[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,15,50,2641,[13,34,46,58,70,79,91,103,115,127,136,148,160,168,180,192,201,213,225,237,249,261,273,285,295,305,317,329,340,352,364,376,388,400,412,424,436,448,460,472,484,496,508,520,532,544,556,568,580,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1107922,1,"单选题","许多国外专家指出，中国工程技术人员的技术水平、工作能力、知识面等很完善，但缺乏（ ）观念。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","组织",false,{"key":24,"text":25,"correct":26},"B","经济",true,{"key":28,"text":29,"correct":22},"C","合同",{"key":31,"text":32,"correct":22},"D","技术","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1107923,"下列施工阶段投资控制措施中，属于项目监理机构采取的组织措施的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"对工程项目造价目标进行风险分析，并制定防范性对策",{"key":24,"text":41,"correct":26},"编制详细的工作流程图",{"key":28,"text":43,"correct":22},"对设计变更进行技术经济比较",{"key":31,"text":45,"correct":22},"经常或定期向建设单位提交项目投资控制及其存在问题的报告",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1107924,"下列项目监理机构施工阶段投资控制的措施中，属于技术措施的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"继续寻找通过设计挖潜节约投资的可能性",{"key":24,"text":53,"correct":22},"复核工程付款账单，签发付款证书",{"key":28,"text":55,"correct":22},"对工程施工过程中的投资支出做好分析与预测",{"key":31,"text":57,"correct":22},"在项目监理机构中落实从投资控制角度进行施工跟踪的人员.任务分工和职能分工",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1107925,"建设工程设计方案选择和进行初步设计应依据（ ）设置投资控制目标。",[62,64,66,68],{"key":20,"text":63,"correct":26},"投资估算",{"key":24,"text":65,"correct":22},"设计概算",{"key":28,"text":67,"correct":22},"施工图预算",{"key":31,"text":69,"correct":22},"建安工程承包合同价",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1107926,"（ ）是建设工程设计方案选择和进行初步设计的投资控制目标。",[74,75,76,77],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":22},{"key":31,"text":78,"correct":22},"竣工决算",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":28,"analysis":33},1107927,"下列工作内容不属于相关服务阶段投资控制的是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"工程勘察阶段投资控制",{"key":24,"text":86,"correct":22},"工程设计阶段投资控制",{"key":28,"text":88,"correct":26},"施工阶段投资控制",{"key":31,"text":90,"correct":22},"工程保修阶段投资控制",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":28,"analysis":33},1107928,"工程款支付证书由（ ）签发。",[95,97,99,101],{"key":20,"text":96,"correct":22},"专业监理工程师",{"key":24,"text":98,"correct":22},"建设单位",{"key":28,"text":100,"correct":26},"总监理工程师",{"key":31,"text":102,"correct":22},"项目审计部门",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":31,"analysis":33},1107929,"下列属于我国项目监理机构在施工阶段投资控制主要工作的是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":22},"协助建设单位编制工程勘察设计任务书和选择工程勘察设计单位，并应协助签订工程勘察设计合同",{"key":24,"text":110,"correct":22},"审查设计单位提交的设计成果，并应提出评估报告",{"key":28,"text":112,"correct":22},"审核勘察单位提交的勘察费用支付申请表，以及签发勘察费用支付证书",{"key":31,"text":114,"correct":26},"进行工程计量和付款签证",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":28,"analysis":33},1107930,"下列属于我国项目监理机构在施工阶段投资控制的主要工作的是（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"分析可能发生索赔的原因，制定防范对策",{"key":24,"text":122,"correct":22},"对拟建项目进行财务评价",{"key":28,"text":124,"correct":26},"对已完工程量进行偏差分析",{"key":31,"text":126,"correct":22},"审查设计单位提交的设计成果",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":28,"analysis":33},1107931,"进行技术设计和施工图设计的投资控制目标是（ ）。",[131,132,134,135],{"key":20,"text":67,"correct":22},{"key":24,"text":133,"correct":22},"修正总概算",{"key":28,"text":65,"correct":26},{"key":31,"text":63,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":20,"analysis":33},1107933,"下列有关投资控制的经济措施，表述正确的是（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":26},"技术与经济相结合是控制投资最有效的手段",{"key":24,"text":143,"correct":22},"监理员审查承包人提交的工程结算款支付申请",{"key":28,"text":145,"correct":22},"力求在经济合理基础上的技术合理",{"key":31,"text":147,"correct":22},"对承包人超出设计图纸要求增加的工程量应予计量",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":28,"analysis":33},1107934,"项目监理机构在施工阶段进行投资控制，其中复核工程付款账单，签发付款证书是（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"组织措施",{"key":24,"text":155,"correct":22},"技术措施",{"key":28,"text":157,"correct":26},"经济措施",{"key":31,"text":159,"correct":22},"合同措施",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":31,"analysis":33},1107935,"项目监理机构在施工阶段进行投资控制，其中做好工程施工记录，积累素材，参与处理索赔事宜是（ ）。",[164,165,166,167],{"key":20,"text":153,"correct":22},{"key":24,"text":157,"correct":22},{"key":28,"text":155,"correct":22},{"key":31,"text":159,"correct":26},{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":28,"analysis":33},1107936,"某项目的建筑安装工程投资为1000万元，基本预备费为100万元，设备购置费为300万元，物价上涨费预备费为20万元，贷款利息为50万元，则上述投资中属于静态投资的因素总和为（ ）万元。",[172,174,176,178],{"key":20,"text":173,"correct":22},"1050",{"key":24,"text":175,"correct":22},"1450",{"key":28,"text":177,"correct":26},"1400",{"key":31,"text":179,"correct":22},"1380",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":31,"analysis":33},1107937,"在初步设计阶段，影响项目投资的可能性是（ ）。",[184,186,188,190],{"key":20,"text":185,"correct":22},"0%～95%",{"key":24,"text":187,"correct":22},"5%～35%",{"key":28,"text":189,"correct":22},"50%～75%",{"key":31,"text":191,"correct":26},"75%～95%",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":20,"analysis":33},1107938,"在技术设计阶段，影响项目投资的可能性是（ ）。",[196,198,199,200],{"key":20,"text":197,"correct":26},"35%～75%",{"key":24,"text":187,"correct":22},{"key":28,"text":189,"correct":22},{"key":31,"text":191,"correct":22},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1107939,"国外的项目管理咨询公司中，工程师的根本任务是进行建设工程的（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"进度控制",{"key":24,"text":208,"correct":22},"质量控制",{"key":28,"text":210,"correct":22},"投资控制",{"key":31,"text":212,"correct":26},"项目管理",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1107940,"咨询工程师的根本任务是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":26},"进行项目管理，在业主所要求的进度.质量和投资的限制之内完成项目",{"key":24,"text":220,"correct":22},"进行项目规划，在业主所要求的进度.质量和投资的限制之内完成项目",{"key":28,"text":222,"correct":22},"进行项目设计，在业主所要求的进度.质量和投资的限制之内完成项目",{"key":31,"text":224,"correct":22},"进行项目招标，在业主所要求的进度.质量和投资的限制之内完成项目",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1107941,"在国外项目总建设成本的构成中，从估算日期到工程结束时发生的材料和设备价格上涨，应当列入（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"项目间接建设成本",{"key":24,"text":232,"correct":22},"未明确项目准备金",{"key":28,"text":234,"correct":22},"不可预见准备金",{"key":31,"text":236,"correct":26},"建设成本上升费",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},1107942,"下列世界银行和国际咨询工程师联合会建设工程投资构成中不属于项目间接建设成本的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"开工试车费",{"key":24,"text":244,"correct":22},"差旅费",{"key":28,"text":246,"correct":22},"地方关税",{"key":31,"text":248,"correct":26},"建筑保险",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},1107943,"根据《建筑安装工程费用组成》的规定，可以利用综合单价法计算的措施项目费，包括（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"安全文明施工费",{"key":24,"text":256,"correct":22},"夜间施工增加费",{"key":28,"text":258,"correct":22},"已完工程及设备保护费",{"key":31,"text":260,"correct":26},"脚手架工程费",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},1107944,"某施工企业投标报价时确定企业管理费率以人工费为基础计算，据统计资料，该施工企业生产工人年平均管理费为1.2万元，年有效施工天数为240天，人工单价为300元\u002F天，人工费占分部分项工程费的比例为75%，则该企业的企业管理费费率应为（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"12.15%",{"key":24,"text":268,"correct":22},"12.50%",{"key":28,"text":270,"correct":26},"16.67%",{"key":31,"text":272,"correct":22},"22.22%",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1107945,"根据《建筑安装工程费用项目组成》（建标［2013］44号）的规定，未达到固定资产标准的测绘、消防用具的购置、维修费用，应列入（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"仪器仪表使用费",{"key":24,"text":280,"correct":22},"材料费",{"key":28,"text":282,"correct":22},"固定资产使用费",{"key":31,"text":284,"correct":26},"工具用具使用费",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1107946,"根据《建筑安装工程费用项目组成》（建标2013-44号），工程施工中所使用的仪器仪表维修费应计入（ ）。",[289,291,292,293],{"key":20,"text":290,"correct":26},"施工机具使用费",{"key":24,"text":284,"correct":22},{"key":28,"text":282,"correct":22},{"key":31,"text":294,"correct":22},"企业管理费",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":28,"analysis":33},1107947,"下列措施项目中，不作为竞争性费用的是（ ）。",[299,300,302,303],{"key":20,"text":256,"correct":22},{"key":24,"text":301,"correct":22},"冬雨期施工增加费",{"key":28,"text":254,"correct":26},{"key":31,"text":304,"correct":22},"二次搬运费",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":28,"analysis":33},1107948,"某施工现场设立的安全警示标志、现场围挡等所需的费用，应计入（ ）费用。",[309,311,313,315],{"key":20,"text":310,"correct":22},"分部分项工程",{"key":24,"text":312,"correct":22},"规费项目",{"key":28,"text":314,"correct":26},"措施项目",{"key":31,"text":316,"correct":22},"其他项目",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":28,"analysis":33},1107950,"某施工企业承建某县城一住宅楼工程，工程税前造价为8000万元，其中包含材料费进项税额600万，当采用一般计税方法时，该住宅楼建筑安装工程造价内的增值税额为（ ）万元。",[321,323,325,327],{"key":20,"text":322,"correct":22},"222.00",{"key":24,"text":324,"correct":22},"240.00",{"key":28,"text":326,"correct":26},"666.00",{"key":31,"text":328,"correct":22},"720.00",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},1107951,"某施工企业承建某县城一住宅楼工程，工程税前造价为8000万元，其中包含800万进项税额，当采用简易计税方法时，该住宅楼建筑安装工程造价内的增值税额为（ ）万元。",[333,335,337,339],{"key":20,"text":334,"correct":22},"800.00",{"key":24,"text":336,"correct":22},"68.20",{"key":28,"text":338,"correct":22},"216.00",{"key":31,"text":324,"correct":26},{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":28,"analysis":33},1107953,"在施工过程中，施工企业完成建设单位提出的施工图纸以外的零星项目或工作所需的费用，属于（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"措施项目费",{"key":24,"text":347,"correct":22},"总承包服务费",{"key":28,"text":349,"correct":26},"计日工",{"key":31,"text":351,"correct":22},"暂列金额",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":28,"analysis":33},1107954,"根据现行规定，计算建筑安装工程费用的增值税时，其税前工程造价是指（ ）之和。",[356,358,360,362],{"key":20,"text":357,"correct":22},"人工费、材料费、施工机具使用费",{"key":24,"text":359,"correct":22},"人工费、材料费、施工机具使用费、企业管理费、利润",{"key":28,"text":361,"correct":26},"人工费、材料费、施工机具使用费、企业管理费、利润、规费",{"key":31,"text":363,"correct":22},"人工费、材料费、施工机具使用费、企业管理费、利润、规费、措施项目费",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":28,"analysis":33},1107955,"根据建筑安装工程费用的计算方法，材料费中的采购保管费的计算基数是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"材料原价",{"key":24,"text":371,"correct":22},"材料原价＋运杂费",{"key":28,"text":373,"correct":26},"材料原价＋运杂费＋运输损耗",{"key":31,"text":375,"correct":22},"材料原价＋运杂费＋运输损耗＋检验试验费",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},1107956,"建筑安装工程费中工伤保险费的计算基础是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"定额直接费",{"key":24,"text":383,"correct":26},"定额人工费",{"key":28,"text":385,"correct":22},"定额人工费和机械费",{"key":31,"text":387,"correct":22},"定额人工费和材料费",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1107957,"某机械设备预算价格为500万元，残值率为5%，折旧年限为10年，年平均工作台班为250台班。采用平均折旧法计算，其台班折旧费为（ ）元。",[392,394,396,398],{"key":20,"text":393,"correct":22},"1363.6",{"key":24,"text":395,"correct":26},"1900",{"key":28,"text":397,"correct":22},"19090.9",{"key":31,"text":399,"correct":22},"19636.4",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":28,"analysis":33},1107958,"某施工企业购置的施工机械台班，其预算价格为50万元，折旧年限15年，耐用总台班数为150个台班，残值率为5%，考虑购置机械的资金在施工生产过程中随着时间的推移而产生的单位增值，时间价值系数为1.6。则该机械台班折旧费为（ ）万元。",[404,406,408,410],{"key":20,"text":405,"correct":22},"0.02",{"key":24,"text":407,"correct":22},"0.32",{"key":28,"text":409,"correct":26},"0.51",{"key":31,"text":411,"correct":22},"0.54",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":28,"analysis":33},1107959,"某市属建筑公司收到某县城工程一笔税前1000万元的工程款，当采用一般计税方法时，该工程造价为（ ）万元。",[416,418,420,422],{"key":20,"text":417,"correct":22},"90",{"key":24,"text":419,"correct":22},"110",{"key":28,"text":421,"correct":26},"1090",{"key":31,"text":423,"correct":22},"1110",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},1107960,"某施工项目，水泥消耗量为300t，原价为300元\u002Ft，运杂费为30元\u002Ft，在运输过程中，损耗率为3%，运输至施工现场的保管费率为5%，所需的水泥费用合计为（ ）万元。",[428,430,432,434],{"key":20,"text":429,"correct":22},"12.3",{"key":24,"text":431,"correct":26},"10.71",{"key":28,"text":433,"correct":22},"9.73",{"key":31,"text":435,"correct":22},"10.63",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1107961,"在设备工器具费及设备购置费中，国产标准设备原价一般按（ ）计算。",[440,442,444,446],{"key":20,"text":441,"correct":26},"带有备件出厂价",{"key":24,"text":443,"correct":22},"定额估价",{"key":28,"text":445,"correct":22},"系列设备插入估价",{"key":31,"text":447,"correct":22},"不带备件出厂价",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},1107962,"某进口设备离岸价为280万元，国际运费率为10%，海上保险费率为0.5%，关税税率为20%，则该设备的关税完税价格为（ ）万元。",[452,454,456,458],{"key":20,"text":453,"correct":22},"309.40",{"key":24,"text":455,"correct":26},"309.55",{"key":28,"text":457,"correct":22},"336.67",{"key":31,"text":459,"correct":22},"337.35",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":28,"analysis":33},1107963,"某进口设备装运港船上交货价为200万美元，国外运费为10万美元，国外运输保险费为6.5万美元，外贸手续费率为1.5%。若美元兑人民币的汇率为6.2，则该进口设备的到岸价为（ ）万元人民币。",[464,466,468,470],{"key":20,"text":465,"correct":22},"1230.00",{"key":24,"text":467,"correct":22},"1310.87",{"key":28,"text":469,"correct":26},"1342.30",{"key":31,"text":471,"correct":22},"1351.47",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},1107965,"某进口设备，按人民币计算的离岸价为200万元，国外运费9万元，国外运输保险费0.8万元，进口关税率15%，增值税率16%，不征收消费税，则该进口设备应纳增值税额为（ ）万元。",[476,478,480,482],{"key":20,"text":477,"correct":22},"33.568",{"key":24,"text":479,"correct":22},"36.800",{"key":28,"text":481,"correct":22},"38.368",{"key":31,"text":483,"correct":26},"38.603",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},1107966,"某工程采购的国产标准设备，设备制造厂交货地点出厂价为50万元，设备包装费用为2万元，运输及装卸费用为4万元，采购与保管费用为1万元。则该设备的购置费用为（ ）万元。",[488,490,492,494],{"key":20,"text":489,"correct":22},"50",{"key":24,"text":491,"correct":22},"52",{"key":28,"text":493,"correct":22},"54",{"key":31,"text":495,"correct":26},"57",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":24,"analysis":33},1107967,"某进口轿车，按人民币计算的离岸价为1000万元，国外运费率为7.5％，国外运输保险费率为4％，进口关税率为15%，增值税率为15％，消费税税率为25%，则该轿车应缴纳的消费税是（ ）万元。",[500,502,504,506],{"key":20,"text":501,"correct":22},"167.97",{"key":24,"text":503,"correct":26},"429.26",{"key":28,"text":505,"correct":22},"372.27",{"key":31,"text":507,"correct":22},"503.91",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":33},1107969,"某进口设备，按人民币计算的离岸价为500万元，国外运费率为8.2％，国外运输保险费率为4％，增值税率为13%，则该设备进口关税的计算基数是（ ）万元。",[512,514,516,518],{"key":20,"text":513,"correct":22},"500.0",{"key":24,"text":515,"correct":22},"652.5",{"key":28,"text":517,"correct":22},"585.0",{"key":31,"text":519,"correct":26},"563.5",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},1107970,"关于联合试运转费的说法，正确的是（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"联合试运转费包括单机的调试费",{"key":24,"text":527,"correct":22},"联合试运转费包括无负荷联动试运转费用",{"key":28,"text":529,"correct":26},"联合试运转费应为联合试运转所发生费用的净支出",{"key":31,"text":531,"correct":22},"联合试运转支出主要是材料费、不包含人工费",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},1107971,"下列费用中，属于工程建设其他费用的是（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"设备及工器具购置费",{"key":24,"text":539,"correct":22},"建设期利息",{"key":28,"text":541,"correct":22},"基本预备费",{"key":31,"text":543,"correct":26},"勘察设计费",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},1107973,"关于联合试运转费，下列说法中正确的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"包括对整个生产线或装置进行无负荷和有负荷试运转所发生的费用",{"key":24,"text":551,"correct":26},"包括施工单位参加试运转人员的工资",{"key":28,"text":553,"correct":22},"不包括试运转中产品销售和其他收入",{"key":31,"text":555,"correct":22},"包括对单台设备进行单机试运转工作的调试费",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},1107976,"某新建项目，建设期2年，申请银行贷款1080万元，预计第一年贷款480万元，第二年贷款600万元，年利率6%，则该项目估算的建设期利息为（ ）万元。",[560,562,564,566],{"key":20,"text":561,"correct":22},"47.664",{"key":24,"text":563,"correct":26},"62.064",{"key":28,"text":565,"correct":22},"65.160",{"key":31,"text":567,"correct":22},"93.600",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},1107977,"某新建化工项目，建设期为3年，共向银行贷款1500万，贷款情况为：第一年，400万元；第二年，800万元；第三年，300万元，每年贷款资金均衡投入。年利率为10%，则计算建设期利息后的本利和为（ ）万元。",[572,574,576,578],{"key":20,"text":573,"correct":22},"1650.00",{"key":24,"text":575,"correct":26},"1747.20",{"key":28,"text":577,"correct":22},"1810.00",{"key":31,"text":579,"correct":22},"1996.50",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},1107978,"根据设计要求，在施工过程中对某屋架结构进行破坏性试验，以提供和验证设计数据，则该项费用应在（ ）中支出。",[584,586,588,590],{"key":20,"text":585,"correct":26},"研究试验费",{"key":24,"text":587,"correct":22},"临时设施费",{"key":28,"text":589,"correct":22},"建设单位管理费",{"key":31,"text":543,"correct":22},{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":31,"analysis":33},1107979,"下列选项中，属于工程建设其他费用中勘察设计费的是（ ）。",[595,597,599,601],{"key":20,"text":596,"correct":22},"专项评价费",{"key":24,"text":598,"correct":22},"施工单位工程咨询费",{"key":28,"text":600,"correct":22},"工程保险费",{"key":31,"text":602,"correct":26},"建设单位自行完成的勘察设计费用",[604,607,610,613,616,619],{"id":15,"name":605,"category":7,"favorite":606},"领导干部任职前廉政法规知识测试题",92,{"id":608,"name":609,"category":7,"favorite":15},595,"建筑结构与设备",{"id":611,"name":612,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":614,"name":615,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":617,"name":618,"category":7,"favorite":8},534,"BIM工程师",{"id":620,"name":618,"category":7,"favorite":8},535]