条曲线为（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":29},"ES曲线和LS曲线",{"key":24,"text":184,"correct":22},"ES曲线和EF曲线",{"key":27,"text":186,"correct":22},"LS曲线和LF曲线",{"key":31,"text":188,"correct":22},"ES曲线和LF曲线",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1108262,"利用香蕉曲线比较法，如果实际进度比按最迟开始时间安排的计划进度拖后，则工程实际进展点应（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"落在ES曲线的左侧",{"key":24,"text":196,"correct":29},"落在LS曲线的右侧",{"key":27,"text":198,"correct":22},"落在ES和LS线之间",{"key":31,"text":200,"correct":22},"落在LS左侧",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1108263,"当某项工作实际进度拖延的时间超过其总时差而需要调整进度计划时，应考虑该工作的（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"资源需求量",{"key":24,"text":208,"correct":29},"后续工作的限制条件",{"key":27,"text":210,"correct":22},"自由时差的大小",{"key":31,"text":212,"correct":22},"紧后工作的数量",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1108264,"网络计划工期优化方法中，通过压缩关键工作的持续时间来达到优化目标的前提是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"计算工期不满足计划工期",{"key":24,"text":220,"correct":29},"不改变各项工作之间的逻辑关系",{"key":27,"text":222,"correct":22},"计划工期不满足计算工期",{"key":31,"text":224,"correct":22},"将关键工作压缩成非关键工作",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1108265,"某工程网络计划中，C工作的总时差为8d，自由时差为5d，在检查实际进度时，发现该工作的持续时间延长了6d，则说明C工作的实际进度将使其紧后工作的最早开始时间推迟（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"6d，同时使总工期延长6d",{"key":24,"text":232,"correct":22},"1d，同时使总工期延长1d",{"key":27,"text":234,"correct":22},"6d，同时使总工期延长1d",{"key":31,"text":236,"correct":29},"1d，但不影响总工期",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},1108266,"在工程网络计划的实施过程中，如果需要确定某项工作进度偏差对紧后工作最早开始时间的影响程度，应根据（ ）的差值进行确定。",[241,243,245,247],{"key":20,"text":242,"correct":29},"自由时差与进度偏差",{"key":24,"text":244,"correct":22},"总时差与进度偏差",{"key":27,"text":246,"correct":22},"自由时差与总时差",{"key":31,"text":248,"correct":22},"时间间隔与进度偏差",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1108267,"在工程网络计划执行过程中，如果某项工作的进度偏差超过其自由时差，则该工作（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"实际进度影响工程总工期",{"key":24,"text":256,"correct":29},"实际进度影响其紧后工作的最早开始时间",{"key":27,"text":258,"correct":22},"由非关键工作转变为关键工作",{"key":31,"text":260,"correct":22},"总时差大于零",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1108268,"分析进度偏差是否超过总时差、自由时差时，下列说法错误的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":29},"工作的进度偏差大于该工作的总时差，则此进度偏差不影响其后续工作和总工期",{"key":24,"text":268,"correct":22},"工作的进度偏差未超过该工作的总时差，则此进度偏差不影响总工期",{"key":27,"text":270,"correct":22},"工作的进度偏差大于该工作的自由时差，则此进度偏差将对其后续工作产生影响",{"key":31,"text":272,"correct":22},"工作的进度偏差未超过该工作的自由时差，则此进度偏差不影响后续工作",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1108269,"下列关于列表比较法的说法中，正确的是（ ）。",[277,278,280,282],{"key":20,"text":86,"correct":29},{"key":24,"text":279,"correct":22},"如果工作尚有总时差大于原有总时差，说明该工作实际进度拖后",{"key":27,"text":281,"correct":22},"如果工作尚有总时差小于原有总时差，且仍为非负值，说明该工作实际进度超前",{"key":31,"text":283,"correct":22},"如果工作尚有总时差小于原有总时差，且为负值，说明该工作实际进度拖后，但不影响总工期",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},1108270,"在列表比较法中，出现（ ）情况时，工作实际进度偏差将影响总工期。",[288,290,292,294],{"key":20,"text":289,"correct":29},"工作尚有总时差小于原有总时差，且为负值",{"key":24,"text":291,"correct":22},"工作尚有总时差小于原有总时差，且为正值",{"key":27,"text":293,"correct":22},"工作尚有自由时差小于原有自由时差，且为负值",{"key":31,"text":295,"correct":22},"工作尚有自由时差小于原有自由时差，且为正值",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":27,"analysis":33},1108271,"采用前锋线控制工程进度，下列说法正确的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"工作实际进展位置落在检查日期左侧，表明该工作进度超前",{"key":24,"text":303,"correct":22},"工作实际进展位置落在检查日期重合，表明该工作进度延后",{"key":27,"text":305,"correct":29},"工作实际进度位置点落后检查日期小于原有总时差，不影响总工期",{"key":31,"text":307,"correct":22},"工作实际进度位置点超前检查日期，则工期将提前",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":27,"analysis":33},1108272,"某工作实施过程中的S曲线如下图所示，图中a和b两点的进度偏差状态是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"a点进度拖后和b点进度拖后",{"key":24,"text":315,"correct":22},"a点进度拖后和b点进度超前",{"key":27,"text":317,"correct":29},"a点进度超前和b点进度拖后",{"key":31,"text":319,"correct":22},"a点进度超前和b点进度超前",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},1108273,"下列对于S曲线比较法的描述中，正确的是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"如果工程实际进展点落在计划S曲线左侧，表明此时实际进度比计划进度拖后",{"key":24,"text":327,"correct":22},"如果工程实际进展点落在S计划曲线右侧，表明此时实际进度比计划进度超前",{"key":27,"text":329,"correct":29},"如果工程实际进展点正好落在计划S曲线上，则表示此时实际进度与计划进度一致",{"key":31,"text":331,"correct":22},"在S曲线比较图中无法直接读出实际进度比计划进度超额或拖欠的任务量",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},1108274,"下列不属于横道图比较法的优点的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"记录和比较简单",{"key":24,"text":339,"correct":22},"形象直观.易于掌握",{"key":27,"text":341,"correct":22},"使用方便",{"key":31,"text":343,"correct":29},"工作之间的逻辑关系表法明确",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1108275,"（ ）是以横坐标表示时间，纵坐标表示累计完成任务量，绘制一条按计划时间累计完成任务量的曲线。",[348,349,351,352],{"key":20,"text":160,"correct":29},{"key":24,"text":350,"correct":22},"香蕉曲线比较法",{"key":27,"text":164,"correct":22},{"key":31,"text":353,"correct":22},"横道图比较法",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},1108276,"某工作的实际进度与计划进度如下图所示，错误的是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"第4周末本工作实际完成的任务量小于计划任务量",{"key":24,"text":361,"correct":22},"本工作未按计划完成",{"key":27,"text":363,"correct":22},"第3周停工半周",{"key":31,"text":365,"correct":29},"第4～5周实际进度为匀速进展",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1108277,"当采用匀速进展横道图比较工作实际进度与计划进度时，如果表示实际进度的横道线右端落在检查日期的左侧，则表明（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"实际进度超前",{"key":24,"text":373,"correct":29},"实际进度拖后",{"key":27,"text":375,"correct":22},"实际进度与计划进度一致",{"key":31,"text":377,"correct":22},"无法说明实际进度与计划进度的关系",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},1108278,"下列选项中，可以确定建设工程实际执行状况与计划目标之间的差距的是（ ）。",[382,384,385,386],{"key":20,"text":383,"correct":22},"进度计划执行中的跟踪检查",{"key":24,"text":56,"correct":22},{"key":27,"text":41,"correct":22},{"key":31,"text":387,"correct":29},"实际进度与计划进度的对比分析",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},1108279,"在建设工程进度调整的系统过程中，当工作实际进度偏差影响到后续工作及总工期而需要采取措施调整进度计划时，首先需要进行的工作是（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":29},"确定可调整进度的范围",{"key":24,"text":395,"correct":22},"进行调整措施的技术经济分析",{"key":27,"text":397,"correct":22},"进行调整方案的比选论证",{"key":31,"text":39,"correct":22},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},1108280,"在建设工程进度计划执行过程中，出现进度偏差后进行进度调整，分析进度偏差对后续工作和总工期的影响的前一个步骤是（ ）。",[403,404,406,407],{"key":20,"text":39,"correct":29},{"key":24,"text":405,"correct":22},"分析进度偏差对后续工作和总工期的影响",{"key":27,"text":43,"correct":22},{"key":31,"text":408,"correct":22},"采取措施调整进度计划",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":20,"analysis":33},1108281,"进度计划实施过程中，一旦发现进度偏差，应采取措施对进度计划进行调整，下列工作中不属于进度调整系统过程的是（ ）。",[413,415,416,417],{"key":20,"text":414,"correct":29},"对实际进度数据进行加工处理",{"key":24,"text":39,"correct":22},{"key":27,"text":408,"correct":22},{"key":31,"text":405,"correct":22},{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1108282,"下列对于进度计划执行中的跟踪检查，表述不正确的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":29},"跟踪检查是计划执行信息的主要工作",{"key":24,"text":425,"correct":22},"跟踪检查是进度分析的依据",{"key":27,"text":427,"correct":22},"跟踪检查是进度调整的依据",{"key":31,"text":429,"correct":22},"跟踪检查是进度控制的关键步骤",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},1108283,"下列工作内容中，属于进度监测系统过程的是（ ）。",[434,435,437,439],{"key":20,"text":39,"correct":22},{"key":24,"text":436,"correct":22},"提出调整进度计划的措施",{"key":27,"text":438,"correct":29},"现场实地检查工程进度情况",{"key":31,"text":440,"correct":22},"分析进度偏差对总工期的影响",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":27,"analysis":33},1108284,"在建设工程进度监测过程中，定期收集进度报表资料情况属于（ ）的主要方式。",[445,446,447,448],{"key":20,"text":387,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":383,"correct":29},{"key":31,"text":449,"correct":22},"实际进度数据的统计分析",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1108285,"跟踪检查的主要工作是定期收集反映工程实际（ ）的有关数据。",[454,456,458,460],{"key":20,"text":455,"correct":22},"质量",{"key":24,"text":457,"correct":29},"进度",{"key":27,"text":459,"correct":22},"成本",{"key":31,"text":461,"correct":22},"安全",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":27,"analysis":33},1108286,"派监理人员常驻现场，随时检查进度计划的实际执行情况，属于（ ）。",[466,467,468,469],{"key":20,"text":383,"correct":22},{"key":24,"text":56,"correct":22},{"key":27,"text":53,"correct":29},{"key":31,"text":387,"correct":22},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1108288,"实施建设工程所需要的设备和材料是根据设计而来的。设计单位必须提出（ ），以便进行加工订货或购买。",[474,476,478,480],{"key":20,"text":475,"correct":22},"采购清单",{"key":24,"text":477,"correct":29},"设备清单",{"key":27,"text":479,"correct":22},"设备资料",{"key":31,"text":481,"correct":22},"采购资料",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1108289,"下列选项中，属于设计阶段进度控制主要任务的是（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":22},"工期控制",{"key":24,"text":489,"correct":29},"出图控制",{"key":27,"text":491,"correct":22},"投资控制",{"key":31,"text":493,"correct":22},"质量控制",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},1108290,"下列关于设计阶段进度控制的意义的说法中，正确的是（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":22},"设计进度控制是建设工程进度控制的前提",{"key":24,"text":501,"correct":22},"设计进度控制是施工进度控制的基础",{"key":27,"text":503,"correct":22},"设计进度控制是设备供应进度控制的重要内容",{"key":31,"text":505,"correct":29},"设计进度控制是材料供应进度控制的前提",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":31,"analysis":33},1108291,"下列选项，不属于确定建设工程设计进度控制总目标时的主要依据的是（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"设计工期定额",{"key":24,"text":513,"correct":22},"工程项目的技术先进程度",{"key":27,"text":515,"correct":22},"建设工程总进度目标对设计周期的要求",{"key":31,"text":517,"correct":29},"设计费用",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1108292,"由（ ）持建设项目的批准文件和确定的建设用地通知书，向城市规划管理部门申请确定拟建项目的规划设计条件。",[522,524,526,528],{"key":20,"text":523,"correct":29},"建设单位",{"key":24,"text":525,"correct":22},"施工单位",{"key":27,"text":527,"correct":22},"监理单位",{"key":31,"text":529,"correct":22},"设计单位",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":27,"analysis":33},1108293,"若发现进度拖后，（ ）应督促设计单位采取有效措施加快进度。",[534,535,536,538],{"key":20,"text":523,"correct":22},{"key":24,"text":525,"correct":22},{"key":27,"text":537,"correct":29},"监理工程师",{"key":31,"text":529,"correct":22},{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":20,"analysis":33},1108294,"在设计过程中，如果业主改变其建设意图和要求，就会引起设计单位的设计变更，这是影响设计进度的（ ）因素。",[543,545,547,549],{"key":20,"text":544,"correct":29},"建设意图和要求改变的影响",{"key":24,"text":546,"correct":22},"设计各专业之间协调配合的影响",{"key":27,"text":548,"correct":22},"工程变更的影响",{"key":31,"text":550,"correct":22},"材料代用.设备选用失误的影响",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":27,"analysis":33},1108296,"（ ）必须采取有效措施，使工程设计与施工能协调地进行。",[555,556,557,558],{"key":20,"text":523,"correct":22},{"key":24,"text":525,"correct":22},{"key":27,"text":537,"correct":29},{"key":31,"text":529,"correct":22},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},1108297,"在设计进度控制中，（ ）要对设计单位填写的设计图纸进度表进行核查分析。",[563,564,565,566],{"key":20,"text":523,"correct":22},{"key":24,"text":525,"correct":22},{"key":27,"text":537,"correct":29},{"key":31,"text":529,"correct":22},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":31,"analysis":33},1108298,"为履行设计合同，按期提交施工图设计文件，设计单位应尽量避免“三边”设计，下列不属于“三边”设计内容的是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"边设计",{"key":24,"text":574,"correct":22},"边准备",{"key":27,"text":576,"correct":22},"边施工",{"key":31,"text":578,"correct":29},"边使用",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":31,"analysis":33},1108299,"下列设计进度控制工作中，属于监理单位进度监控工作的是（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"认真实施设计进度计划",{"key":24,"text":586,"correct":22},"编制切实可行的设计总进度计划",{"key":27,"text":588,"correct":22},"编制阶段性设计进度计划",{"key":31,"text":590,"correct":29},"定期比较分析设计完成情况与计划进度",[592,595,598,601,604,607],{"id":15,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":15},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]