[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":582},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,14,50,2641,[13,34,46,58,70,82,94,106,116,128,137,149,161,173,185,197,209,221,233,245,257,269,281,290,302,312,323,331,341,353,364,376,388,396,408,420,429,437,449,461,473,485,497,506,518,530,538,550,559,571],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1107864,1,"单选题","确定和控制建设项目全部投资的文件是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","总概算表",false,{"key":24,"text":25,"correct":22},"B","项目可行性研究报告",{"key":27,"text":28,"correct":29},"C","建设项目设计概算",true,{"key":31,"text":32,"correct":22},"D","建设项目施工概算","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1107865,"设计概算是以初步设计文件为依据，按照规定的程序、方法和依据，对（ ）及其构成进行的概略计算。",[38,40,42,44],{"key":20,"text":39,"correct":29},"建设项目总投资",{"key":24,"text":41,"correct":22},"建设投资",{"key":27,"text":43,"correct":22},"固定资产投资",{"key":31,"text":45,"correct":22},"流动资产投资",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1107866,"设计概算应按编制时（ ）的价格水平编制，总投资应完整地反映编制时建设项目实际投资。",[50,52,54,56],{"key":20,"text":51,"correct":29},"项目所在地",{"key":24,"text":53,"correct":22},"施工单位所在地",{"key":27,"text":55,"correct":22},"建设单位所在地",{"key":31,"text":57,"correct":22},"监理单位所在地",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1107867,"采用定额单价法编制施工图预算的过程中，工料分析表的编制依据是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"分部分项工程实物工程量和预算定额中的实物量",{"key":24,"text":65,"correct":22},"分部分项工程实物工程量和企业定额中的价格信息",{"key":27,"text":67,"correct":22},"定额项目中所列的工.料.机的数量",{"key":31,"text":69,"correct":22},"分部分项工程实物工程量以及预算定额中的实物量.企业定额中的价格信息",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1107868,"“总预算＝∑单位建筑工程费用＋∑单位设备及安装工程费用＋工程建设其他费用＋预备费＋建设期利息＋铺底流动资金”描述的是（ ）预算编制中的（ ）总预算。",[74,76,78,80],{"key":20,"text":75,"correct":22},"二级.建设项目",{"key":24,"text":77,"correct":29},"二级.单项工程",{"key":27,"text":79,"correct":22},"三级.建设项目",{"key":31,"text":81,"correct":22},"三级.单项工程",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1107869,"下列选项中，属于施工图预算编制依据的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"修正总概算",{"key":24,"text":89,"correct":22},"施工图设计图纸",{"key":27,"text":91,"correct":29},"预算定额",{"key":31,"text":93,"correct":22},"投资估算",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1107870,"能较快发现问题，审查速度快，但问题出现的原因还需继续审查的施工图预算审查方法是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"对比审查法",{"key":24,"text":101,"correct":22},"逐项审查法",{"key":27,"text":103,"correct":22},"标准预算审查法",{"key":31,"text":105,"correct":29},"“筛选”审查法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1107871,"按定额顺序或施工顺序，对各项工程细目逐项全面详细审查，这种审查方法是（ ）。",[110,112,113,114],{"key":20,"text":111,"correct":29},"全面审查法",{"key":24,"text":103,"correct":22},{"key":27,"text":99,"correct":22},{"key":31,"text":115,"correct":22},"重点审查法",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1107872,"施工图预算是建设单位（ ）的依据。",[120,122,124,126],{"key":20,"text":121,"correct":29},"在施工图设计阶段确定项目造价",{"key":24,"text":123,"correct":22},"进行施工准备",{"key":27,"text":125,"correct":22},"控制施工成本",{"key":31,"text":127,"correct":22},"监督检查执行定额标准",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":27,"analysis":33},1107873,"施工图预算的方法中，简单易懂，便于掌握，审查和发现问题速度快的审查方法是（ ）。",[132,133,134,136],{"key":20,"text":111,"correct":22},{"key":24,"text":99,"correct":22},{"key":27,"text":135,"correct":29},"筛选审查法",{"key":31,"text":115,"correct":22},{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":31,"analysis":33},1107874,"定额单价法编制施工图预算的过程包括：①计算工程量；②套用定额单价，计算工料机费用；③按费用定额取费，并汇总造价；④工料分析；⑤准备资料，熟悉施工图纸。正确的排列顺序是（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"④⑤②①③",{"key":24,"text":144,"correct":22},"④⑤①②③",{"key":27,"text":146,"correct":22},"⑤②①③④",{"key":31,"text":148,"correct":29},"⑤①②④③",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":31,"analysis":33},1107875,"设计概算负责人、审核人、审定人应由国家注册（ ）担任，具体规定由省、市建委或行业造价主管部门制定。",[153,155,157,159],{"key":20,"text":154,"correct":22},"监理工程师",{"key":24,"text":156,"correct":22},"一级建造师",{"key":27,"text":158,"correct":22},"二级建造师",{"key":31,"text":160,"correct":29},"造价工程师",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":24,"analysis":33},1107876,"编制建筑单位工程概算的方法有扩大单价法和（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":22},"定额单价法",{"key":24,"text":168,"correct":29},"概算指标法",{"key":27,"text":170,"correct":22},"工程量清单价法",{"key":31,"text":172,"correct":22},"实物量法",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":27,"analysis":33},1107877,"下列费用项中，不属于单项工程综合概算内容的是（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":22},"单位建筑工程概算",{"key":24,"text":180,"correct":22},"安装工程概算",{"key":27,"text":182,"correct":29},"铺底流动资金概算",{"key":31,"text":184,"correct":22},"设备购置费用概算",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":20,"analysis":33},1107878,"某工程设计有四个备选方案，经论证，四个方案的功能得分和单方造价如下表。按照价值工程原理，应选择的最优方案是（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":29},"甲方案",{"key":24,"text":192,"correct":22},"乙方案",{"key":27,"text":194,"correct":22},"丙方案",{"key":31,"text":196,"correct":22},"丁方案",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},1107879,"在价值工程活动中，描述某一个产品零部件“是干什么用的”，属于（ ）的工作内容。",[201,203,205,207],{"key":20,"text":202,"correct":29},"产品功能分析",{"key":24,"text":204,"correct":22},"产品结构分析",{"key":27,"text":206,"correct":22},"对象选择",{"key":31,"text":208,"correct":22},"产品设计",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":20,"analysis":33},1107880,"在价值工程的工作程序中，下列属于分析阶段工作步骤的是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":29},"功能评价",{"key":24,"text":216,"correct":22},"成果评价",{"key":27,"text":218,"correct":22},"方案评价",{"key":31,"text":220,"correct":22},"方案创造",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":31,"analysis":33},1107881,"为了简短工业建筑的工期，降低成本，获得最大的经济效益，最好选用工业化的（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"独立建筑",{"key":24,"text":228,"correct":22},"连锁建筑",{"key":27,"text":230,"correct":22},"节能建筑",{"key":31,"text":232,"correct":29},"体系建筑",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},1107882,"对于某精密机床加工制造企业的办公楼而言，在其建设工程总投资中，不应包括（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"涨价预备费",{"key":24,"text":240,"correct":22},"基本预备费",{"key":27,"text":242,"correct":22},"建设期利息",{"key":31,"text":244,"correct":29},"铺底流动资金",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},1107885,"在建设项目中，凡是具有独立的设计文件，竣工后可以独立发挥生产能力或工程效益的工程称为（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"分项工程",{"key":24,"text":252,"correct":22},"分部工程",{"key":27,"text":254,"correct":22},"单位工程",{"key":31,"text":256,"correct":29},"单项工程",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},1107886,"某建设项目，建筑安装工程费为40000万元，设备工器具费为5000万元，建设期利息为1400万元，工程建设其它费用为4000万元，建设期预备费为9500万元（其中基本预备费为4900万元），项目的铺底流动资金为600万元。则该项目的动态投资部分的金额为（ ）万元。",[261,263,265,267],{"key":20,"text":262,"correct":29},"6000",{"key":24,"text":264,"correct":22},"6600",{"key":27,"text":266,"correct":22},"11500",{"key":31,"text":268,"correct":22},"59900",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1107887,"某项目的建筑安装工程费、设备及工器具购置费的合计为7000万元，建设期2年，分期投入4000万元和3000万元。建设期内预计年平均价格总水平上浮率为5%，建设期贷款利息为735万元。若其工程建设其他费用为400万元，基本预备费率为10%，流动资金为800万元，则该项目的静态投资为（ ）万元。",[273,275,277,279],{"key":20,"text":274,"correct":22},"8948.5",{"key":24,"text":276,"correct":29},"8140",{"key":27,"text":278,"correct":22},"8940",{"key":31,"text":280,"correct":22},"9748.5",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},1107889,"下列费用中，属于建设工程静态投资部分的是（ ）。",[285,286,287,288],{"key":20,"text":240,"correct":29},{"key":24,"text":238,"correct":22},{"key":27,"text":242,"correct":22},{"key":31,"text":289,"correct":22},"运营期利息",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},1107890,"固定资产投资包括（ ）两部分。",[294,296,298,300],{"key":20,"text":295,"correct":22},"建设投资和无形资产",{"key":24,"text":297,"correct":22},"建设投资和铺底流动资金",{"key":27,"text":299,"correct":29},"静态投资和动态投资",{"key":31,"text":301,"correct":22},"固定资产投资和无形资产投资",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},1107891,"完成工程项目建设并达到使用要求或生产条件，在建设期内预计或实际投入的全部费用总和是指（ ）。",[306,308,309,311],{"key":20,"text":307,"correct":22},"建筑安装工程费",{"key":24,"text":43,"correct":22},{"key":27,"text":310,"correct":29},"建设工程项目投资",{"key":31,"text":41,"correct":22},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":20,"analysis":33},1107892,"（ ）是概算定额编制的基础。",[316,317,319,321],{"key":20,"text":91,"correct":29},{"key":24,"text":318,"correct":22},"估算定额",{"key":27,"text":320,"correct":22},"概算指标",{"key":31,"text":322,"correct":22},"估算指标",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},1107893,"某项目的建筑安装工程费、设备工器具费合计为7000万元，建设期2年，分期投入4000万元和3000万元。建设期内预计年平均价格总水平上浮率为5%，建设期贷款利息为735万元。若其工程建设其他费用为400万元，基本预备费率为10%，流动资金为800万元，则该项目的静态投资为（ ）万元。",[327,328,329,330],{"key":20,"text":274,"correct":22},{"key":24,"text":276,"correct":29},{"key":27,"text":278,"correct":22},{"key":31,"text":280,"correct":22},{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":27,"analysis":33},1107894,"施工图设计阶段的投资控制目标，不应超过（ ）。",[335,336,338,339],{"key":20,"text":93,"correct":22},{"key":24,"text":337,"correct":22},"设计总概算",{"key":27,"text":87,"correct":29},{"key":31,"text":340,"correct":22},"批准的投资限额",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},1107895,"预算定额是概算定额编制的基础，概算定额是估算指标编制的基础，这体现了建设工程项目投资的（ ）特点。",[345,347,349,351],{"key":20,"text":346,"correct":22},"投资数额巨大",{"key":24,"text":348,"correct":22},"投资差异明显",{"key":27,"text":350,"correct":22},"投资确定层次繁多",{"key":31,"text":352,"correct":29},"投资确定依据复杂",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1107896,"建设工程项目投资确定依据复杂，编制工程估算指标的基础是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"施工定额",{"key":24,"text":360,"correct":29},"概算定额",{"key":27,"text":362,"correct":22},"预算指标",{"key":31,"text":91,"correct":22},{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},1107897,"某些项目，可以在（ ）阶段，根据概算指标，形成设计总概算。",[368,370,372,374],{"key":20,"text":369,"correct":22},"可行性研究阶段",{"key":24,"text":371,"correct":29},"初步设计",{"key":27,"text":373,"correct":22},"技术设计",{"key":31,"text":375,"correct":22},"施工图设计",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":31,"analysis":33},1107899,"下列费用中，不应纳入工程建设其他费用的是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"工程监理费",{"key":24,"text":383,"correct":22},"研究试验费",{"key":27,"text":385,"correct":22},"生活家具购置费",{"key":31,"text":387,"correct":29},"工具用具使用费",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1107900,"建设工程项目初步设计一般依据（ ）编制相应的经济文件。",[392,393,394,395],{"key":20,"text":322,"correct":22},{"key":24,"text":320,"correct":29},{"key":27,"text":360,"correct":22},{"key":31,"text":91,"correct":22},{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},1107902,"建设工程投资的特点由（ ）的特点决定。",[400,402,404,406],{"key":20,"text":401,"correct":29},"建设工程项目",{"key":24,"text":403,"correct":22},"分部分项工程",{"key":27,"text":405,"correct":22},"建筑安装工程",{"key":31,"text":407,"correct":22},"设备及材料的类型",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},1107903,"建设工程投资在整个建设期内需随时进行动态跟踪、调整，直至（ ）后才能真正形成建设工程投资。",[412,414,416,418],{"key":20,"text":413,"correct":22},"项目估算",{"key":24,"text":415,"correct":22},"设计概算",{"key":27,"text":417,"correct":22},"施工预算",{"key":31,"text":419,"correct":29},"竣工决算",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":20,"analysis":33},1107904,"下列选项中可以作为预算定额编制依据的是（ ）。",[424,426,427,428],{"key":20,"text":425,"correct":29},"企业定额",{"key":24,"text":360,"correct":22},{"key":27,"text":320,"correct":22},{"key":31,"text":322,"correct":22},{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},1107905,"一个建设工程项目是由一个总体设计进行建设的各个（ ）汇集的总体。",[433,434,435,436],{"key":20,"text":254,"correct":22},{"key":24,"text":256,"correct":29},{"key":27,"text":252,"correct":22},{"key":31,"text":250,"correct":22},{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1107906,"监理公司对建设工程项目投资的控制，应贯穿于（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":29},"建设全过程",{"key":24,"text":444,"correct":22},"决策阶段",{"key":27,"text":446,"correct":22},"设计阶段",{"key":31,"text":448,"correct":22},"施工阶段",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},1107907,"下列措施中，属于施工阶段投资控制组织措施的是（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":29},"编制投资控制工作流程",{"key":24,"text":456,"correct":22},"参与合同修改",{"key":27,"text":458,"correct":22},"审核竣工结算",{"key":31,"text":460,"correct":22},"对变更方案进行技术经济分析",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1107908,"建设工程投资控制的原理是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":29},"动态控制",{"key":24,"text":468,"correct":22},"静态控制",{"key":27,"text":470,"correct":22},"相对控制",{"key":31,"text":472,"correct":22},"绝对控制",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},1107910,"下列施工阶段投资控制的主要工作中，属于工程计量和付款签证的包括（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"审查设计单位提出的设计概算、施工图预算",{"key":24,"text":480,"correct":29},"对施工单位在工程款支付报审表中提交的工程量和支付金额进行复核",{"key":27,"text":482,"correct":22},"工程竣工结算事宜不能与建设单位、施工单位协商达成一致意见的，按合同约定处理",{"key":31,"text":484,"correct":22},"与建设单位和施工单位协商一致后，应在施工合同约定的期限内签发费用索赔报审表",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1107911,"工程监理单位对使用单位提出的工程质量缺陷原因进行调查，并与建设单位、施工单位协商确定责任归属，这属于（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"决策阶段投资控制的工作",{"key":24,"text":492,"correct":22},"施工阶段投资控制的工作",{"key":27,"text":494,"correct":22},"投资控制的经济措施",{"key":31,"text":496,"correct":29},"工程保修阶段投资控制的工作",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":31,"analysis":33},1107912,"监理单位对工程质量缺陷原因进行调查，并与建设单位、施工单位协商确定责任归属，这属于（ ）。",[501,503,504,505],{"key":20,"text":502,"correct":22},"相关服务阶段投资控制的工作",{"key":24,"text":492,"correct":22},{"key":27,"text":494,"correct":22},{"key":31,"text":496,"correct":29},{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},1107913,"工程变更款项最终结算时，应以（ ）为依据。",[510,512,514,516],{"key":20,"text":511,"correct":22},"经建设单位同意的暂定价格",{"key":24,"text":513,"correct":29},"建设单位与施工单位达成的协议",{"key":27,"text":515,"correct":22},"实际发生的款项",{"key":31,"text":517,"correct":22},"竣工结算款",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},1107914,"做好工程施工记录、保存各种信息档案，参与处理索赔事宜，属于施工阶段投资控制的（ ）措施。",[522,524,526,528],{"key":20,"text":523,"correct":22},"组织",{"key":24,"text":525,"correct":22},"经济",{"key":27,"text":527,"correct":22},"技术",{"key":31,"text":529,"correct":29},"合同",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":31,"analysis":33},1107916,"建设工程项目施工图设计一般依据（ ）编制相应的经济文件。",[534,535,536,537],{"key":20,"text":322,"correct":22},{"key":24,"text":320,"correct":22},{"key":27,"text":360,"correct":22},{"key":31,"text":91,"correct":29},{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1107917,"建设工程投资只能通过估算、概算、预算等特殊的程序依次计算，这体现了建设工程投资（ ）的特点。",[542,544,546,548],{"key":20,"text":543,"correct":22},"差异明显",{"key":24,"text":545,"correct":29},"需单独计算",{"key":27,"text":547,"correct":22},"确定依据复杂",{"key":31,"text":549,"correct":22},"确定层次繁多",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1107919,"从（ ）上采取措施，包括明确项目组织结构，明确投资控制者及其任务，以使项目投资控制有专人负责，明确管理职能分工。",[554,555,556,557],{"key":20,"text":523,"correct":29},{"key":24,"text":527,"correct":22},{"key":27,"text":525,"correct":22},{"key":31,"text":558,"correct":22},"管理",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},1107920,"审核承包人编制的施工组织设计，是项目监理机构在施工阶段采取的（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"组织措施",{"key":24,"text":566,"correct":22},"经济措施",{"key":27,"text":568,"correct":29},"技术措施",{"key":31,"text":570,"correct":22},"合同措施",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1107921,"项目监理机构在施工阶段进行投资控制有多种措施，下列选项属于合同措施的是（ ）。",[575,577,579,580],{"key":20,"text":576,"correct":29},"对发包人原因导致承包人机械闲置，予以费用补偿审核",{"key":24,"text":578,"correct":22},"严格控制设计变更",{"key":27,"text":458,"correct":22},{"key":31,"text":581,"correct":22},"改进施工工艺和施工技术",[583,586,589,592,595,598],{"id":15,"name":584,"category":7,"favorite":585},"领导干部任职前廉政法规知识测试题",92,{"id":587,"name":588,"category":7,"favorite":15},595,"建筑结构与设备",{"id":590,"name":591,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":593,"name":594,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":596,"name":597,"category":7,"favorite":8},534,"BIM工程师",{"id":599,"name":597,"category":7,"favorite":8},535]