[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,20,50,2641,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,201,212,224,236,248,258,270,282,292,304,312,324,336,348,360,372,384,396,408,420,428,440,452,464,476,488,500,512,524,535,547,559,571,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1108189,1,"单选题","已知年有效利率为12%，每月复利计息。则月名义利率为（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","0.95%",true,{"key":24,"text":25,"correct":26},"B","1.00%",false,{"key":28,"text":29,"correct":26},"C","1.06%",{"key":31,"text":32,"correct":26},"D","2.85%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1108190,"同一笔借款，在利率和计息周期均相同的情况下，用复利计算出的利息金额数和用单利计算出的利息金额数比较（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"前者比后者小",{"key":24,"text":41,"correct":22},"前者比后者大",{"key":28,"text":43,"correct":26},"两者相等",{"key":31,"text":45,"correct":26},"不能确定",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1108191,"某投资方案，建设投资3000万元，流动资金800万元。资本金1500万元，年平均净利润320万元，建设期贷款利息为360万元。该投资方案的资本金净利润率为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"7.69%",{"key":24,"text":53,"correct":26},"10.67%",{"key":28,"text":55,"correct":22},"21.33%",{"key":31,"text":57,"correct":26},"40.00%",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1108192,"在方案评价指标中，对利息备付率进行评价的目的是要对项目的（ ）进行分析。",[62,64,66,68],{"key":20,"text":63,"correct":22},"偿债能力",{"key":24,"text":65,"correct":26},"资本化水平",{"key":28,"text":67,"correct":26},"盈利能力",{"key":31,"text":69,"correct":26},"保障性能",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1108193,"计算某项目内部收益率，已知当折现率为10%时，净现值为600万元；当折现率为14%时，净现值为－400万元，则该项目内部收益率为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"12%",{"key":24,"text":77,"correct":26},"11%",{"key":28,"text":79,"correct":22},"12.4%",{"key":31,"text":81,"correct":26},"13.4%",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1108194,"某项目建设投资为2000万元（不含建设期利息），全部流动资金为400万元。建设投资中借贷资金为800万元，流动资金全部为自有资金。预计项目建成后年平均息税前利润为200万元，年平均贷款利息为15万元，年平均所得税为35万元。则该项目的资本金净利润率为（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"7.71%",{"key":24,"text":89,"correct":26},"8.33%",{"key":28,"text":91,"correct":22},"9.38%",{"key":31,"text":93,"correct":26},"10.31%",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1108195,"方案经济评价指标体系中，属于静态评价指标是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"静态投资回收期",{"key":24,"text":101,"correct":26},"净年值",{"key":28,"text":103,"correct":26},"净现值率",{"key":31,"text":105,"correct":26},"内部收益率",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1108196,"王某每年年末存入银行10000元，如果存款利率为8％，第五年末本利和为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"58666元",{"key":24,"text":113,"correct":26},"61000元",{"key":28,"text":115,"correct":26},"56000元",{"key":31,"text":117,"correct":26},"62000元",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1108197,"某公司向银行借款，贷款年利率为6%。第一年初借款200万元，每年计息一次；第二年末又借款100万元，每半年计息一次，两笔借款均在第3年末还本付息，则复本利和为（ ）万元。",[122,124,126,128],{"key":20,"text":123,"correct":26},"324.54",{"key":24,"text":125,"correct":26},"331.10",{"key":28,"text":127,"correct":26},"331.28",{"key":31,"text":129,"correct":22},"344.29",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1108198,"运用现金流量图可以全面、形象、直观地表示现金流量的三要素，即（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"资金数额.方向.期间",{"key":24,"text":137,"correct":26},"资金数额.流入.时间点",{"key":28,"text":139,"correct":22},"大小.方向.时间点",{"key":31,"text":141,"correct":26},"大小.流出.时间段",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1108199,"下列不属于可行性研究作用的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"投资决策的依据",{"key":24,"text":149,"correct":22},"编制项目建议书的依据",{"key":28,"text":151,"correct":26},"筹措资金的依据",{"key":31,"text":153,"correct":26},"编制初步设计文件的依据",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1108201,"在建设工程进度调整的系统过程中，采取措施调整进度计划时，应当以（ ）为依据。",[158,160,162,164],{"key":20,"text":159,"correct":26},"本工作及后续工作的总时差",{"key":24,"text":161,"correct":26},"本工作及后续工作的自由时差",{"key":28,"text":163,"correct":26},"非关键工作所拥有的机动时间",{"key":31,"text":165,"correct":22},"总工期和后续工作的限制条件",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1108202,"不属于监理工程师全面、准确地掌握进度计划的执行情况，要做的工作的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"定期收集进度报表资料",{"key":24,"text":173,"correct":26},"现场实地检查工程进展情况",{"key":28,"text":175,"correct":22},"实际进度数据的加工处理",{"key":31,"text":177,"correct":26},"定期召开现场会议",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1108204,"下列工作中，属于建设工程进度监测工作的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"确定后续工作及总工期的限制条件",{"key":24,"text":185,"correct":22},"加工处理实际进度数据",{"key":28,"text":187,"correct":26},"分析进度偏差产生的原因",{"key":31,"text":189,"correct":26},"分析进度偏差对总工期的影响",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1108205,"在建设工程进度监测过程中，定期召开现场会议属于（ ）的主要方式。",[194,196,197,199],{"key":20,"text":195,"correct":26},"实际进度与计划进度的对比分析",{"key":24,"text":175,"correct":26},{"key":28,"text":198,"correct":22},"进度计划执行中的跟踪检查",{"key":31,"text":200,"correct":26},"实际进度数据的统计分析",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1108206,"在建设工程进度计划的实施过程中，监理工程师控制进度的关键步骤是（ ）。",[205,207,209,210],{"key":20,"text":206,"correct":26},"加工处理收集到的实际进度数据",{"key":24,"text":208,"correct":26},"调查分析进度偏差产生的原因",{"key":28,"text":195,"correct":26},{"key":31,"text":211,"correct":22},"跟踪检查进度计划的执行情况",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1108207,"当利用S曲线比较实际进度与计划进度时，如果检查日期实际进展点落在计划S曲线的右侧，则该实际进展点与计划S曲线在横坐标方向的距离表示工程项目（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":26},"实际进度超前的时间",{"key":24,"text":219,"correct":22},"实际进度拖后的时间",{"key":28,"text":221,"correct":26},"实际超额完成的任务量",{"key":31,"text":223,"correct":26},"实际拖欠的任务量",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":31,"analysis":33},1108208,"某工作的实际进度与计划进度如下图所示，错误的有（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":26},"第4周末本工作实际完成的任务量小于计划任务量",{"key":24,"text":231,"correct":26},"本工作未按计划完成",{"key":28,"text":233,"correct":26},"第3周停工半周",{"key":31,"text":235,"correct":22},"第4～5周实际进度为匀速进展",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},1108209,"采用非匀速进展横道图比较法比较工作实际进度与计划进度时，涂黑粗线的长度表示该工作的（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":26},"计划完成任务量",{"key":24,"text":243,"correct":26},"实际完成任务量",{"key":28,"text":245,"correct":26},"实际进度偏差",{"key":31,"text":247,"correct":22},"实际投入的时间",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},1108212,"根据双代号时标网络计划的实际进度前锋线，（ ）工作将影响工期。",[252,253,254,256],{"key":20,"text":28,"correct":26},{"key":24,"text":31,"correct":26},{"key":28,"text":255,"correct":22},"E",{"key":31,"text":257,"correct":26},"G",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1108213,"香蕉曲线是由（ ）两条S曲线绘制而成的。",[262,264,266,268],{"key":20,"text":263,"correct":22},"ES与LS",{"key":24,"text":265,"correct":26},"EF与LF",{"key":28,"text":267,"correct":26},"ES与EF",{"key":31,"text":269,"correct":26},"LS与LF",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":28,"analysis":33},1108214,"对某网络计划在某时刻进行检查，发现工作A尚需作业天数为6天，该工作到计划最迟完成时间尚余5天，则该工作（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":26},"可提前1天完成",{"key":24,"text":277,"correct":26},"正常",{"key":28,"text":279,"correct":22},"影响总工期1天",{"key":31,"text":281,"correct":26},"影响总工期3天",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},1108215,"检查某工程的实际进度后，绘制的前锋线如图所示，在原计划工期不变的情况下，H工作尚有总时差（ ）天。",[286,288,290],{"key":20,"text":287,"correct":22},"1",{"key":24,"text":289,"correct":26},"2",{"key":28,"text":291,"correct":26},"3",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1108216,"应用S曲线比较法时，通过比较实际进度S曲线和计划进度S曲线，可以（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":26},"表明实际进度是否匀速开展",{"key":24,"text":299,"correct":22},"得到工程项目实际超额或拖欠的任务量",{"key":28,"text":301,"correct":26},"预测偏差对后续工作及工期的影响",{"key":31,"text":303,"correct":26},"表明对工作总时差的利用情况",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1108217,"在利用S曲线比较建设工程实际进度与计划进度时，如果检查日期实际进展点落在计划S曲线的左侧，则该实际进展点与计划S曲线在纵坐标方向的距离表示该工程（ ）。",[308,309,310,311],{"key":20,"text":217,"correct":26},{"key":24,"text":221,"correct":22},{"key":28,"text":219,"correct":26},{"key":31,"text":223,"correct":26},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},1108218,"某钢筋工程计划用7周完成，每周计划和实际累计完成情况如图所示。关于该工程进度比较结果的说法，正确的是（ ）。",[316,318,320,322],{"key":20,"text":317,"correct":26},"实际开始时间晚于计划开始时间1周",{"key":24,"text":319,"correct":22},"第2周末实际进度比计划进度拖后5%",{"key":28,"text":321,"correct":26},"第4周内计划完成的任务量为28%",{"key":31,"text":323,"correct":26},"第5周内实际任务量比计划任务量拖后6%",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},1108219,"在匀速进展横道图中完成的任务量可用（ ）表示。",[328,330,332,334],{"key":20,"text":329,"correct":22},"实物工程量、劳动消耗量或费用支出",{"key":24,"text":331,"correct":26},"资金消耗量",{"key":28,"text":333,"correct":26},"日完成劳动量",{"key":31,"text":335,"correct":26},"单位时间完成任务量",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1108220,"在建设工程网络计划实施中，某项工作实际进度拖延的时间超过其总时差时，如果不改变工作之间的逻辑关系，则调整进度计划的方法是（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":26},"减小关键线路上该工作后续工作的自由时差",{"key":24,"text":343,"correct":22},"缩短该线路上该工作后续工作的持续时间",{"key":28,"text":345,"correct":26},"对网络计划进行“资源有限、工期最短”的优化",{"key":31,"text":347,"correct":26},"减小关键线路上该工作后续工作的总时差",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},1108225,"在建设工程进度计划的执行过程中，缩短某些工作的持续时间是调整建设工程进度计划的有效方法之一，这些被压缩的工作应该是关键线路和超过计划工期的非关键线路上（ ）的工作。",[352,354,356,358],{"key":20,"text":353,"correct":26},"持续时间较长",{"key":24,"text":355,"correct":22},"直接费用率最小",{"key":28,"text":357,"correct":26},"所需资源有限",{"key":31,"text":359,"correct":26},"自由时差为零",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":28,"analysis":33},1108226,"当某项工作实际进度拖延的时间超过其总时差而需要对进度计划进行调整时，除需考虑总工期的限制条件外，还应考虑网络计划中（ ）的限制条件。",[364,366,368,370],{"key":20,"text":365,"correct":26},"紧后工作",{"key":24,"text":367,"correct":26},"紧前工作",{"key":28,"text":369,"correct":22},"后续工作",{"key":31,"text":371,"correct":26},"关键工作",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},1108227,"在工程网络计划执行过程中，如果需要确定某工作进度偏差对总工期的影响，应根据（ ）的差值确定。",[376,378,380,382],{"key":20,"text":377,"correct":26},"自由时差与总时差",{"key":24,"text":379,"correct":22},"总时差与进度偏差",{"key":28,"text":381,"correct":26},"自由时差与进度偏差",{"key":31,"text":383,"correct":26},"时距与进度偏差",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},1108228,"S曲线比较法的横坐标表示（ ）。",[388,390,392,394],{"key":20,"text":389,"correct":26},"单位时间",{"key":24,"text":391,"correct":22},"时间",{"key":28,"text":393,"correct":26},"累计完成任务量",{"key":31,"text":395,"correct":26},"单位时间完成的任务量",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},1108229,"某土方工程计划累计完成工程量的S曲线如下图所示，1～4天每天实际完成工程量分别为90m3、20m3、80m3、100m3，则第3天下班时该工程累计拖欠的工程量为（ ）m3。",[400,402,404,406],{"key":20,"text":401,"correct":22},"10",{"key":24,"text":403,"correct":26},"20",{"key":28,"text":405,"correct":26},"30",{"key":31,"text":407,"correct":26},"60",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},1108230,"在S曲线比较法中，当实际进展点落在计划S曲线左侧表示（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":26},"计划进度估计错误",{"key":24,"text":415,"correct":26},"实际进度比计划进度落后",{"key":28,"text":417,"correct":26},"实际进度与计划进度相同",{"key":31,"text":419,"correct":22},"实际进度比计划进度超前",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":31,"analysis":33},1108231,"当利用S曲线比较工程项目的实际进度与计划进度时，如果检查日期实际进展点落在计划S曲线的左侧，则该实际进展点与计划S曲线在水平方向的距离表示工程项目（ ）。",[424,425,426,427],{"key":20,"text":221,"correct":26},{"key":24,"text":223,"correct":26},{"key":28,"text":219,"correct":26},{"key":31,"text":217,"correct":22},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},1108232,"分析进度偏差对后续工作及总工期的影响时，应首先分析（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"出现进度偏差的工作是否为关键工作",{"key":24,"text":435,"correct":26},"进度偏差是否超过总时差",{"key":28,"text":437,"correct":26},"进度偏差是否超过自由时差",{"key":31,"text":439,"correct":26},"进度偏差的时距是否超过总时差",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},1108233,"某工程进度计划执行过程中，发现某工作出现进度偏差，但该偏差未影响总工期，则说明该项工作的进度偏差（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":26},"大于该工作的总时差",{"key":24,"text":447,"correct":22},"小于该工作的总时差",{"key":28,"text":449,"correct":26},"大于该工作的自由时差",{"key":31,"text":451,"correct":26},"小于该工作的自由时差",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1108234,"关于网络计划中工作实际进度偏差对后续工作及总工期影响的说法，正确的是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"实际进度偏差大于总时差时，必然影响后续工作和总工期",{"key":24,"text":459,"correct":26},"实际进度偏差小于总时差而大于自由时差时，必然影响后续工作和总工期",{"key":28,"text":461,"correct":26},"实际进度偏差小于总时差和自由时差时，只影响总工期",{"key":31,"text":463,"correct":26},"实际进度偏差大于总时差时，只影响后续工作",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},1108235,"在某工程网络计划中，已知工作M的总时差和自由时差分别为5天和2天，监理工程师检查时发现该工作的实际进度拖后3天，则工作M的实际进度（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":26},"既不影响总工期，也不影响其后续工作的正常进行",{"key":24,"text":471,"correct":22},"不影响总工期，但会将其紧后工作的开始时间推迟1天",{"key":28,"text":473,"correct":26},"会将其紧后工作的开始时间推迟2天，并使总工期延长2天",{"key":31,"text":475,"correct":26},"会将其紧后工作的开始时间推迟4天，并使总工期延长2天",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},1108236,"常用的进度比较方法中，可以形象、直观地反映实际进度与计划进度的比较情况的是（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"横道图比较法",{"key":24,"text":483,"correct":26},"S曲线比较法",{"key":28,"text":485,"correct":26},"香蕉曲线比较法",{"key":31,"text":487,"correct":26},"前锋线比较法",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1108237,"某混凝土工程计划进度与实际进度速度如下图所示，以总量的百分比计，该图表明本工程（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":26},"第1周内实际进度超前5%",{"key":24,"text":495,"correct":22},"第3周内实际进度超前2%",{"key":28,"text":497,"correct":26},"第4周内实际进度拖后1%",{"key":31,"text":499,"correct":26},"第5周内实际进度拖后2%",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},1108238,"某工作的计划进度与实际进度情况如下图所示，下面选项中表述正确的是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"第3月内的实际进度滞后",{"key":24,"text":507,"correct":26},"3月底检查时，进度正常",{"key":28,"text":509,"correct":26},"第1月内的实际进度正常",{"key":31,"text":511,"correct":22},"1月底时，进度滞后",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1108239,"某混凝土工程按计划12天完成，下图中标出了截止至第7天末的实际施工时间，从图中可以看出（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":26},"该工作实际开始时间比计划开始时间晚2天",{"key":24,"text":519,"correct":26},"第5天末实际进度比计划进度拖后3%",{"key":28,"text":521,"correct":26},"第4天内计划完成的任务量为11%",{"key":31,"text":523,"correct":22},"第7天末实际进度比计划进度拖后5%",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":28,"analysis":33},1108240,"某钢筋工程计划用7周完成，每周计划和实际累计完成任务量如下图所示。关于该工程进度比较结果的说法，正确的是（ ）。",[528,529,531,533],{"key":20,"text":317,"correct":26},{"key":24,"text":530,"correct":26},"第2周末实际进度比计划进度提前5%",{"key":28,"text":532,"correct":22},"第4周实际进度比计划进度拖后10%",{"key":31,"text":534,"correct":26},"第5周起中断2周",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1108241,"某工作的实际进度与计划进度如下图所示，下列描述正确的是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"第2周末本工作实际完成的任务量小于计划任务量",{"key":24,"text":542,"correct":26},"第1周内实际进度提前2%",{"key":28,"text":544,"correct":26},"第4周内实际进度拖后5%",{"key":31,"text":546,"correct":26},"第3周末实际进度拖后2%",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1108242,"当采用匀速进展横道图比较法比较工作实际进度与计划进度时，如果表示工作实际进度的横道线右端点落在检查日期的右侧，则检查日期与该横道线右端点的差距表示（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"进度超前的时间",{"key":24,"text":554,"correct":26},"超额完成的任务量",{"key":28,"text":556,"correct":26},"进度拖后的时间",{"key":31,"text":558,"correct":26},"尚待完成的任务量",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},1108243,"采取进度调整措施，应以（ ）的限制条件为依据，确保要求的进度目标得到实现。",[563,565,567,569],{"key":20,"text":564,"correct":26},"紧前工作和总工期",{"key":24,"text":566,"correct":26},"平行工作和总工期",{"key":28,"text":568,"correct":22},"后续工作和总工期",{"key":31,"text":570,"correct":26},"紧前工作和后续工作",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1108244,"下列工作中，属于建设工程进度调整过程中实施内容的是（ ）。",[575,577,578,579],{"key":20,"text":576,"correct":22},"确定后续工作和总工期的限制条件",{"key":24,"text":185,"correct":26},{"key":28,"text":173,"correct":26},{"key":31,"text":177,"correct":26},{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},1108245,"在建设工程进度计划执行过程中，当出现的进度偏差影响到后续工作或总工期而需要采取进度调整措施时，应当首先（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"确定可调整进度的范围",{"key":24,"text":587,"correct":26},"确定可利用的资源数量",{"key":28,"text":589,"correct":26},"分析所采取措施的成本",{"key":31,"text":591,"correct":26},"分析比较各种措施的优劣",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":31,"analysis":33},1108246,"调整建设工程进度计划时，下列（ ）不能改变某些工作之间的逻辑关系。",[596,598,600,602],{"key":20,"text":597,"correct":26},"组织平行作业",{"key":24,"text":599,"correct":26},"组织搭接作业",{"key":28,"text":601,"correct":26},"组织流水作业",{"key":31,"text":603,"correct":22},"加大资源投入",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]